The status of the goods when received by Chowbus Stand is as follows
Open the package to see the inner box of Chowbus Stand
You can get a base, power adapter, and tool kit
After unpacking all accessories
Assemble the power cord to the PD interface according to the diagram and install the network cable correctly.
Unscrew the screws as shown in the figure
Push the cover toward the screw side to open it
Insert the IPAD 9 into the port as shown in the figure.
Then push the cover in the opposite direction of the screw and tighten the screw (do not overtighten the screw, just tighten it normally)
Chowbus Stand is installed successfully
If you have any other questions, please contact Chowbus customer service!
