Skip to main content
All CollectionsPartner Support
7 Steps to Going Solar
7 Steps to Going Solar

7 Steps to Going Solar

Emilie avatar
Written by Emilie
Updated yesterday

Solar can be complicated so this guru card is here to show a guide to every step of the way through the Solar process with our Partner's customers. The planet is going to continue to run by the sun.

/span>

  1. Site Survey: An expert Site Technician will visit to measure, review, and finalize the plans initially discussed.

  2. Design Review: Follow-up to review any tweaks or changes to our initial plan and make sure the lead is happy with the result.

  3. Permitting: Handle the permitting and paperwork with the city. The EPC will let the lead know when everything is good to go.

  4. Installation: The roof gets an upgrade! The average install will take about a day.

  5. City Insection: Once the leads system is installed, the EPC will schedule an inspection with the city. A representative will stop by and ensure the new system is up to code.

  6. Utility Connection: The EPC will work with your utility to get everything connected. The utility will connect your system to the grid and may need to install a new meter.

  7. Power on: Flip the switch, sit back and put the sun to work!

Link for information above

Did this answer your question?