Once Integrated, begin using Xero Items to Count and Measure Lengths or Areas on Plans.
Related articles: Take-off templates when integrated with Xero | Push to a quote in Xero
Measurement Choices
Groundplan Part: Use this option if the item doesn't exist in Xero (becomes an Individual Line Item)
Xero Item: Choose individual items from Xero Products and Services
The Stage name appears at the end of the Product name within the Quote
Select a Measurement Part Type
Complete the remaining fields
Click Create, if additional Parts and Labour are required, click Create & Add More Parts
| Groundplan Part | Xero Item |
Xero Item Search | N/A | Type 3 letters to begin |
Search Results | N/A | Click to select the result |
Description | Required | N/A |
Part No | Optional | N/A |
Part UoM | Required | N/A |
Unit Cost | Optional | N/A |
Markup % | Optional | N/A |
Unit Price | Optional | N/A |
Style | Optional | Optional |
Symbol | Optional | Optional |
More information on Measurement Types can be found in the following articles:
Adding Parts and Labour to a Measurement
When a Count, Length or Area is created on a Plan, additional Parts and Labour can be quantified at the same time. Parts can be added when the Measurement is made or after.
Understanding Groundplan's Supported References will assist in quantifying the required Parts and/or Labour for the Measurements.
Supporting References
Support References relate directly to elements on the Plan and can be used in conjunction with Excel-type Formula to calculate Parts and Labour for Groundplan Parts and Xero Items. Each Formula must contain a Supported Reference/s to be accepted.
Formula follows the PMDAS Rule: Parentheses (brackets) first followed by multiplication, division, addition, then subtraction. Calculations are prioritised within the brackets.
The below image displays how the main Supported References correspond to a Plan:
More detailed information about Formulas with examples are provided in our article Using Formulas in Groundplan here.
Adding Parts while Creating a Measurement
Create Measurement and click Create & Add More Parts
Click +Part, select Measurement Part Type and complete Formula if required
(If required) Type to rename Measurement
Renaming the Measurement remains in Groundplan only
(if renamed) Click Save
📝Note: The Measurement is counting a downlight on the Plan but quantifying a surface socket and 8 metres of cable
Adding Labour on Creation
Labour added within Groundplan will be sent to Xero as an Individual Line Item. Identical Groundplan Labour will Group or Link together within the same Stage when pushed to Xero. Further information about converting Minutes to Decimals for Labour can be found here.
Create Measurement and click Create & Add More Parts
Click +Labour
Complete Description (Optional fields - Unit of Time, Unit Cost, Markup %, Unit Price, Formula and Labour conversions.)
If the Description turns blue with a link sign, the Labour is Grouping with others in the same Stage
Click Save
This example shows 1mtr of 25mm Conduit is installed every 10 minutes (len*0.17)
Additional Items and Labour
On the Worksheet tab, Additional Items and Labour can be added to individual Stages. These are usually items not populated on the Plan but needed within the Quote. Examples include but are not limited to sundries, travel or equipment hire, and extra contractor hire.
Additional Items: Choose from a Groundplan Part or Xero Items.
Frequently Asked Questions
Can I create Xero Items within Groundplan?
Can I create Xero Items within Groundplan?
No, unfortunately not.
You can push Groundplan Parts to Xero but any Xero items must be created in Xero.
If I add multiple Parts and Labour to a Measurement, will this go through to Xero as a a single line item?
If I add multiple Parts and Labour to a Measurement, will this go through to Xero as a a single line item?
No, unfortunately not.
Having multiple Xero Items or Groundplan Parts will not create a Product in Xero. They will go across as separate line items.
Any Products must be built in Xero. You can push Groundplan Parts to Xero but any Xero items must be created in Xero.
I have used the same Xero Item under multiple Groundplan Measurements. Why can I only see it once in my Xero Quote?
I have used the same Xero Item under multiple Groundplan Measurements. Why can I only see it once in my Xero Quote?
They have Grouped together.
The same Xero Item appearing under multiple Measurements in the same Stage will Group together on the Xero tab and when pushing to a Xero Quote.
This is also the same for Labour.
For example, a surface socket for multiple Measurements in the same Stage will Group together:
If I update my pricing in Xero, will this automatically update?
If I update my pricing in Xero, will this automatically update?
If you have used a Take-off Template for your Project then no, it will not automatically update.
Pricing is saved at the time of Take-Off Template creation. If your pricing has changed in Xero, update the Parts in your Template by relinking them.
If Xero Items are linked to multiple Measurements, they will need to be removed from all Measurements and then relinked again.
I have changed the name of my Measurement in Groundplan, why has it not appeared on my Quote?
I have changed the name of my Measurement in Groundplan, why has it not appeared on my Quote?
Renaming measurements on Groundplan will not send the updated name to Xero.
These names will only appear in Groundplan on the Stage, Worksheet, Quantities, Take-off Templates and on the Legend.
If I add multiple Xero Items to a Measurement, can I send this to Xero with just one sell price?
If I add multiple Xero Items to a Measurement, can I send this to Xero with just one sell price?
Yes.
There are multiple solutions for this, here is just one example for a downlight:
Create an item for the price per point - eg downlight $90 in Xero
Click Create items for parts and enter a cost price and $0 sell price (for example surface socket and cable)
Add these items to the Downlight as Parts
On the Xero tab, unselect the Account on $0 item lines, ensure there is an Account set for the downlight.
Push to a New Xero Quote
Once the quote is accepted, on the Groundplan / Xero Tab, add the Account for the $0 items
Push to a New /or to an Existing Quote to populate the purchase order for items required
Please reach out to our Support Team via Help > Send us a Message if you require an alternate solution to the one listed.
💻Accessed free Training?
Arrange your free training by clicking Help > Send us a Message. Our trainers are ready to help with:
Streamlining workflows
Time-saving strategies
Maximising your subscription
Alternatively, visit the Groundplan Academy here for self-directed courses.











