Skip to main content

Creating a Data View Scheme

Create a scheme to define whether spreadsheet data is based on nets, parts, or reference designators.

Written by Adam

During creation, you also define the view type as standard (for single design configurations) or variant (for design variations or alternatives). You cannot change these attributes after you create a data view scheme.

A data view scheme is a saved configuration that defines how design data displays in spreadsheet format (based on nets, parts, or reference designators).

Prerequisites

  • You have opened a PCB design or 2D schematic design from the Connect application.

  • Changes you make affect all users with to the design. You have obtained confirmation from your team before making changes to a shared scheme (accessible to multiple users).

Procedure

  1. Click Switch View and select one of the following Data View options from the dropdown list:

    - Data View at the Bottom
    - Data View on the Left
    - Data View Only
    ​

  2. On the data viewer interface, from the View dropdown list, choose Create New Scheme.

  3. In the Create New Scheme dialog box:
    a. Type a unique name into the Name field.
    ​Tip: Use a descriptive name that identifies the scheme's purpose.
    b. In the View Type dropdown list, choose standard or variant data.
    c. In the List Type dropdown list, choose whether the spreadsheet should display columns related to part numbers, reference designators (Ref Des), or netlists.
    ​ Note: Netlists are only available as part of a Standard view type.
    ​

  4. Click Create.
    The named scheme you created displays in the Select View Scheme dropdown list.

    You can now configure the column names (representing design attributes) that display in the data viewer for the new scheme.
    ​

  5. On the data viewer toolbar, click Edit Columns.

  6. In the Edit Columns dialog box, select and then move columns between the Available columns list and the Selected columns list.
    ​

  7. (Optional) To change the display order of the selected columns, click an item name in the list, and then use the arrow buttons to move it.
    ​

  8. Ensure the data view scheme name displays in the View dropdown list, then click Save Scheme.

  9. In the Save Scheme dialog box:
    a. Ensure the correct scheme name displays in the Name field.

    b. (Optional) Click Add Tag, type a unique tag name that describes the selected scheme, and save the tag. For more information, see Tag Names in Schemes.

    c. Click Save.

Results

The unique scheme name, tags, and settings you applied to the data viewer columns save to the new data view scheme. The scheme name displays in the View dropdown list.

Did this answer your question?