When you create or edit a rate, the changes do not automatically apply to trips that have already been created. To update existing trips with your new rates, you must resave the trips so they are reevaluated using your current rate table.
Follow the steps below to update existing trips in RoutingBox Web.
How to apply rate changes to existing trips
Open Trip Viewer. Go to Scheduling → Trip Viewer.
Select a date range. Set the date range to include all the trips you want to update.
Filter your trips. Use the available filters to narrow down the list to only the trips you want to update (i.e. a particular account or account class) and click Filter.
Open Edit Trips. Click Edit Trips in the upper-left corner of the Trip Viewer screen.
Select Resave Trips. In the Field dropdown at the top of the screen, select Resave Trips.
Check Un-Override Rates. In the upper-right corner, toggle the Un-Override Rates option. This removes any manually overridden rates on the selected trips, allowing the current rates in your rate table to be applied.
Note: when toggling un-override rates, verify on the trips with overridden rates that you want to switch them to the new rates before running the re-save.
Select the trips you want this re-save to impact. Choose the select all button if it should be all.
Click Save Trips to run the update to resave the selected trips. The trips will be reevaluated, and the applicable rates from your current rate table will be applied.







