Manage Slaughter Plans in BRAINR by viewing details, editing plan data, and closing or canceling plans with full traceability.• Consult and analyze the plan (header, overview, loads, quality, rejections, and related production orders). • Edit header fields (shift, schedule, responsible person) and manage loads (import or manual) plus partners/logistics. • Close or cancel the plan so it’s stored in Production History.
Important Notes
Ensure the Slaughter Plan has an external batch so that associated raw materials and quality controls are correctly linked during execution.
Remember that closed and canceled plans are available in the Production History, not in the active Slaughter Plans list.
Consult plan details
On the Homepage, open the Slaughter Plans app in the Slaughter Plans section.
Review the list of plans in the Open, In Planning, In Progress/On Pause, Completed, and Finished states; use Production History to view closed and canceled plans.
Use the columns to understand the plan at a glance:
Items: Number of loads in the plan.
Remarks: Number of comments; click the value to read them.
Progress: Execution status of the plan, based on the execution of its loads.
Status View: Graphical representation of the current status.
To manage a specific plan, click the three‑dot menu on its row and select Details.
Inside the plan, you can access:
Header: Slaughter Plan number, Progress, Production line, Delivery date, Slaughtered/forecast quantity, Remarks, and a State View.
Overview:
Summary of movements for expected and consumed raw materials, based on quantities already produced.
Average weight balance showing the difference between expected average weight and the actual weight consumed, highlighting deviations.
Rejections showing the quantity of rejected and dead product and their percentage versus consumed quantity.
Productivity with units produced per hour per operator.
Quality Control with counts of pending and validated quality checks.
Stops shows the number of interruptions and downtime at work centers.
Operators with number of operators, expected time, and actual time spent, helping to evaluate efficiency.
Product types with quantity and weight consumed by product type and deviation from expected values.
Product categories with quantity and weight consumed by product category and deviation from expected values.
Other tabs:
Detail: General information such as document type, section, production line, shift, start and end times, person responsible, and other key fields.
Items: Analysis of loads, including partner information and, in the Load tab, logistics such as vehicle, driver, and picking team.
Raw Material Consumption: It lists all raw material consumption documents, showing for each load of live birds how many units were consumed for subsequent production.
Rejections: Detailed list of rejections, including quantities, reasons, causes, operator, and registration date.
Quality: Detailed list of validated and unvalidated quality controls and their recorded values.
Production Orders: List of production orders associated with each load.
Edit plans and loads
You can start editing either from the list or from the plan details.
In the list, click the three‑dot menu next to the plan and choose Edit; or, inside the plan, click Edit in the top‑right corner.
In edit mode, you can update header fields such as production line, shift, date, start and end times, and responsible person.
To manage loads:
Automatic Import: Import outstanding purchase orders as loads for the plan.
Manual Creation: Add loads manually by entering product, partner, quantity, average weight, and logistics (vehicle, driver, and picking team).
Edit/Remove Loads: Open a load to adjust its data or delete it if no longer needed.
To add a partner to a load:
Expand the load and click + Partner.
In the modal, fill in Partner, address, quantity, average weight, purchase document, and logistics details.
Click Add or Add and Close to confirm or Cancel to discard the changes.
When all changes are complete, click Save in the plan footer to confirm, or Cancel to exit without saving.
Change status, close, or cancel
Status changes are available from the list (three‑dot menu) or inside the plan through the Change Status button. The options depend on the current status:
From Open: Change to Planning.
From Planning: Change to In Progress or back to Open.
From In Progress: Change to Completed, Paused, or Planning.
From Paused: Change to Finished or In Progress.
From Completed: Change to Finished or In Progress.
From Finished: The status remains Finished.
To close a plan:
In the list, open the three‑dot menu for the plan and select Close.
In the confirmation modal, click Confirm to move the plan to Closed in the Slaughter Plan History, or Cancel to abort.
To cancel a plan:
In the list, open the three‑dot menu for the plan and select Cancel.
In the confirmation modal, click Confirm to move the plan to Canceled in the Slaughter Plan History, or Cancel to abort.
Canceling the Slaughter Plan transfers it to the Slaughter Plan History in the Production History section with the status Canceled, ensuring full traceability of the operation.
Remarks and reordering
To add remarks: in the list, open the three‑dot menu for the desired plan and choose Add Remarks, enter your comment in the modal, and click Save or Cancel.
To reorder loads: in the list, open the three‑dot menu for the desired plan and select Reorder Slaughter.
This will open the page for reordering the loads in the slaughter plan. See link below. 003.089||Managing Loads in the Slaughter Plan





























