The most common situations and how to solve them.
A service I expected is not among the generated lines
The grid was skipped: the reasons are in Generating a quote from an order, section “Why some services are “skipped””. To find out which one is yours, open the grid and use Test with a sample boat with that boat's data.
I see no grid in the “Services to generate” panel
Only the grids of an enabled price list, shown on orders and offered for the order type appear. The other price lists are listed at the bottom with Show them anyway. If there is nothing, create or complete the grids in Settings → Prices lists, products and services → Price grids (detailed pricelist).
Did the changes to the boat data in the quote change the boat record?
No, unless you ticked “Also propagate the edited boat data back to the boat”. Without that tick, the changes apply only to that order.
I changed a grid but the quotes already made did not change
That is intentional: the rate is frozen on the line. To update it see Why this price?, section “The key point: it is a frozen snapshot”.
I do not see “Why this price?” on a job
The entry is in the job's More actions menu and appears only on lines generated from the pricelist, for people with the Show price permission. See Why this price?.
A generated line is at zero and shows a text instead of the price
The grid answers with a wording (for example “Quote to follow”): the line stays at zero and the quote prints the text. See Generating a quote from an order.
I put 0 in a cell to “remove” it, but the price stays 0
0 is a custom value equal to zero, which “Generate” keeps. To go back to the calculated value, empty the cell (leave it blank).
I regenerated and my custom prices are still there
Correct: “Generate” and “Regenerate all” always keep the custom values. To remove them all use “Clear custom prices” (irreversible).
The cells do not appear
They appear only after pressing “Generate”. Without a formula it creates empty cells to fill in by hand; however you need at least a scale (rows) and/or some variants (columns).
The grid has the “Incomplete” badge
One or more mandatory fields are missing: Product, Price list, VAT rate. Use the “Complete it” link in the yellow notice. As long as it is incomplete, it is skipped on orders.
I cannot save: it says the expression is not valid
Probably a syntax error (e.g. an unclosed quote) or a variable not allowed in that box. Check the box's context (see the article Expressions): each box allows different variables.
In the generation formula I used engine.fuel (or boat.…) and it does not work
In generation there are no boat.* / engine.*: it runs per cell, before knowing the boat. To differentiate by fuel or number of engines create a variant (column) and use variant.CODE. See the article Expressions.
A column never “hooks” the right boat
Almost always it is a code problem: categorical values are case-sensitive and must be the exact code (DIESEL, not Diesel; SAIL BOAT with the space). Open “See allowed values…” and copy the code from the left column.
I need two numbers for the price (e.g. size AND power)
A scale uses one number only. The other must be modelled as a variant (column). See the article Detailed pricelist: the basic concepts.
I added three variants for the three fuels but I see only one column
For several values of the same characteristic you need one variant with several options (Diesel, Petrol, Other) → 3 columns. Three separate variants are merged into a single combined column.
I have too many columns
Variants multiply (Cartesian product): 4 options × 2 options = 8 columns. Reduce the number of options or variants.
I changed a scale/parameter shared by several grids
Go to the grid list and press “Regenerate all” to realign all the matrices at once (custom prices stay).
Difference between “Generate”, “Regenerate all” and “Clear custom prices”
See the table in History and maintenance.
What is the difference between “Bulk % change”, the ▾ button per column/band and the “Cross-grid % revision”?
They are three different levels. The “Bulk % change” adjusts all the cells of one grid in one go; the ▾ menu on a header applies the change only to that column (variant) or that band (scale row); the “Cross-grid % revision” adjusts several grids together in bulk (useful for an annual adjustment). The first two are described in the article Matrix tools: Excel-style editing, heat map and deviations; the cross-grid revision in the article Price revision and export: cross-grid, Excel and PDF.
I applied a % revision twice and the prices went up too much
Percentages compound: applying +5% twice is not +10% but +10.25% (it applies on the price already revised, not on the starting one). Do not “undo” with an inverse percentage: use “Reset to formula” on the cells concerned to go back to the calculated value, then repeat the revision just once with the right percentage. See the article Price revision and export: cross-grid, Excel and PDF.
What is the heat map for?
It is a view that colours the cells from the lowest to the highest value, so you spot at a glance out-of-scale prices, gaps or inconsistencies in the matrix. It changes nothing: it is only a visual aid. See the article Matrix tools: Excel-style editing, heat map and deviations.
What does the % badge under a cell mean and how do I go back to the formula?
The % badge shows that the cell has a custom value (adjusted by hand or by a % change), different from the one calculated by the formula. To bring it back to the automatic value use “Reset to formula” (emptying the cell has the same effect). See the article Matrix tools: Excel-style editing, heat map and deviations.
How do I export prices to Excel or PDF?
From the grid's Actions panel, Export group, you can export the matrix: to Excel (to share or rework it) or to PDF (for printing or a paper price list). See the article Price revision and export: cross-grid, Excel and PDF.
I pasted from Excel but nothing was imported
Excel-style paste works only if the copied block matches the matrix: the number of rows × columns must be the same as the destination selection. If it does not match, the import is ignored. Check that you have not included extra headers or columns. See the article Matrix tools: Excel-style editing, heat map and deviations.
How do I prepare next year's prices without touching the current ones?
Create a dated next edition of the grid: you work calmly on the new prices, while the ones in force stay active until the validity date of the new edition. See the article Dated editions of the pricelist: validity and next edition.
How do I reuse or move a grid to another marina?
If you stay in the same environment, save the grid as a template and recreate it where you need it (see the article Reusable grid templates). To take it to another marina or another installation, export it to a JSON file and import it there (see the article Moving a grid between marinas (JSON file)).
The generated prices all seem wrong by the VAT amount
Check the grid's “Prices include VAT” field: it must match how you entered the values in the matrix (net or gross). The order line always stores net and VAT separately.
I do not see the “Detailed” group in the contract's “Add details” menu
That group (with “Guided with wizard” and “Fully automatic”) appears only if the marina has at least one marina grid linked to a price list shown on contracts. If you only use the classic price lists the section stays hidden: create or complete a marina grid and link it to a Marina pricelist. You also need the Contracts → Update permission. See Generating mooring rates on a contract.
In the “Seasonal & temporal rates” page I do not see the season columns
The Marina pricelist of that grid has no seasons yet. Open the Marina pricelist, press “Add season” and add at least one date period to the season: only then, in “Seasonal & temporal rates”, do the season columns appear next to “Base (default)”. See Marina pricelist: seasons and prices.
I changed the price list/seasons but the contracts already made did not change
That is intentional: the generated mooring lines are frozen. To realign them see Generating mooring rates on a contract, section “The lines are frozen”.
How do I exclude a single line before generating it?
After Preview, turn off the Include this line pill: see Generating a quote from an order (orders) and Generating mooring rates on a contract (contracts).
What is the difference between a Marina grid and a Shipyard grid?
The Marina grid prices a berth/mooring on a contract (with Marina pricelist, seasons and seasonal rates); the Shipyard grid prices a service on an order. The type is chosen at creation, on the “What is this price grid for?” screen.
Why does the price change in high season?
Because that date falls in a season with a modifier set in the “Seasonal & temporal rates” page: an absolute price, a percentage (“+10%”, “-8%”) or a multiplier (“×1.1”) on the “Base (default)” price. When two seasons overlap, the one with the higher priority (lower number) wins. To check the exact price of a day use “Check the exact rate on a date”; for the whole chain open “Why this price?” on the generated line.
