Absolutely, you can seamlessly sign up for fibre broadband while maintaining your existing DSL or cable broadband service without encountering any technical issues. ππ»
Fibre broadband operates through the Netlink Trust (NLT) Termination Point (TP) installed in your home, connecting to the separate fibre optic Next Gen NBN infrastructure, independent of DSL or cable lines.
If you're considering running multiple fibre broadband services simultaneously, rest assured, it's no problem. The NLT TP features 2 ports, allowing for the operation of 2 fibre broadband services concurrently.
Please be aware that activating the second port of the TP may take approximately 4 to 8 weeks across all households in Singapore. βπ‘ Feel free to enjoy the benefits of high-speed fibre broadband alongside your existing service! π