Pushing to an existing quote is used when quantities have been updated, when revisions have been received or when a linked variation quote for an active Simpro job.
⚠️Warning: Understanding what happens when pushing to an existing quote
Pushing to an existing quote will override the cost centre layout within a section.
When pushing to a section where multiple matching cost centres are present, Groundplan consolidates the items into a single cost centre under the section.
If / when modifications have been made in Simpro to a section created from Groundplan, all changes will be overridden, which include and are not limited to:
Editing pre-builds "on the quote," e.g. changes to materials or prices
Added additional materials & labour
Adjusted cost center totals and subtotals
Adjusted material markup, cost price, sell price and quantities
Adjusted labour markup, cost price, sell price and quantities
Renaming of cost centers from Simpro
Adding cost centre descriptions
Adding cost center tasks
Contractor work orders
Schedules
Locked cost centers
Additional cost centers added under Groundplan created sections
Additional non-Groundplan added sections
There are occasions when it might be more effective to push to a new quote to maintain a revision history.
Push to existing quote
Ensure the quote is closed in Simpro
An open quote will create an error in Groundplan
Click the Simpro tab
(If required) Update or add cost centres / labour rates or rename cost centres
Click push to existing quote
If already pushed from Groundplan, the quote number auto-populates (if required) type the quote number to update
Important project quote information:
If additional sections have been added within Simpro to the quote ensure:
Untick "remove existing sections from the quote"
e.g. in the image below, if it remains ticked, the administration and switchboards sections from the quote will be "removed from the Simpro quote"
This action is permanent
(Optional) Attach plans as attachments
Click submit
If not attaching plans, click the blue quote number to enter the quote
Select the plan/s to be exported
Choose from
(Default) Include all stages
or switch to
Only include selected stages: choose stages only for the plans selected (all annotations will be included)
Choose the PDF file generation option
(Default) Create one PDF per plan (better for digital use)
or switch to
Create one PDF per group (better for printing)
Check the Simpro section
Click generate export
Click the quote number to view the quote in Simpro
Click close on returning to Groundplan
Frequently asked questions
Pricing and items
If I update my pricing in Simpro, will this update my quote pricing?
If I update my pricing in Simpro, will this update my quote pricing?
Yes.
You will see the new pricing when you push to an existing quote.
I have edited a pre-build on a quote. Can I keep these modifications when pushing new totals from Groundplan?
I have edited a pre-build on a quote. Can I keep these modifications when pushing new totals from Groundplan?
Yes.
When a pre-build is edited on a quote, it becomes an archived pre-build in your Simpro. You must locate the archived pre-build within Simpro and re-activate the pre-build.
We suggest editing the part number for easy identification.
Once re-activated, you will need to link this pre-build to the Groundplan measurement.
To do that:
Click the worksheet
Locate the measurement the pre-build appears in, then click on the measurement name
Click part actions then click delete
Click +part, select, search and add the correct pre-build / catelogue Item
(Optional) Re-name measurement then click save
Click the Simpro tab and push to an existing quote
I have adjusted the markup within my Simpro quote. Can I keep this markup when I push to an existing quote?
I have adjusted the markup within my Simpro quote. Can I keep this markup when I push to an existing quote?
If your quote has an adjusted material markup in Simpro, complete the following before pushing new quantities/updates from Groundplan:
Open the Simpro quote
Click settings then click quote setup
Click optional
Untick use default and enter the new materials markup
Click next
Click save and finish
Any updates from Groundplan will reflect this markup on the same catalogue items and pre-builds.
I want to add additional parts and labour to the quote that isn't shown on a plan. Can I do that?
I want to add additional parts and labour to the quote that isn't shown on a plan. Can I do that?
If revisions are part of your workflow, add them within Groundplan so they don't need to be added within Simpro after every revision. Examples include but are not limited to sundries, travel or equipment hire, and extra contractor hire.
On the worksheet tab, additional items and labour can be added to individual stages. These are items not usually populated on the plan and not accounted for in pre-builds or measurements but are required in the quote section in Simpro.
Adding labour as an additional item follows the same rules as when adding it to a measurement.
To do that:
Why is the wrong catalogue / pre-build showing in my Simpro quote, it looks correct in Groundplan?
