Skip to main content

How do I add, edit or archive an asset on the dashboard?

On the Assignar dashboard you add each piece of plant or equipment as an asset, then keep its details up to date and archive it when you stop using it.

On the Assignar dashboard you add each piece of plant or equipment as an asset, then keep its details up to date and archive it when you stop using it. Archived assets keep their history. You need the Add Tasks/Machines module on your User Access tab to do this. To add many assets at once, import them instead: see How do I import assets on the dashboard?.

Your company can rename some words in Assignar, so you might see a different word for Asset. The old help centre called assets "equipment".

Video (1:29): The Assets list and adding an asset.

Add an asset on the dashboard

To add an asset on the Assignar dashboard:

  1. Go to Resources > Assets / Attachments.

  2. Click Add New. A side panel opens.

  3. At the top of the panel, type the asset's name where it says Asset Name. The name is required and must be unique.

  4. Optionally, click the photo circle to add a photo (any image file).

  5. Fill in any other details. The fields are listed in "Asset fields on the dashboard" below.

  6. Click Save.

The dashboard shows "Successfully added Asset" and the asset appears in the Active list.

The Add New asset side panel on the dashboard.

Asset fields on the dashboard

This table lists the fields on the asset form on the Assignar dashboard. Only the name is required.

Field

What to enter

Asset Name

The name people will see in the Scheduler and on the mobile app, for example "Excavator 20t - EX01". Required, up to 255 characters, and no two assets can share a name.

Class

A group you report on, for example "Excavators". Set classes up with Manage Asset Classes.

Description

Up to 255 characters.

Rego Number

The registration number, up to 20 characters.

Year, Make, Model

Up to 20, 100 and 100 characters.

Current number reading

The odometer or hour-meter reading, "(i.e. odometer, operating hours etc...)". Number expiry alerts compare against this.

Serial Number

Up to 150 characters.

Avg Hourly Charge Rate

A whole number. The Charts tab uses it to estimate revenue.

External ID

Only for linking to another system. "External ID is used for importing data from external systems. If you are not sure what this is, leave it blank." Up to 50 characters and unique.

Workers

Workers who usually operate this asset.

Skills

Skills the asset needs.

Attachments

Asset attachments that go with this asset.

Select Tags

Tags. Workers only see assets with matching tags if their access is limited by asset tags.

Suppliers

Suppliers that provide this asset.

Tasks

Tasks (roles) this asset can be used for.

Comments

Free text.

Edit an asset on the dashboard

You can edit an asset on the Assignar dashboard in two places:

  • Side panel: on Resources > Assets / Attachments, click the three-dot menu at the end of the asset's row and choose Edit. Change the fields and click Save.

  • Full page: click the asset's row. On the Details tab, change the fields and click Save at the bottom.

The dashboard shows "Successfully updated Asset" followed by the asset's name.

Set up asset classes on the dashboard

Asset classes group assets for reporting, for example all excavators under one cost centre. To manage asset classes on the Assignar dashboard:

  1. Go to Resources > Assets / Attachments.

  2. Click Manage Asset Classes. The Asset Classes window opens.

  3. Click Add, enter a Name (required, up to 100 characters), and optionally a Code (up to 50 characters) and a Description (up to 255 characters).

  4. Click Save.

To change or remove a class, use the menu on the class. Deleting asks "Are you sure you want to delete this Asset class?". Two classes can't have the same code: the dashboard shows "Duplicate Code:" followed by the code.

Archive or unarchive an asset on the dashboard

Archiving hides an asset from the active list without deleting its history. To archive an asset on the Assignar dashboard:

  1. Go to Resources > Assets / Attachments.

  2. Click the three-dot menu at the end of the asset's row.

  3. Choose Archive.

The asset moves to the Archived list straight away; there is no confirmation. To bring it back, switch the list to Archived, open the row's three-dot menu and choose Unarchive.

An archived asset's documents no longer appear in expiry alerts.

Why can't I save an asset on the dashboard?

These are the common reasons an asset won't save on the Assignar dashboard.

  • "This field is required." under the name. Every asset needs a name.

  • "Failed to create asset. A asset with this name or external_id already exists." Another asset, active or archived, already uses that name or External ID. Choose a different name, or find and unarchive the existing asset.

  • "Failed to upload Asset photo". The photo did not upload. Check it is an image file and try again.

  • No Add New button, or the fields are greyed out. You don't have the Add Tasks/Machines module, or you have Read Only. Ask an admin to change your User Access.

Related articles

Did this answer your question?