Skip to main content

How to use timelines

A guide on how to add and edit timelines in your templates and Pods

Written by Bel Gernale

The timeline block is a simple way to lay out a sequence of key moments in a Pod — perfect for onboarding plans, roadmaps, rollout steps, or a clear “what happens next”.

Adding a timeline

In a text widget, type /timeline to drop a timeline into your Pod.

You can also open the Blocks toolbar on the left of the editor and click Layout. Under Sequence, pick Vertical timeline, Vertical alt timeline, Horizontal timeline or Horizontal alt timeline. Click to insert it where your cursor is, or drag it to where you want it.

To start a new widget with a timeline, hover the gap between two widgets and click View all widgets to open the Widget library. Choose Vertical timeline under Basic layouts, then click Add to Pod.

Each point on the timeline is a milestone, and every milestone has three parts:

  • A date

  • A title

  • A description

Editing a milestone

Click a milestone’s marker (its dot, number or icon) to open its Milestone settings, where you can:

  • Change that milestone’s colour

  • Choose an icon (when you’re using icon markers)

  • Move it earlier or later in the sequence

  • Remove it with Remove milestone

Timeline settings

Hover the timeline and click the ⋮ handle in its left margin to open the timeline toolbar, where you can:

  • Use Orientation to switch between vertical and horizontal layouts

  • Use Layout to choose a single-sided or alternating layout

  • Use Markers to pick the marker style: dot, number, or icon

  • Click Add milestone to add a new milestone at the end

  • Duplicate or delete the timeline

In a vertical timeline, you can also click Add milestone below the last milestone.

Horizontal timelines

In horizontal mode, the timeline scrolls sideways using the arrow buttons, and you can add new milestones with the + button.

Tips

  • Keep milestone descriptions short so the timeline stays easy to scan.

  • Pair a timeline with a Mutual Action Plan when you want to show the big-picture sequence alongside detailed, assignable steps.

Did this answer your question?