The Bill of materials structure is defined in your ERP system, and is imported into the App daily through the standard data interface.
In the standard bom.csv file, the finished good item and related raw material items are provided. The quantity required of each raw material required to manufacture one standard unit of measure of the finished good item is expressed by the ratio.
The location (or warehouse) of the finished good and the raw materials are also defined in this file.
The structure of the bom.csv file required can be seen below:
Columns
You might also be interested in searching the following: