Incorporate Togal.CHAT prompts into your takeoff workflow for meeting prep, RFI summaries, follow-ups, and more with one click.
Before Using Togal.CHAT Prompts
Togal Chat Does Not:
Perform takeoff automatically
Access the internet
Know anything outside the documents you have uploaded
Replace professional judgment, field experience, or a full bid review process
Togal Chat Does:
Analyze drawings and specs you upload into a project
Answer questions based on what is shown or written in those documents
Help you move faster through large or complex document sets
Generate structured RFIs, scope summaries, and risk flags based on project content
Compare two drawing sets and identify changes
Note: The quality of your output depends entirely on the uploaded drawings and specifications. Always upload clean and well-labeled documents to produce stronger results.
Feel free to copy & paste the examples below into your project today.
General prompts
Input specific trade or material type in every "Blank" section for your project.
Create a detailed summary of this project as it pertains to a[BLANK]contractor
Create a detailed summary for [BLANK] finishes
Create a detailed RFP for [BLANK] on this project
Create an RFI for [BLANK] finishes on this project
Prompts by trade
Trade-specific prompts that actually fit your work
GC
Based on the uploaded project drawings and specifications, write a comprehensive Scope of Work for the Division 10 specialties contractor.
Organize by:
Submittals and product data
Shop drawings (if required)
Delivery and storage
Installation by item type
Mounting and anchorage
Coordination with blocking and framing
ADA compliance
Protection and cleaning
Closeout requirements for each category
ONLY INCLUDE SCOPE SHOWN IN THE DOCUMENTS
Provide sheet numbers and specification section references.
Drywall
Provide value engineering suggestions for the Division 02 demolition scope
Summarize the baseline demolition approach and proposed alternative
Reference relevant sheets or specifications
Painting
Provide a total estimated wall count of:
Painting and coatings Wall coverings
Surface preparation
Protection and touch-up for this set
Provide sheet numbers and specification section references
Demolition
Extract all specification requirements for Division 02 demolition.
Include:
Demolition procedures
Environmental controls
Dust and noise control standards
Vibration monitoring requirements
Salvage handling
Temporary protection standards
Hazardous material coordination requirements
Disposal and recycling requirements
Provide specification section numbers and page references.
Cabinetry
Review the uploaded project drawings and specifications and generate a detailed summary of the Division 06 wood and millwork scope.
Organize by:
Plastic Laminate Casework
Wood Veneer Casework
Custom Millwork Elements
Wall Paneling
Trim and Finish Carpentry
Wood Blocking and Backing
Countertops (if included in Division 06)
Shelving and Closet Systems
For each system, include:
Casework type and construction standard
Materials and core type
Finish type and veneer species
Hardware requirements
Dimensions and heights
Support and anchorage requirements
Coordination with MEP and adjacent finishes
ADA or code-related requirements
Consolidate identical casework types across sheets
Only include systems explicitly shown in the project documents
Provide sheet numbers and specification section references.
Plumbing
Identify slab penetrations, underground rough-in requirements, and wall sleeves affecting Division 22 plumbing scope.
Provide sheet references.