There are two types of production schedules which can be set within the Production Sites settings.
Schedule: Using the schedule you can pre-fill the production times for P1 and P2 each day. This applies to every bench as default but can be adjusted when you plan your benches if needed.
Forecast: Using the forecast you can set the sales times you would like your P1 and P2 forecast to be calculated from.