If you are trying to create a Change Order and the desired module does not appear in the dropdown menu despite the panel being active in the installer's equipment in both V1 and V2, this can be fixed by the installer.
This needs to be done by a user assigned to the installer company with Super Admin permissions in V1.
The installer must log in, then click EPC, then select Equipment, then select Modules
Once there, open the desired module.
Ensure that the box under "All Dealers" is checked.
/span>
Once "All dealers" is checked, the module will show up as an option in the change order list.