Skip to main content

CNH FieldOps: import paddocks and engine hours

Connect CNH FieldOps to import paddocks and boundaries, and on Phase Ultra confirm each harvest job in Reconcile and keep engine hours current.

P
Written by Phase Team

Connect your CNH FieldOps account (the account Case IH, New Holland and STEYR machines use) to bring your paddocks and their boundaries into Phase. On Phase Ultra, Phase also brings in each finished harvest job overnight, with its yield, moisture, diesel and maps, for you to check and confirm in Reconcile, and reads your machines' engine hours so service reminders count from the real meter. Only harvests come in from CNH so far: spraying, seeding, spreading, tillage, swathing and baling don't.

Before you start

  • Plan. Importing paddocks from CNH works on Phase Pro and Phase Ultra, and during a free trial. Harvest jobs and engine hours from CNH need Phase Ultra (a free trial includes them). On Pro, enter machine hours by hand, and the CNH FieldOps page in Reconcile shows Unlock CNH FieldOps Work Sync.

  • No subscription. Without a current Phase subscription, the page says "CNH needs Phase Pro or Ultra" and Connect CNH is turned off.

  • Permission. Importing paddocks and adding machines from CNH needs permission to edit the farm. Owners, co-owners, admins and staff have it unless it has been switched off. Only an owner, co-owner or admin can disconnect CNH.

  • Machines. A machine reports hours only while it has an active telematics subscription with CNH.

  • John Deere too? John Deere and CNH can both stay connected. Neither overwrites the other.

Connect CNH FieldOps

  1. Open More → Integrations → CNH FieldOps. The path is the same on a computer and a phone.

  2. Select Connect CNH. The CNH sign-in opens.

  3. Sign in with the CNH account that owns your machines and allow Phase access.

  4. On the iPhone or Android app, the sign-in opens in a browser window over Phase. When you have signed in, the phone asks to open Phase: tap Open. You come back to the CNH FieldOps page with "CNH FieldOps connected."

The header then shows Checking, Connected, Reconnect needed or Not connected and your CNH company name. Once connected, the main button becomes Load fleet (or Refresh fleet) on Phase Ultra, or Import fields on Pro. Actions holds Refresh and Disconnect CNH.

Under What Phase reads, Fields and boundaries, Machine hours and Harvests and their maps are Available (the last two say Ultra on Pro). Other job maps (seeding, spreading and tillage) says Coming. Phase calls CNH when you start an import or a sync, and on Phase Ultra overnight for finished harvests and machine hours. Harvest jobs come into Reconcile to check (see below).

Import your paddocks from CNH

  1. Open More → Paddocks & crops → Farms & Fields.

  2. Select Actions → Import from CNH. If CNH isn't connected yet, this goes straight to the CNH sign-in. When you come back, choose Import from CNH again: the import doesn't start by itself.

  3. Wait while Phase reads your CNH farms and traces the boundaries. A big account shows progress, such as "Tracing boundaries: 40 of 120 fields…".

  4. Tick the fields to import. They are grouped by their FieldOps farm name. The search box above the list finds one. Select boundary fields ticks every field on a farm that has a boundary, and Clear unticks them.

  5. For each ticked field, check:

    • The match, for example "Matched existing North 1 · Same CNH field ID", or "Will create new Phase field".

    • Field name to use.

    • Link CNH boundary → Phase field, to pick a different paddock or + Create new Phase field from this CNH boundary.

    • For a new paddock, Create field in farm: one of your farms, or + Create new farm from CNH farm.

    • Update existing, Import as new or Skip, and the boundary picture.

  6. Select Import/update N fields, for example Import/update 12 fields. If the button says Resolve N setup items, finish the choices it points to first.

The import window says CNH all the way through. Holes in a boundary, such as a dam, stay holes rather than becoming separate paddocks.

How Phase finds the matching paddock

Import from CNH and Import from John Deere look first for a paddock that came from the same field before ("Same CNH field ID"), then one with the same name on the farm you are importing into (Same field name), then one whose boundary and area sit in the same place (Same boundary and area). A paddock already linked to a different field is never taken. Nothing changes until you import.

Update existing replaces the paddock's boundary and area with the CNH one. If the CNH name differs from yours, the row says Rename suggested. To keep your own name, type it in Field name to use first, or pick your paddock under Link CNH boundary → Phase field.

Check and confirm CNH harvest jobs (Phase Ultra)

Each night Phase reads every new finished harvest job from FieldOps, from the job's own file off the header's screen: the grain weighed on the paddock, the ground cut, the moisture and the diesel. Each job then waits in Reconcile, like a John Deere harvest.

  1. Open More → Daily work → Work reconcile, then CNH FieldOps.

  2. Open the harvest job. Its Harvest panel shows Yield, Moisture, Grain, Crop and Variety.

  3. If the crop or variety is wrong, select Change crop or variety, pick the right ones and select Save.

  4. Select Confirm job, then Save confirmed job.

Confirming writes the paddock's yield in the Yield Centre, with CNH FieldOps as its source, and completes the plan's harvest pass if there is one. A finished paddock also gets the job's yield map on that yield record, read from the job's own file. It shows in the Yield Centre (View yield map) a few minutes later, and never changes the yield you confirmed. A paddock that already has a yield map for the season keeps it, and one confirmed while still being harvested gets no map (its maps stay in Spatial). The Harvest panel says which applies before you confirm.

