Skip to main content

Training and Troubleshooting

This collection includes articles on troubleshooting errors and how to perform basic functions.

Utility or rate is not available for selection

GoodLeap TPO solar access or TSRF error
Error: [Adder Name] missing a GoodLeap mapping. Please have an admin add one.
Financing Error: No products are available
Discount "Not in use" or Not Showing
LightReach Finance Options "There was an error fetching the available options"
Inactive Pricing Model/No Pricing Models Found Error
Adder Not Showing in Proposal
Using Gross Cost Override With a TPO or PPA
HIS Number Error When Trying to View Proposal
No SREC Data Found Error
Save a proposal as a PDF
How to change the language on a proposal
Sunnova Proposal Populating "Error while getting quote: 001E000001EcqwhIAB is not configured to sell a 25 year Lease in TX with a . Contact your account manager."
Proposal does not have post solar tariff information
Reset buttons on the Finance page
Dealer Fee Calculation
Calculating Dealer Fees on Adders
Error: No Pricing Models Found. At least one pricing model is required for a proposal to be created
Monthly Consumption Graph in Proposal
"No Pricing Options Available" When adding an adder to a proposal
Aurora pricing not matching Enerflo pricing
Wrong Utility Bill Page Showing in Proposal
Solar Power Rates Within Proposal
How To Switch Finance Method on a Proposal
Rate of Increase in Proposal
Resetting Gross System Cost Override
Finalizing a proposal
How Down Payments are Calculated
Why are there discrepancies in the pricing between multiple proposals?
Commission
How does Enerflo handle annual vs. monthly consumption input methods and their effects on usage analysis?