Skip to main content

Grain contracts, loading out and weighing off

Record what you have sold on Yield Centre's Contracts tab, split a load between two contracts, load grain out on an estimate, and weigh it off when the docket comes back.

P
Written by Phase Team

Record the grain you have sold, and see how much has been delivered against each contract and how much is still owed. When a truck leaves a silo on the loaders' estimate, Phase keeps that figure until the weighbridge docket comes back, then corrects the silo by the difference.

Can a truck go out on an estimate and be updated with the docket later? Yes. On Load out, on the How much step, choose Estimate under Tonnes on this load. When the truck weighs off, tap Weigh-off on the load, type the Delivered tonnes (net) and attach the docket. If the docket is already back when you log the load, type the Delivered tonnes (net) on the Truck and docket step (on Check and save for a truck run's Log the load), and the load is saved weighed off.

Where do grain contracts go? On the Yield Centre's Contracts tab (More → Paddocks & crops → Yield Centre → Contracts). It is one list: each contract of the harvest as a card with its progress bar and its loads. Inventory → Grain & Hay no longer has a Contracts view; an old link to it opens the Yield Centre's. The contract's PDF or photo is also filed in Documents.

What fills a contract? Deliveries logged in Phase, CBH LoadNet loads you put on it, and grain transferred out to another grower at CBH. Part of a load can go on one contract and the rest on another. CBH doesn't say which contract a load is for, so you put CBH loads on a contract yourself (see Contracts and transfers in Yield Centre).

Before you start

  • Adding, reading, editing and closing contracts needs farm editing access, the same people who can record the sale in Finances. Owners, co-owners and admins always have it, and staff have it unless it has been taken away.

  • Everyone who can open the Yield Centre can see contracts. Loading out, weighing off and counting a delivery towards a contract need permission to edit Inventory.

  • On trial, Phase reads 40 contracts from photos or PDFs. Typing them in, or a subscription, has no limit.

Add a contract

  1. Open Yield Centre → Contracts and select New contract (or Read a contract to fill it from the paperwork). Actions → New contract works from any tab, and New contract… on a load's contract question opens the same form.

  2. Fill in the four parts of the form: Who it is with (Buyer, Contract no.), What is sold (the commodity, Grade, Variety if the contract names one, Season), How much, and the price (Tonnes, Tolerance, Price in $/t, blank for a pool, and Price basis), and Where and when (Deliver to, Window from, Window to, Notes).

  3. Select Add contract.

Read a contract fills the same form from a photo or the buyer's PDF: the buyer, contract number, commodity, variety, grade, season, tonnes, tolerance, price, price basis, delivery site and window, with payment terms in Notes. Check every field (anything Phase was unsure of is listed at the top), then select Add contract. When the grades are priced differently, a "Price by grade" line goes into Notes and the single price is left blank. If the quantity isn't in tonnes, Phase says so and you type it.

Track delivered against sold

Contracts starts with a line for the harvest, such as "3 contracts · 600 t sold · 420 t delivered · 180 t to go", then a card for each contract with its progress bar (see Contracts and transfers in Yield Centre). Open contract shows:

  • The percentage delivered, what is still to deliver, and a window badge such as "12 days left", "Window ends today" or "3 days past window".

  • Truck runs planned or booked against it, such as "3 truck runs planned · 90 t", and Plan a run (see Plan truck runs).

  • Deliveries: each load counted towards it, including transfers at CBH ("Transferred to …"). A split load shows its part, such as "20 t of 38 t". Take off takes the load, or only this contract's part of it, off the contract; the load itself stays. When CBH LoadNet loads count toward it too, a line says how many and their tonnes; take those off from the contract's card on Contracts (Show its loads).

  • Delivered so far on a priced contract, such as "420 t × $352 = $147,840", before freight, levies and grade adjustments.

  • Document: tap it to see the PDF or photo inside Phase, with Open in new tab and Download.

Loads recorded in kg count in tonnes. Priced contracts also price the Actual and Forecast gross margin in Financial Performance (see Gross margin: what it covers and how grain is priced).

Count a delivery towards a contract

  • When you log a delivered Load in or a Load out, choose it under Contract it counts toward on the Where it went step. Each contract shows what is still to deliver on it, and Looks like …: count it towards that offers the likely one.

  • For a delivery logged without one, open the contract and tap Count it beside it under Deliveries with no contract. On a contract the load would overfill, the button says how much fits, such as Count 20 t.

  • On the Loads awaiting weigh-off card, a load going to a buyer or site an open contract names shows "Looks like …: count it towards that". Nothing is attached until someone taps it.

Split a load between two contracts

A contract for a fixed tonnage, say 200 t with no tolerance, can be filled exactly: put part of the last truck on it, and the rest on another contract or on none.

On a new load, tap Split it across contracts on Where it went, then each contract, the one to fill first first. On How much, Phase fills the first to what is still owed and puts the rest on the next; type over any figure (see Log a harvest load).

On a saved load, or in the full form:

  1. Choose the contract under Contract (or Counts toward a contract on a load opened from Loads).

  2. If the load would take that contract over, Phase says so, for example "This load takes #4412 to 218 t of its 200 t. Put 20 t on it and the other 18 t on #4418?" Select Split the load to do it in one tap.

  3. To split any load by hand, select Split between contracts. Type each contract's tonnes on its own line, use Add a contract for another, and read what is left on no contract.

