Drop Down Menu Guide

S
Written by Sophia Colapietro
Updated over 4 months ago

The drop down menu guide options are as follows:

  • File

FILE OPTIONS

Import local gantterAi™ file

Choose a gantterAi™ File from your Local Drive and Import into Planner.

Import from MS Project

MS Project files (.MPP) and files in MS Project XML format can be imported.

Import from P6 (XER)

Files of (.XER) can be imported.

Properties

Manage the following Schedule Properties - (General, Duration, Regional, Time Defaults, Resources, Notes, Links, Risks)

Export to local gantterAi™ file

Export your View as a (gantter™) file.

Export to MS Project (XML)

Export your View as a .XML file.

Export to P6 (XER)

You have the option to - Export Roll Up Tasks Only, Export Rollup and Summary Tasks or Export All Task

Export to CSV (download)

Export your View as a .CSV file.

Publish to Procore

The following Procore Publishing options are available - (Procore Connector Settings, Publish Now, Open Procore).

Export milestones to iCalendar(Download)

Export your Milestones as a .ICS file.

Export milestones to web Calendar

Copy the gantterAi™ URL and use your web calendar's 'Add by URL" feature to add a new calendar with all the milestones for the schedule.

  • Edit

EDIT OPTIONS

Undo

Undo Edits CTRL-Z

Redo

Redo Edits CTRL-Y

Cut

Cut Text CTRL-X

Copy

Copy Text CTRL-C

Paste

Paste Text CTRL-V

  • View

VIEW OPTIONS

Reset View to Default

Selecting this resets the View to Default.

Columns

Date & Time, Zoom In & Zoom Out option, Task Summary, Colour preference

Sidebar

Unchecking this option hides the 5 Sidebar Mode Options.

Sidebar Modes

Click to Select a Sidebar Mode: Board, Schedule, Risks, Resources, Calendars

  • Actions

ACTIONS OPTIONS

Insert Above

Insert a Task Above the Selected Task.

Insert Below

Insert a Task Below the Selected Task.

Delete

Delete the Selected Task.

Auto-Level Resources

Automatically selects the resources while assigning the task.

Clear Leveling

Resources are equally divided for the Tasks assigned.

Properties

View Task Board Properties.

  • Baselines

BASELINES OPTIONS

Manage baselines

Add and Manage Baselines

None

Click to Select and Show a Baseline.