IGS Is an integrated financier that offers a TPO product similar to other TPO providers.
You MUST use Aurora or Scanifly as your design tool in order to use IGS as a TPO provider.
Configuring A Sales Org IGS Hierarchy
If you have a hierarchy built out in IGS to ensure deals completed in Enerflo are attributed to the correct sales org, you will need to add the partner code of the sales org into the IGS plugin settings.
To do this, click Settings > Org > Plugins > IGS Solar Plugin
Under "Authorized Dealer" Settings, select the dealer and enter in their Sales Partner Code
If you don't have the sales partner code, it can be found by logging into IGS and clicking the hamburger menu and then Sales Channel and searching the sales organization name. Once the sales org is selected, the sales partner code shows at the end of the URL.
For example, in this url, it is SALESPARTNERCODE.
solar360.igssolarpower.com/app/#/v2?salesPartner{{SALESPARTNERCODE}}
Sales Rep Verification
To ensure deals created in Enerflo are associated with the correct sales rep in IGS, the sales rep needs to enter in their IGS Portal Login email into their integration settings. This can be entered in by visiting their user settings, clicking the integrations tab, and locating the "IGS Energy Settings" box.
However, this is not required to complete IGS Deals.
IGS Deal Flow
Create Proposal, view and edit if necessary, selecting the desired financing product, escalator, and financing rate.
Submit the financing application on the financing stage.
Credit Check
Lease Contract Signing
When the credit check is complete, an email is sent to the homeowner from IGS with the lease contract. The homeowner will complete the lease agreement contract on their own device. Once the contract is signed, the stage will show as complete. The sales rep can click the "Resend" button if the contract needs to be re-sent.
Contract Verification
IGS Account Verificaiton
Once the contract is verified, an email is sent to the homeowner to create their account in IGS. Once Completed, the status in Enerflo will again change, showing all stages are approved.
Common Troubleshooting
"Error calculating savings: No rate found for the chosen product" showing when creating a proposal. This indicates that domestic content is not enabled in IGS in the state where the deal is being ran.
External Equipment Mapping Errors indicate one of the following:
Equipment has not been added to the IGS global list. Reach out to IGS for resolution.
Equipment is in IGS global list, but has not been enabled in the IGS Portal.
Equipment has been enabled in IGS portal, but not mapped correctly in Enerflo.





