Wiring Diagram 1
Use Case: when all computers are close to the finish line use 1 Netgear switch as seen in the diagram.
Links to purchase items:
Wiring Diagram 1
Use Case: when all computers are close to the finish line use 1 Netgear switch as seen in the diagram
Wiring Diagram 1
Use Case: when all computers are close to the finish line use 1 Netgear switch as seen in the diagram
1. Hang the RaceReady Box on the finish line arch
2. Run an ethernet cable from the RR router over to a Netgear unmanaged switch
3. Run Ethernet cables from the switch to all desired computers
Wiring Diagram 2
Use Case: when registration is far away from the finish line use 2 Netgear Switches.
Hang the RaceReady Box on the finish line arch
Run an ethernet cable from the RR router over to a Netgear unmanaged switch
Run an ethernet cable from switch 1 to your Live Timing Computer
Run Ethernet cables from switch 1 to port 1 of switch 2
Run ethernet cables to all desired computers