  4. On a load you are recording or editing, the split saves with the load. On a load opened from Loads, select Save split. Don't split puts the whole load back on one contract.

A split load shows under each of its contracts with its part, and on Loads as Split: #4412, #4418. Each contract's gauge, what is left on it, the Overview's On contract and Grain & hay prices count only that contract's part. CBH LoadNet loads split the same way. Nothing is split for you: a contract already over by more than it allows says open a load to split it beside its figures.

Finish, cancel or delete a contract

  • Mark complete closes an open contract, and Reopen brings it back. Edit → Status can also set Cancelled.

  • Delete, then Delete contract, removes the contract. Its deliveries stay in Storage → Activity and stop counting towards it. A split load keeps its other contracts.

Uncommitted grain, folded at the foot of Contracts, shows each commodity in storage less what is still owed on open contracts. A negative figure reads as "short": more has been sold than is on the farm. Check grades, linked deliveries and tolerances before treating it as grain you can sell.

Load a truck out of a silo

A new Load out opens as one card at the foot of the screen, one question at a time, the same as Load in.

  1. Select Record load → Out of storage in the Yield Centre, Load out in Inventory → Grain & Hay, or Load out inside a structure or on its Phase tag.

  2. Got a docket? Tap Take a photo or Photo or PDF to read the docket, or Skip.

  3. What is going out: tap the silo, shed or stack under Out of (a search box when there are many), then Which parcel if it holds more than one.

  4. Where it went: choose Delivered and tap or type the Buyer or site, then the contract under Contract it counts toward (or Split it across contracts). For feed or seed, choose Used on farm and tap Fed to stock or Sown as seed under Used for.

  5. How much: under Tonnes on this load, choose Estimate or Weighed. Phase starts with the whole parcel, and the save button reads Empty it: change the Tonnes to what is on the truck (All of it puts the whole parcel back). Hay has Bales too. Add the truck's Gross and Tare under On the weighbridge (optional) if you have them, and set the Day.

  6. Truck and docket (all optional): tap the Truck and Driver, type the Docket no., and attach the docket under Dockets and receipts. On an estimate, Delivered tonnes (net) takes the weighbridge figure if you have it already. More details holds the grade and moisture as received, the docket's quality figures for the crop and a note. A load used on farm asks for a Reference and notes instead.

  7. Check: read the ticket, then select Save load (or Empty it).

The load comes out of the silo on the estimate straight away; a net weight typed on Truck and docket weighs it off at once and corrects the silo by the difference. A load read from a docket photo starts as Weighed. Silage comes out of its bunker the same way, with Fed to stock.

Weigh it off when the docket comes back

A load on an estimate shows "est. 32 t" and Awaiting weigh-off. Loads awaiting weigh-off, at the top of Yield Centre → Storage and Inventory → Grain & Hay, shows the three that have waited longest (See all opens the rest), with the day loaded, route, truck, contract and docket number. Loads → Needs a look lists each as Not weighed, with Record weight.

  1. Tap Weigh-off on the load. Record delivered weight shows what the load is, its contract, route, loading day, truck and estimate.

  2. Type the Delivered tonnes (net) off the docket and the Weigh-off date, or use Read it off the weighbridge docket to fill them from a photo.

  3. Add the Docket no., Grade delivered, Moisture, Protein, Screenings and Test weight if you have them.

  4. Under Dockets & receipts, tap Photo to photograph the docket, or Attach file for a PDF or receipt.

  5. Read the line above the buttons. It says what will happen, such as 1.6 t less than the estimate going back into Silo 2.

  6. Select Save delivered weight.

The load then reads "30.4 t delivered (est. 32 t)". Contracts, the paddock's harvest and Yield Centre use the delivered weight from then on.

What happens to the silo. The weighbridge figure is taken as right:

  • If the truck carried less than the estimate, the difference goes back into the silo.

  • If it carried more, the extra comes out of the silo.

  • If the extra is more than the silo has left on the books, the silo is emptied and Phase says how far the book stock was out.

  • If the load already emptied the silo, nothing is put back, and Phase says so. If grain really is still in there, load it back in.

  • A load delivered straight off the paddock changes no storage.

If the site refused the load, tap Turned away on the card, or Load turned away at the foot of Record delivered weight (see Log a harvest load).

Add a docket or fix the delivered tonnes later

Every delivery, including one weighed when it went out, has Delivery details (the receipt button) in Storage → Activity, on the structure, and on a load opened on Loads (Record delivered weight while it waits to weigh off). Use it to attach dockets and receipts, or to correct the delivered tonnes. Dockets are filed in Documents against the silo and the paddock, with a note such as "Delivery docket · Wheat · Ref 123456".

If something doesn't look right

  • I can't find Contracts in Grain & Hay. Contracts are on the Yield Centre's Contracts tab since 29 October 2026. They are the same contracts, with the same figures.

  • I can't add a contract, or saving one fails. If Contracts says "Adding contracts needs farm editing access", ask an owner or admin to change your access (see Change someone's role and what they can see). On trial, if Phase has read 40 contracts already, type the next one in.

  • The last truck takes a fixed contract over. Split the load (see above).

  • There's no Contract list on the load. The farm has no contracts yet. Add one in Yield Centre → Contracts.

Related

Did this answer your question?