Skip to main content

Solar Energy Plan: Change Orders

Written by Andrew C - PLR Platform Ops

Change Order Parameters & Thresholds

This section details various scenarios that may require a change order, and the business rules associated with those scenarios. Please note the differences between a PPA and a Lease on Production and System size change orders.

Lease & PPA – Production and Size Changes

  • Size: In addition to our current guidelines and tolerances below all PV systems with a system size (kW) change of Β±25% or more from the contracted size at installation will require a new customer contract with updated size, production, and monthly payment. EPC payments are subject to change and will be adjusted accordingly.

Change Type

Definition

Business Rule

Notes

Production

Change in modeled/sold production.

Click to view

PPA:

If production (kWh) is within above (-5 to +10%) NO customer change order required


​
Lease:

If production (kWh) is within above (-5 to +10%) NO change order required

and/or

If system size (kW) is within (-5 to +10%) no customer change order required.

Click to view

LR Portal update still required even if a customer change order is not. Changes must be reflected in Install Milestone submission. Note that PPA and Lease are treated differently.

System Size

Change in system size

Click to view

PPA:

If production (kWh) is within above (-5 to +10%) NO customer change order required

Lease:

If production (kWh) is within above (-5 to +10%) NO customer change order required

and/or

If system size (kW) is within (-5 to +10%) NO customer change order required

Click to view

LR Portal update still required even if a customer change order is not. Changes must be reflected in Install Milestone submission. Note that PPA and Lease are treated differently.

Customer Name / Add or Remove Customer

Any change to the applicant(s) or names

New Contract Signature Required

Click to view

Any changes to person(s) on the credit application will require a new contract. In some cases, this may simply require a brand new account altogether.

Address

Property address

New Contract Signature Required

Utility

M1/M2 must match the sold utility.

New Contract Signature Required

Click to view

Rates may vary from one utility to another.

Pricing,

Payment,

or Rate

Payment, escalator, or kWh rate

New Contract Signature Required

Equipment Brand

Change in manufacturer, model, etc

No Signature Required

Click to view

No signature as long as on AVL & wattage change doesn't exceed -5/+10 thresholds

Down Payments,

Offset,

or Rebate

Not applicable

Not applicable

Steps to Complete a Change Order

Follow the below steps to complete a change order within the LR portal, and execute new contracts. The high level steps are below. Note that:

  • LightReach support can provide guidance on change orders. However...

  • LightReach support cannot manipulate pricing changes or execute price-related change orders on the Installer behalf. Sensitive information such as quote selection is the responsibility of the Installer.

First, void the initial contract (if applicable). Then, proceed to void the current quote.

Process the changes and proceed

Name and Property Change Process

Click Here

Production, System Size and Equipment Brand Change Process

Click Here

When changing the production you can check here to see if you will need a new contract

Utility Change Process

Click Here

This process is necessary because rates may vary from one utility to another, and the install and activation package documents must match the contracted utility.

Then, proceed to create a new quote, select & save. The new contract can now be sent.

Important things to note

  • Once a contract is sent, pricing, adders and PPW to the EPC are locked in.

  • Changes to system size, and any resulting pricing changes, will not go into effect unless a change order (new contract) is executed.

Did this answer your question?