On the Assignar dashboard you can say whether a task uses equipment, and which assets, so the right plant is recommended when you schedule the task. For example, the Operator task can recommend Excavator 20t - EX01. You need the Add Tasks/Machines user access module, and the assets must already be set up.
The old help centre called tasks roles, and your company can rename some words in Assignar, so you might see Role instead of Task.
Asset Requirement options on the dashboard
The Asset Requirement setting on a task's Assets tab on the Assignar dashboard has three options. The table below shows what each one does.
Option | What it means |
No Assets needed | The default. The task doesn't use assets. |
Assets needed for this Task | Assets are recommended but optional. |
Assets required for this Task | An asset is mandatory. On the Assignar mobile app, a worker in this task can't submit a timesheet until they add an asset; the app shows "Asset required for this role." |
Only Assets required for this Task stops a worker submitting a timesheet without an asset.
Set the asset requirement and add assets to a task on the dashboard
To set the asset requirement for a task on the Assignar dashboard:
Go to Resources > Tasks and click the task, for example Operator.
In the panel, click the Assets tab.
Choose Assets needed for this Task or Assets required for this Task in Asset Requirement. A search box appears.
Click the search box (Add Assets to Task) and pick the assets the task uses. The list stays open so you can pick several.
Click Save at the bottom of the panel.
The dashboard shows "Successfully updated Task". The Assets tab shows how many assets are linked, for example Assets (1).
If you set a requirement but don't add any assets, every asset can be used for the task. Add assets to narrow it down to the plant you actually use.
Remove an asset from a task on the dashboard
To remove an asset from a task on the Assignar dashboard, open the task's Assets tab, click the ✕ at the end of the asset's row, click Confirm, then click Save. Removing an asset from a task doesn't archive the asset.
Change the order (ranking) of a task's assets on the dashboard
The order of a task's assets on the Assignar dashboard is its ranking: the first asset is your first preference when you schedule the task. The side panel doesn't show the ranking. To change it:
Open the task and click the open-in-new-window icon at the top of the panel. The full task page opens in a new browser tab.
Click the assets tab.
Drag the assets into the order you want. To add more, use Add Asset(s).
Click Save assets.
You need the Edit Asset Ranking user access module to change the ranking. Without it, the tab says "You do not have permissions to view/edit asset ranking."
Why doesn't the Assets tab let me add assets on the dashboard?
If there's no search box on a task's Assets tab on the Assignar dashboard, the Asset Requirement is set to No Assets needed. Choose one of the other two options first. If an asset you want isn't in the search results, it doesn't exist yet or is already on the task. See How do I add, edit or archive an asset on the dashboard?.