Installation day is a big step toward powering your home with the sun. Here's what to expect and how to get ready so your install goes smoothly.
Before install day
Review where your equipment goes. Your install page (the link your Project Manager sends when your install is scheduled) shows your site plan with each part numbered. Locations are set to meet code and safety clearances, so please ask any questions before install day.
Clear about 3 feet in front of your main electrical panel, any sub panels and the wall where your equipment goes. If that's in your garage, move cars and stored items away from that wall.
Keep your driveway clear from 7 AM for our install vehicle, or tell us where the crew should park.
Unlock gates, put pets inside, and share any gate codes.
Keep about 3 feet clear in front of your panel and equipment wall
Install day
Arrival
The crew arrives between 7 and 10 AM. An adult should be home at the start: the crew lead walks through your plan with you before work begins.
Our install vehicle on install day
The work
Racking is installed on your roof (or ground mount).
Solar panels are mounted on the racking.
Wiring connects your panels to your home's electrical system.
Finished solar panels on a roof
Power off for part of the day
To connect your system safely, your power will be off for part of the day. The crew lead will tell you before it goes off.
Cleanup and walkthrough
The crew confirms everything is mounted and connected, cleans up, and shows you what was installed.
How long it takes
Most installs take one day. Larger or more complex systems can take longer. We'll tell you ahead of time if yours needs more than one day.
After your install
City inspection: usually within about 30 days.
Utility approval (Permission to Operate): usually about 4 weeks after inspection.
Turn-on: once approved, we turn your system on and you'll get access to your monitoring app.
Common questions
What if the weather is bad?
We watch the forecast. Light rain usually isn't a problem. If conditions aren't safe, we'll reschedule with you.
Do I need to be home all day?
An adult should be home when the crew arrives for the walkthrough. After that, you don't need to stay home the whole time.
What if something changes before install day?
Text your Better Earth Project Manager as soon as you can.