Why is the wrong catalogue / pre-build showing in my Simpro quote, it looks correct in Groundplan?
The wrong pre-build is linked to the measurement. In Groundplan, catalogue items and pre-builds are linked by a background ID. The ID may be different even when the description and part number are the same.
This can be checked by:
Click the worksheet
Click options then click show totals
Clicking the integration symbol will open the catalogue / pre-build in Simpro to double-check it is the incorrect pre-build
The incorrect Pre-Build now needs to be removed, and the correct Pre-Build added.
From Groundplan, click the measurement name
Click part actions, then click delete
Click +part, select, search and add the correct catalogue / pre-build
Push to an existing quote
If the item was added to the project as a template, either copy stage to a new template and archive the old or, update the catalogue / pre-build in the take-off template
Viewing quote in Simpro
I have added additional sections to my quote within Simpro. Is there a way to make sure they don't disappear?
I have added additional sections to my quote within Simpro. Is there a way to make sure they don't disappear?
Firstly, the section names added to your Simpro quote must be named differently to the stage names in Groundplan.
To confirm the added section/s remain in your quote, complete the below:
Click push to existing quote
Uncheck "Remove existing sections from Qquote"
Sections added within Simpro will remain in the quoteClick submit
What happens to my cost centre descriptions when I push to an existing quote?
What happens to my cost centre descriptions when I push to an existing quote?
Cost centre descriptions must be re-added after pushing to an existing quote.
If you add cost centre descriptions to quotes, there are a few time-saving options available:
Option 1:
Build descriptions and inclusions into Simpro forms using Form Builder or the Quote Detail form. We recommend speaking with Simpro to discuss your form requirements/options.
Option 2:
Attach a quote form to Simpro quote to easily re-populate cost centre descriptions after pushing to an existing quote.
Option 3:
Send to Simpro as section descriptions, from the worksheet:
Click stage actions, then click edit
Enter the cost centre description into the stage description
Click save
Return to the Simpro tab and push to an existing quote
We recommend speaking with Simpro to discuss if this would fit your form requirements.
Option 4:
If you are only adding a new section/s when pushing to an existing quote.
Push to a new quote
In Simpro, copy the new cost centres / sections into the existing quote
Can inclusions and exclusions be added in Groundplan and sent to my Simpro quote?
Can inclusions and exclusions be added in Groundplan and sent to my Simpro quote?
Inclusions and exclusions would be commonly added in Simpro via the cost centre scripts or forms. From Groundplan, these could be sent as Simpro section descriptions.
To send section descriptions to Simpro, from the worksheet:
Click stage actions then click edit
Enter the inclusions and exclusions into the stage description
Click save
Return to the Simpro tab and push to an existing quote
We recommend speaking with Simpro to discuss if this would fit your form requirements.
Is Groundplan able to help if I need a variation to my quote or a linked variation?
Is Groundplan able to help if I need a variation to my quote or a linked variation?
Yes. There are two options available:
Push to new quote - Create a new quote in Simpro. This option is often used for standard variation quotes as they can be merged into an open Simpro Job.
Push to an existing quote - Update an existing quote in Simpro. This option is often used when getting Plan revisions or when wanting a linked variation quote in Simpro.
Chatting with one of our Trainers about your particular workflow for advice with your Groundplan project is best. Please reach out by sending us a message at Help > Send us a Message.
Why can't I see the description I added to the project overview tab in my Simpro quote?
Why can't I see the description I added to the project overview tab in my Simpro quote?
The description added in the project overview tab is for Groundplan only.
Due to API limitations, we cannot push these details into your Simpro quote.
Can I share projects outside of my organisation?
Can I share projects outside of my organisation?
Yes, however, when sharing projects with another organisation also using Simpro, only pre-builds and catalogue items from your connected Simpro account can be pushed correctly to your Simpro quote.
⚠️ Warning: Simpro items are linked to Groundplan using background ID's. any catalogue items or pre-builds linked from a different Simpro URL will create an error in Groundplan and will not push through to Simpro.
💻Accessed free Training?
Arrange your free training by clicking Help > Send us a Message. Our trainers are ready to help with:
Streamlining workflows
Time-saving strategies
Maximising your subscription
Alternatively, visit the Groundplan Academy here for self-directed courses.














