I moved a boat but nothing changed
Moves stay pending until you press Apply all changes. See Moving boats and applying the changes.
I cannot drag the bars
You need the permission to edit contracts: without it, the planner is read-only. To select periods and use Create contract you also need the permission to create contracts.
A contract or a berth does not appear in the planner
Check, in this order:
the berth must be available and have the Show this resource on Shceduler. checkbox active (in its record);
the contract type must not be hidden in the planner's Settings, Show this contracts types item;
contracts in the marina's own name and “managed” contract types are not shown;
the period you are looking for must be within the 90 visible days (the Search instead looks at everything).
After a move the price stayed the same
This is intended: the planner does not recalculate prices. Review the amounts in the contract.
Does the switch day count twice?
The switch day is shared: the boat leaves one berth in the morning and moors at the other (for example from the 10th to the 15th on one berth, from the 15th to the 18th on the other). If the price list also counts the last day, that day may appear on both periods.
Is the last day of a contract free or occupied?
There are two different settings:
End date policy (planner settings, for each user): only changes how you see it on the timeline, Occupied or Free;
Consider the berth occupied on the checkout day (marina configuration, Moorings tab): changes the real availability, that is, whether the departure day is free for the next boat. It also applies to Find a berth and Make room.
“Show only free resources” hides berths that are free today
The filter checks the whole visible period on the timeline, not a single day, and also counts boats that are physically present.
“Find a berth” does not propose a berth I know is free
Results are at most 10;
only the berths shown on the timeline count: check the filters by class and pier;
a berth with unknown measurements is not proposed by Make room.
Make room never moves a certain boat
It does not move boats already present in the marina, nor stays longer than the Max days of a movable stay limit (30 days, if you have not changed it in the marina configuration).
How do I split a stay over two berths?
With a right click on the bar → Move with split. Dragging the bar corrects the period, it does not split it.
What is the difference between “Scheduler” and “New Scheduler”?
Until 30 November 2026 the Marina → Contracts menu has two items: Scheduler (the previous version) and New Scheduler, the one described in this guide. From 1 December 2026 a single item remains, Scheduler, and it is the new one: the previous version leaves the menu and the home page choice, and whoever had it as home page finds the new one.
