π¨ Important Notice π¨
Make sure to synchronise your mobile application Bulldozair (Phones and tablets) with the correct project before visiting the field,
This step is very important, because it allows you to have access to all the details in your project !
β‘οΈ To simplify the procedure in 5 easy steps β‘οΈ
1οΈβ£ Choose and open your Plan
2οΈβ£ Place your Task in the requested Position π
3οΈβ£ Take your Photos π·
4οΈβ£ Assign your Tasks to others π
5οΈβ£ Give a Title to your Task βοΈ
Using Bulldozair on field
πΊ Once on field, open your project on the Bulldozair app from your mobile/tablet and click the tab Plans
Open the plan of your visit:
π You can zoom for a better view, then drag and drop the pince in the exact position
π·. Take a picture, add a drawing then Save.
π Assign the Task to the right company/contractor.
β If your list is emptyβ, you can Skip it for now then set it up later.
βοΈ Tap, dictate or choose the Task's Title from the Dropdown List
π‘ Extra Tips π‘
The Dropdown List is normally empty by default; Each time you create a Task, the title will be automatically added allowing you to use the previous one.
to go Faster, it is possible to customize the dropdown list according to the contractor chosen in the previous step.
π Perfect Job ! Now your Task is perfectly created and saved π
π Keep going with your field visit, and create the next Task with the same steps.
After the site visit
π Connect to a good Wi-fi and press the Sync Tab to save your work