Refresh checks CNH FieldOps for new harvest jobs straight away. The Checked … note beside the heading says when CNH was last checked and how many jobs are still being read: each appears once Phase has read it, a minute or two apiece. The ••• menu has Re-match queue. There is no Change JD org (CNH reads the one company on the CNH FieldOps connection page) and no Clear pending work.

While a job waits. The Yield Centre already shows its yield, marked not reconciled, with a Reconcile button that opens this page. When FieldOps lists the job again with more harvested, Phase updates it rather than adding a second. A job whose cab screen was left on the wrong paddock is filed on the paddock the header was really in. Its yield, diesel, ground speed and coverage maps go to Phase Spatial the morning after, confirmed or not, marked CNH FieldOps.

Each hectare and each hour counted once. A job's yield is its grain over the ground the header cut, each patch once: where two headers, or one header twice, went over the same ground, the overlap isn't counted as more hectares. CNH sends the work a header is still on again the next night, from the same start and longer, and some jobs come with two files for the same hours; Phase reads each second of a header's work once, so a job that starts with hours already counted begins at the first new reading. When a harvest is checked part-way through the day, the rest of that day's work comes in as its own job. Waiting jobs that held repeated hours are read again and come down to what the header did; a job you already confirmed keeps its figures until you edit it.

What stays out of Reconcile. Jobs under 2 ha (a test strip, a corner, a screen left recording) don't wait in Reconcile; their maps are still in Spatial. A job CNH lists as a harvest but that weighed no grain, such as a tractor beside the headers with its screen left on harvest, shows in Spatial named for the machine, such as "Tractor, no grain", with its speed and diesel maps and a Path map of where it drove. For now only CNH header harvests come into Reconcile, not seeding, spreading, tillage or spraying.

CNH harvests confirmed before 3 November 2026 have no map in the Yield Centre; their maps are in Spatial. For reading and confirming a harvest in more detail, see John Deere harvest jobs, diesel and job maps.

Keep engine hours current (Phase Ultra)

  1. Open More → Integrations → CNH FieldOps.

  2. Select Load fleet. Phase lists every machine CNH reports, with its make, model, VIN and hours. Machines and Reporting hours show the counts.

  3. Select Add to Machines under the list. Machinery opens on Machines with Import machines from CNH.

  4. Tick the machines Phase should track. Machines that report hours and aren't in Phase yet are already ticked. A machine already in Phase whose Serial is the CNH VIN or serial number shows Links to and its name. Tick it to link it rather than add it twice.

  5. Leave Add a starter service reminder to each machine ticked for a 250 hr service counted from the current meter. You can change or remove it per machine later.

  6. Select Import N selected, for example Import 4 selected.

Phase never matches machines by name. For a machine you added by hand, type its VIN in Serial first, then link it.

Once a farm has a CNH machine or paddocks from CNH, Import CNH also sits beside Import Deere on Machinery → Machines and in Inventory → Machinery (under the ••• button on a phone).

When hours update

  • Overnight by themselves, shortly before Phase works out the day's service reminders.

  • When Machinery opens, at most every four hours.

  • On the spot with Sync CNH, beside Sync Deere on the Machines & servicing panel of the Overview tab in Machinery. It shows once a machine is linked to CNH.

The meter only moves forward: if CNH reports fewer hours than Phase has, Phase keeps its reading and the sync says so. A sync never adds a machine.

Stop CNH updating one machine

  1. Open More → Daily work → Machinery → Machines.

  2. Open the machine.

  3. Open its Details tab. A machine read from CNH shows Meter source as "CNH sync", and CNH FieldOps as "Linked by VIN" with the VIN.

  4. Select Remove CNH link, then confirm.

Its hours and service reminders stay, and from then on you type its hours by hand. Link it again with Import CNH. Only people who can edit the farm see Remove CNH link.

Disconnect CNH FieldOps

  1. Open More → Integrations → CNH FieldOps.

  2. Select Actions → Disconnect CNH, then Disconnect.

Phase forgets the CNH sign-in for this farm. Paddocks you already imported stay exactly as they are. Only an owner, co-owner or admin can disconnect.

Good to know

  • Phase calls CNH only when you start an import, a sync or Refresh, plus the overnight harvest check and hours refresh on Phase Ultra.

  • The CNH FieldOps row on Data Feeds shows whether CNH is connected, when it last synced, whether the sign-in needs renewing, and how many harvest jobs are waiting, such as "2 jobs to review". Tap it to open the harvest jobs.

If something doesn't look right

  • A harvest isn't in Reconcile. Select Refresh on the CNH FieldOps page in Reconcile, and check the season selector. Only harvests come in from CNH so far.

  • The CNH sign-in didn't open. The import window says why, for example when the farm's plan doesn't include CNH.

  • "Fields without boundaries". CNH sent these fields with no active boundary, so Phase can't import them as boundaries. Save one in FieldOps, or draw it in Phase.

  • "CNH could not load this boundary this time." Run Import from CNH again.

  • "CNH signed you in, but Phase could not find a FieldOps company for that login yet." On the CNH FieldOps page select Actions → Refresh, and check you signed in with the account that owns your machines.

  • Reconnect needed, or "Your CNH connection has expired". Select Reconnect CNH on the CNH FieldOps page. Until then hours stop moving, and Sync CNH says so with a Manage CNH button.

  • "No machines reported". CNH returned no connected equipment. A machine needs an active telematics subscription before it reports.

Related

Did this answer your question?