Skip to main content
Documenting VCA price premium investments (QCC)
Updated over 2 weeks ago

For several VCA project categories, you must count only the price premium for the preferred input (see Table 5 in the Certification Standard). For these costs, you must provide at least ONE form of documentation demonstrating EACH of the following Required details. This table shows the preferred form of documentation for each required attribute. If the preferred form of documentation is unavailable, an alternative form may be used.

At a minimum, you will likely provide 3-4 pieces of documentation for each VCA investment with a price premium.

Type

Requirement

Required Information

Preferred Format (PDF)

Alternative Format

Alternative 2

(Q) - Quantity and Proof of Purchase

Required

Date, description of input, and amount purchased

Invoice or PO showing quantity and amount paid

See example

Summary report of multiple POs (PDF or spreadsheet)

See example

n/a

(C) - Cost Premium

Required

Demonstrates the cost difference between the conventional input and the preferred (lower-carbon) input

Attestation letter from supplier (Tier 1) explaining higher cost compared to conventional input

See example

PO with costing document from supplier (PDF)

See example

n/a

(C) - Lower Carbon

Required

Demonstrates the emissions difference between the conventional input and the preferred (lower-carbon) input

Custom LCA showing carbon intensity or savings compared to conventional input

See example

Reference to credible 3rd party LCA or research study

See example

GHGP compliant emissions factor from an approved library (see EPA example)

(C) - Content

Optional

Confirms the characteristics of the input purchased. May provide helpful information for an accurate Lower Carbon calculation.

3rd party material certificate

See example

GHG inventory (PDF or link to the BEE)

See example

n/a

Did this answer your question?