Overview

The Earthaus BUILD Pozzolanic Hydraulic Lime (PHL) Plaster System is designed for Faswall® Block construction. It is standardized but versatile for unique project needs.

Key Properties:

  • High-plasticity lime + pumice pozzolan for workability, adhesion, and durability.

  • Breathable plaster system: allows Faswall to release moisture.

  • Slow, steady curing supports flexibility during early structural movement.

Exterior System (Faswall Walls):

Layer

Product

Thickness

Coverage

Scratch Coat

3/8" (1 coat)

65 ft²

Brown Coat

PHL Binder

3/8" (1 coat)

75 ft²

Finish Option 1

1/4" (1 coat)

50 ft²

Finish Option 2

1/8" (1 coat)

100 ft²

Sealer (optional)

TBD

Interior System (Faswall Walls):

Layer

Product

Thickness

Coverage

Scratch Coat

PHL Binder

1/4" (1 coat)

100 ft²

Brown Coat

PHL Binder

3/8" (1 coat)

75 ft²

Finish Option 1

1/8" (1 coat)

100 ft²

Finish Option 2

1/16" (1 coat)

250 ft²

Sealer (optional)

700 ft²

Substrate Preparation

  1. Inspect the Walls — The surface must be clean, dry, and free of debris. Repair cracks before plastering.

  2. Dampen Before Plastering — Pre-dampen with light mist coats; the goal is darkened but not saturated.

  3. Plaster Stops & Lath — Protect dissimilar materials with felt paper plus expanded metal lath. Recommended: embed fiberglass reinforcing mesh in the brown coat to reduce cracking.

  4. Protect Surrounding Areas — Mask off windows, doors, and non-plaster surfaces.

PHL Binder Installation Over Faswall

Scratch Coat:

  • Thickness: 3/8". Score horizontally 1/4" deep while wet. Must fully cover the Faswall.

  • Cure 10 days before the brown coat.

Brown Coat:

  • Thickness: 3/8". Cure 10 days before the finish coat.

Sand Aggregate (Mandatory):

  • Scratch coat: 1 bag PHL Binder + 3 × 5-gal buckets sand.

  • Brown coat: 1 bag PHL Binder + 5 × 5-gal buckets sand.

Applying the Finish Coat

After the brown coat has cured (10 days), apply your selected finish from the system table above:

Pigment color and optional sealer are listed in the system table above.