The Calendar (Shipyard → Planning → Calendar and board, then Calendar) is the place where you assign operators to the jobs of an order.
The screen
Left column — the list of orders, with the Show: Open / Closed / All selector and the search; once you choose an order, its jobs, with Back to the order list, the Color by selector and the search for jobs. Above the calendar, Show equipment and Only collisions. The list includes the yard's orders and quotes; with Open, quotes that were not accepted and quotes entirely turned into an order do not appear (the order appears).
Next to each order's number the list shows a label (Ready, On its way, Arrives late, Missing) when there is still something to pick from the warehouse (Stock requirements).
Calendar on the right — with the view buttons Day · Week · 2 weeks · 4 weeks · Month.
You can hide the left column to use the calendar at full width.
Assigning operators to a job
Drag a job from the column onto the desired day/time (or click it: it places it at the current time).
The “Plan operators” window opens, showing the job's information read-only (Article code, Article, Description and Notes, scrollable), the operators to assign (you can choose more than one: you create one assignment for each, on the same window), the work time (a field for the hours and a selector for the minutes, 0 or 30) and the selected window in long-form dates, with below it the summary of effort and duration (see further on).
Press “Save”.
Above Operators there is the Team field: choosing a team adds all the operators of the planner who belong to it to the selection (you can combine several teams, then remove or add people). One assignment is still created for each operator. Teams are managed in Settings → Users and access → Users and roles → Teams.
While the window is open, the absences of the chosen operators show up on the calendar as coloured stripes.
Tip. The last operators used are remembered and offered again already selected, so you can plan faster.
Effort and duration (in the window)
Below the selected window a summary shows the effort (the hours you entered) and the duration in calendar days. How they are calculated is in How long a job takes and how it is spread.
Editing an assignment already made
Click the bar on the calendar: “Edit assignment” opens, with the same fields. You can change the operator, the hours of work or the start. Alternatively you can drag the bar (move) or pull its right edge (change the duration) — see the article How long a job takes and how it is spread.
The right click on the bar opens a menu: Link to others and Unlink from group (linked bars move together: see The Board (operator and equipment rows)), Write to the operators (a message to those planned on the job, in the job's conversation), Delete this one and Delete all for this activity.
Colours and views
“Color by” changes the colour criterion (Work status, Article group, Article category); group and category colours are the ones set in the price list.
The yard's closing slots are in grey; the time range shown narrows around the yard's schedule (see the article Yard and operator schedules).
Re-planning a job that is already planned
If you try to plan a job that is already planned, BlueShell tells you and asks whether you want to go ahead anyway: it is a reminder, not a block.