If a solar designer reaches out and the production is not matching what is in the survey it is because of the PV Watts calculation being used within Optimus.
More info here: PV Watts for Optimus Powered by Aurora Designs
To find that setting first check the deal type they are using.
/span>
Then locate that deal type within the deal type builder.
/span>
Once you have found the correct deal type, hit build.
Please note: Do not change any of the settings while in the deal type builder, this is just to see if PVWatts is turned ON
/span>
After hitting build, scroll down to the bottom and there is a setting for PV Watts calculation, if this is turned on that is why the production values are not matching.
/span>