Hard Cost per Gross Square Meter or Gross Square Foot
Hard Cost on the Site and Building Assumptions Sheet in Step 3 refers to Direct material costs/trade, General conditions, or any contingencies associated with each use type, if the user’s assumption include them on the assumption sheet. This is a user's assumption.
Other Equivalent Terms
Construction Cost
Brick-and-mortar costs