Cost
can be set in the Metrics settings at a number of different levels: site, building, parking and area type. Costs can also be built out at a building system level.
The total cost is then displayed in the metrics sidebar.
The total cost is shown as a percentage of budget beside the Cost section header. Site, Building, and Parking cost is shown in dollars - to view as a percentage, hover on the corresponding section of the bar chart in the Cost section.
Setting a budget
To set a budget:
Open metrics settings menu
Navigate to project section
Enter a value in the
Budget
input