The wizard has 11 steps, but only the first two are mandatory. From step 3 onwards, you can click Finish at any time: the construction site is created, and you can complete the rest later. The number of construction sites is unlimited.
Launch the wizard
Construction sites menu > green + at the top right. The Construction site creation wizard opens, with the 11 numbered steps at the top.
Step 1: Basic information (mandatory)
Construction site name (mandatory): a clear name that is easily identifiable by your team.
Address: enter the full address to automatically locate the construction site.
Construction site colour: this will help you find it in the planning.
Status: if your company has defined construction site statuses.
Planned dates (optional): planned start and end dates.
Construction site hours: start and end of day, start and end of break. These pre-fill timesheets. If left empty, the company's default hours apply. Check No break if the day is continuous. Reset to company defaults cancels your changes.
End client (mandatory). Does not exist yet? Choose + Create a new client at the top of the list.
Location: city, postal code, country.
⚠️ The message "End client is mandatory" blocks progression to the next step as long as no client has been selected.
Step 2: Work Supervisor(s) (required)
Check at least one work supervisor. The Search bar helps you find them. The person doesn't exist yet? + Create a user.
Step 3: Summary of optional steps
Klear shows you steps 4 to 10, all optional. Click on one of them to complete it, or on Finish to create the site right away.
💡 On each optional step: Skip skips the step, Back to summary takes you back to this list.
Step 4: Site Manager(s)
Check one or more site managers.
Step 5: Other members
Check the technicians and workers who will participate in the construction site.
💡 Key point: all members selected in steps 2, 4 and 5 are part of the construction site's life. They can be scheduled there and exchange messages in its chat. Others do not have access to it.
Step 6: Equipment
Check the equipment assigned to the construction site, or + Create equipment.
Step 7: Partners
Expand each subcontractor and check the employees to assign to the construction site. Two shortcuts: + Create a subcontractor and + Add an employee.
Step 8: Lots
Check the planned lots: one by one, or an entire category with Select all (Preparation, Structural work, Utilities / Infrastructure, Secondary work, Finishes…).
Step 9: Batch Planning
For each checked batch, enter the start date, the end date and the planned hours. This is optional: you can continue without dates.
Step 10: Document Template
Choose the folder structure for the project site: Empty Structure to start from scratch, or a template such as Site Documents (recommended). You can modify it afterwards.
Step 11: Summary
Review the summary and click Finish. The project site is created.
What's next? Create the planning and tasks, upload the project site documents and launch team communication.