Push Groundplan quantities to create a new project or service quote in Simpro along with the project plans.
Variation quotes for existing Simpro jobs can also be created and merged into an open job within Simpro. See our FAQ for more information.
Setting cost centre and labour rates
Cost centres and labour rates are allocated to counts, lengths, areas, additional items and additional labour.
π Note:
All parts with a cost centre will appear in a Simpro quote
Multiple cost centres can be assigned within a stage
Ensure all labour has a cost centre and a labour rate assigned
Setting cost centres
From the Simpro tab:
A - If all require the same cost centre or labour rate
Select the default cost centre / default labour rate
B - When multiple cost centres are required
Select multiple parts across different stages then click set cost centre to click here for information on renaming cost centres
Renaming cost centres
Parts and labour can be pushed to multiple cost centers with the option to re-name the cost centre from Groundplan.
Ensure the cost centre has been set
Click the parts requiring a renamed cost centre or select all
Click set cost centre name
Type the cost centre name
Click save
Push to a new quote
Once cost centers and labor rates are assigned to all components requiring inclusion in the Simpro quote, push to a new quote.
Click push to new quote
Enter the first 3 letters of the customer name, then click to select alternatively, click + new customer
Click to select the site, alternatively, click + new site
Select the quote type
(Optional) Select a due date
Some Simpro accounts require a due date for quotes
(Optional) Select the project manager
(Optional) Select the salesperson
(Optional) Click to attach plans as an attachment
Click submit, if not attaching plans, click the blue quote number to enter the quote
Select the plan/s to be exported
Choose from
(Default) Include all stages
or switch to
Only include selected stages
Choose the PDF file generation option
(Default) Create one PDF per plan (better for digital use)
or switch to
Create one PDF per group (better for printing)
(Optional) Update folder name
Click generate export
Click the quote number to view the quote in Simpro
Click close on returning to Groundplan
Service and project quote elements
Two quote types can be created from Groundplan, with the specifics for each outlined below:
| Project Quote | Service Quote |
Stages | Groundplan stages become Sections in a Simpro Project Quote. | Parts and labour are grouped by Groundplan stages within their assigned cost centres. |
Cost centres | Multiple cost centres can be set within a stage. | Measurements are grouped by cost centre |
Rename cost centres | Within stages, cost centres can be renamed from Groundplan. | Items within the same measurement can be assigned to different, renamed cost centres inside the stage before pushing a quote to Simpro. |
Within Groundplan | ||
Within Simpro |
Ensuring Simpro company is set on a project
From the project tab from inside a project, the Simpro company should be set.
Frequently asked questions
Pricing and items
If I update my pricing in Simpro, will this update my quote pricing?
If I update my pricing in Simpro, will this update my quote pricing?
Yes.
You will see the new pricing when you push to a new or existing quote.
I have used the same Simpro product under multiple Groundplan measurements in the same stage. Why can I only see it once in my Simpro quote?
I have used the same Simpro product under multiple Groundplan measurements in the same stage. Why can I only see it once in my Simpro quote?
They have grouped together.
The same Simpro catalogue or pre-build product appearing under multiple measurements in the same stage will grouped together on the Simpro tab and the totals combined when pushing to a quote.
Why is the wrong catalogue / pre-build showing in my Simpro quote, it looks correct in Groundplan?
Why is the wrong catalogue / pre-build showing in my Simpro quote, it looks correct in Groundplan?
The wrong pre-build is linked to the measurement.
In Groundplan, catalogue items and pre-builds are linked by a background ID, so even when the description and part number are the same, the ID may be different.
This can be checked by:
Click the worksheet
Click options then click show totals
Clicking the integration symbol will open the catalogue / pre-build in Simpro to double-check it is the incorrect pre-build
The incorrect pre-build now needs to be removed, and the correct pre-build added.
From Groundplan, click the measurement name
Click part actions, then click delete
Click +part, select, search and add the correct catalogue / pre-build
Push to a new quote
If the item was added to the project as a template, either copy the stage to a new template and archive the old or, update the catelogue / pre-build in the take-off template.
Can I send length breakdowns to my quote if I used a multiplier?
Can I send length breakdowns to my quote if I used a multiplier?
Yes.
From the worksheet tab, a multiplier is visible.
On Groundplan's Simpro tab, the quantities breakdown will only show the lengths without the multiplier applied.
When pushed into the Simpro quote, the breakdown totals will show with the multiplier applied.
Cost centres
Can I rename cost centres in Groundplan and push to the same cost centre in a section?
Can I rename cost centres in Groundplan and push to the same cost centre in a section?
Yes.
Parts and labour can be pushed to multiple cost centers with the option to re-name the cost centre from Groundplan.
Ensure the cost centre has been set
Click the parts requiring a renamed cost centre
Click set cost centre name
Type the cost centre name
Click save
In the top stage, you can see the cost centre is commercial, but some items have been renamed to lighting install.
Why is my cost centre not in the drop-down selection?
Why is my cost centre not in the drop-down selection?
There are two things to check here.
Firstly, is the Simpro company selected for the Groundplan project?
Click the project tab
Click settings,
Click and select a Simpro company if there is not one set
Click save
Secondly, is the correct Simpro multi-company selected on the Groundplan project? Adjust if required.
Viewing quote in Simpro
Why can't I see the description I added to the project overview tab in my Simpro quote?
Why can't I see the description I added to the project overview tab in my Simpro quote?
The description added in the project overview tab is for Groundplan only.
Due to API limitations, we cannot push these details into your Simpro quote.
Can I share projects outside of my organisation?
Can I share projects outside of my organisation?
Yes, however, when sharing projects with another organisation also using Simpro, only pre-builds and catalogue items from your connected Simpro account can be pushed correctly to your Simpro quote.
β οΈ Warning: Simpro items are linked to Groundplan using background ID's. any catalogue items or pre-builds linked from a different Simpro URL will create an error in Groundplan and will not push through to Simpro.
Is Groundplan able to help if I need a variation to my quote or a linked variation?
Is Groundplan able to help if I need a variation to my quote or a linked variation?
Yes.
There are two options available:
Push to new quote - Create a new quote in Simpro. This option is often used for standard variation quotes as they can be merged into an open Simpro Job.
Push to an existing quote - Update an existing quote in Simpro. This option is often used when getting plan revisions or when wanting a linked variation quote in Simpro.
Chatting with one of our Trainers about your particular workflow for advice with your Groundplan project is best.
Please reach out by sending us a message at Help > Send us a Message.
β
π»Accessed free training?
Arrange your free training by clicking Help > Send us a Message. Our trainers are ready to help with:
Streamlining workflows
Time-saving strategies
Maximising your subscription
Alternatively, visit the Groundplan Academy here for self-directed courses.