New Feature:
Real-Time Collaboration for Schedules: This feature enables team members to work together simultaneously, ensuring updates and changes to schedule cells are reflected instantly for all collaborators. Learn More
Connection status available on schedules page
Bug Fixes:
View Management: When creating a new default or personal view and subsequently editing it, any changes to the view type will now move it to the correct section, instead of being deleted.
Dropdown Icon in Schedule Table: The dropdown icon issue in the schedule table header has been resolved for smoother navigation.
Attachment Field: Users can now add an attachment field with the option to upload either a single file or multiple files, depending on the field configuration.
Project Selection for Copying Products: The source project is now disabled when selecting a project for the "Copy-Product-to-Project" feature, preventing incorrect selections.
Search Bar Consistency: The search bar has been fixed to provide consistent and accurate results, regardless of how frequently it is used.
Homepage Project Name Alignment: Fixed the misalignment issue for projects with very long names on the homepage.
UI Updates on Conversations Page: The "All Conversations" and "Project-Specific Conversations" pages have been updated to maintain naming consistency by renaming other conversation blocks to βX Conversation with Acelab.β
Compare Page Data Table: The data table on the compare page now correctly displays both the manufacturer's name and product name in the title.
Project Banner Image Attachments: Attachments can now be downloaded for the project banner image on the project information page.
Product Row Sync Across Views: When a product row is added to a specific view in a schedule, it will now appear in all other views within that schedule.