Overview
Pricing is where your team builds the cost and price volume for a pursuit, inside the same workspace that holds the opportunity, the solicitation documents, and your rate data.
You attach the solicitation's pricing documents, NextStage reads them to extract the pricing requirements, and AI builds a first-pass labor and other direct cost build-up. From there your pricer refines the build-up, models scenarios against a baseline, confirms every requirement is covered, and exports the workbook.
You can use Pricing to:
Extract pricing requirements directly from the RFP, pricing schedule, and PWS
Build a labor build-up by labor category, site, and performance year
Price travel and other direct costs (ODCs)
Apply the fee and rate sheet that come with your contract vehicle
Set Overhead and G&A per work site
Price teaming partners and their workshare alongside your own labor
Model scenarios with levers such as escalation, discount, and material handling
Confirm every solicitation requirement is priced before you submit
Export a pricing workbook, including into a government-mandated workbook format
See it in action: watch the Pricing overview. It is the same short animation you see on the Pricing page in NextStage.
Before You Start
A few things make the first volume go smoothly:
Pricing must be enabled for your workspace. If you do not see Pricing in the left navigation, contact your NextStage representative.
You need edit access to the opportunity you want to price. Without it, the opportunity appears in the list but cannot be selected.
Your Pricing Library should have its defaults set. A default rate sheet, cost sheet, and site are what a new volume starts from. See The Pricing Library below.
Have your pricing documents ready: the RFP or solicitation, the pricing schedule or pricing attachment, the PWS or SOW, and any applicable wage determinations.
Where to Find Pricing
Pricing lives in the left navigation bar, with two pages under it:
Volumes: every pricing volume in your workspace, searchable and filterable.
Library: your rate sheets, cost sheets, ODC catalogs, export templates, and library defaults.
Step 1: Create a Pricing Volume
A pricing volume is tied to one opportunity in your pipeline.
Go to Pricing > Volumes.
Select New Volume.
Choose the pipeline the opportunity lives in.
Search for the opportunity by name, organization, or code, and select it. You can also filter by stage or owner.
Select Create volume.
The volume opens directly into guided setup.
Once a volume is open, the top bar carries everything that stays true across screens: Back to volumes, the volume name (click it to rename), a link to the opportunity, the live Cost, Revenue, Profit, and Target figures, undo and redo, and an indicator showing whether AI is currently working on the volume.
Step 2: Complete Guided Setup
Guided setup collects everything NextStage needs before it prices anything. Work down the cards, selecting Continue as you finish each one. Optional and recommended steps offer Do this later, so you are never blocked.
The first time you open a volume, a short setup tour walks you through the cards. You can restart it any time from the sparkle icon in the top bar.
1. Review pricing documents (required)
Attach the documents AI will read to extract requirements: the RFP, the pricing schedule, the PWS, and any wage determinations. Set the correct type for each document. If the opportunity already has documents attached, NextStage may surface them here so you can add them in one step.
2. Confirm the contract vehicle (recommended)
Pick the contract vehicle this volume bids through. Its fee and rate sheet apply automatically. With no vehicle selected, your library's default rate sheet is used. Add more rate or cost sheets if this volume draws from several.
3. Team and subcontractors (optional)
Add teaming partners and their workshare so AI prices the whole team, not just your company.
4. Sites (optional)
Assign a cost sheet and set Overhead and G&A for each work site on the contract.
5. Performance years (recommended)
Set the base year and option years used to build the pricing baseline.
When your documents are attached and processed, select Start. AI builds the requirements grid, the labor categories, and ODC suggestions in one pass, recommending sites and rates along the way.
If documents are still processing, you can select Start when documents are ready and NextStage will begin on its own as soon as they finish.
When the pass completes, the setup screen offers Build the pricing baseline.
Step 3: Review the Pricing Baseline
The Pricing baseline is your fully-built price volume across the base year and every option year. It is the anchor every simulation compares against.
The screen is organized into cards you can jump between from the tab bar at the top:
Totals: the rolled-up price by year.
Scenario rates: the rates this scenario is priced at.
Pricing summary: cost, fee, and price for the volume.
Labor requirements: what the solicitation asked for in labor, and whether each requirement is answered. Selecting a requirement opens its full specification, including the clause it came from.
Labor build-up: the grid that prices those requirements, by labor category, site, and year.
ODC requirements: what the solicitation asked for in travel and other direct costs.
Other direct costs: the grid that prices them.
Each pair reads in the same order: what was asked for, then what prices it. Edit cells directly in the grids; undo and redo are in the top bar.
Worth checking on your first volume:
Every labor requirement has staffing against it
Rates are coming from the rate sheet you expect
Overhead, G&A, and fee are right for each site
Escalation looks correct across the option years
Travel and other direct costs are complete
Step 4: Model Simulations
Select Model simulations from the baseline screen to build scenarios off your baseline and dial each one in. Every simulation keeps its own levers, and the comparison recalculates live as you edit.
The Levers & KPIs card shows each lever with its baseline value, the simulation's value, and an adjustment control:
Annual escalation
Discount
M&S handling
ODC material handling
You can also edit the labor and ODC build-ups inside a simulation, the same way you do on the baseline.
From the simulations screen you can:
Duplicate a simulation to branch from it
Adopt as baseline: makes the selected simulation the baseline for the volume. Its rates become the anchor every other simulation compares against, and the previous baseline becomes a regular simulation.
Requirement Coverage: a requirement-by-requirement read across every scenario, so you can confirm nothing is left unpriced before you adopt or export.
Step 5: Export the Workbook
Select Export Workbook from the simulations screen. The export screen shows the workbook as it will be delivered, so you get a full read before the file leaves the building, and then lets you download it.
If the solicitation mandates its own pricing workbook, add that file as an export template in the Pricing Library. NextStage maps your pricing into the government's own sheet rather than producing a separate format. When a volume has a mandated workbook, the setup and export screens point you to the template it is using.
Working with the Nexus Agent
AI works alongside the volume rather than only at setup. The Nexus Agent tab, available from the sidebar on every pricing screen, has three views:
Current run & actions: what AI is working on right now, and anything it needs from you.
Suggestions & to-dos: recommendations and open items for the volume. Each one links straight to the row or setting it is about.
Run history: previous runs and what they produced.
The work indicator in the top bar shows agent status from every screen, so you always know whether a run is in progress.
The Pricing Library
The Pricing Library (Pricing > Library) holds the reusable data your volumes are built from:
Rate sheets: labor categories and rates, including published vehicle rates
Cost sheets: indirect rates such as Overhead and G&A
Other direct costs: reusable ODC catalogs
Export templates: mandated or corporate pricing workbooks
Narratives and pricing models: supporting content and configuration
Set your library defaults once (default rate sheet, default cost sheet, default site, and default other direct costs) and every new volume starts from them. This is the single biggest thing you can do to make new volumes fast to set up.
Tips for a Good First Volume
Attach the pricing schedule or pricing attachment, not just the RFP. It is the document that carries the structure your workbook has to match.
Tag each document with the right type so AI reads it for the right thing.
Confirm the contract vehicle before you start the build. The vehicle's fee and rate sheet change every number downstream.
Set performance years before the build so the baseline is built across the right base and option years.
Keep the baseline as your defensible build and use simulations for the what-ifs. Adopt a simulation only when it becomes the price you intend to bid.
Run Requirement Coverage before you export.
Important Note
Pricing is designed to do the build-up and the arithmetic, not to make the bid decision. Always have your pricer and contracts team review rates, indirects, fee, escalation, and the exported workbook against the solicitation's instructions before submission.