Plan a job for later from the notice board, give it to one or more people, link it to a paddock, machine or mob, and set it to repeat. Use it for anything from fixing a fence to servicing the header. For a quick job, posting it on the board in one line is enough: see The notice board and Machinery.
The quick answers. Yes, you can attach photos and PDFs before you save a new job. Yes, a job can have a tractor and its implements on it. The machine list has a search box. To remove a job, open it on the notice board and select Delete job at the bottom of its sheet; there is no "Cancelled" status to pick.
Before you start
Planning, finishing and deleting jobs needs permission to record work or to edit the farm.
Giving a job to several people or to Everyone, making it repeat, adding parts to a service or repair, and Reopen need permission to edit the farm. Owners, co-owners and admins always have it; staff have it unless their access was narrowed.
Create a part or fluid on a job also needs permission to edit Inventory.
You can only give a job to people who have joined the farm. Someone you invited appears once they accept.
Plan a job for later
Open the Notice board: More → Daily work → Notice board, or Post on the Overview's Notice board widget.
Type what needs doing in the post box, choose Job, then select More details. On a phone you can also tap the green + → New job, type it, then More details. The New work form opens with Plan for later chosen and what you typed already in it, including the person, paddock or machine you tagged and the day. (For a job on a machine you can also use New work → Plan a machinery job in More → Daily work → Machinery.)
Choose a Category, such as Fencing, Water or Machinery service, and a Priority (Low, Normal, High or Urgent).
Type what needs doing in Task, for example "Fix the boundary fence on Creek Flat".
Set the Due date, and a Start date if it helps.
Under Assigned to, choose Unassigned, People (then tap each person) or Everyone. Everyone includes people who join later.
Add instructions or safety details in Notes.
Select Plan work.
The job goes on the notice board, under For me for each person it was given to and Everyone for the rest of the farm. A machinery job also shows on Tasks in Machinery.
Link the job to a paddock, machine or mob
Open Link to a farm record on the form to link a Farm, Paddock / field, Machine / asset, Livestock mob, Inventory product, Note or Crop activity. Any list longer than eight has a search box.
More than one machine. Choose the main machine under Machine / asset, then Add implement or machine for each one working with it, such as the bar and air cart behind the tractor. The job list then shows "Tractor + Bar + Air cart".
Finding the machine. Machine / asset opens a list with a search box, ready to type. Type part of the name and tap the machine, or press Enter for the first match. To take it off, choose None (or No machine) at the bottom.
A machine that isn't in Phase yet. People who can edit the farm see New machine… at the foot of the list. Type the Name, Type, Make, Model and, for road vehicles, Rego, then select Add machine. It is saved to Machines and picked. Add its meter, photos and service reminders on the machine afterwards.
Plan a machinery service or repair
When the Category is Machinery service or Machinery repair, the form adds Maintenance details (or Repair details):
Choose the machine under Machine / asset. A service or repair must have one.
Add the Technician, Estimated time (minutes) and Estimated cost if you know them.
Type the checklist under Checklist, one item per line.
Under Parts and fluids, select Add part and type each quantity (4.1 L of oil can be typed 4.1 or 4,1). Parts that fit the machine are at the top; Create a part or fluid adds a new one.
The parts come off stock when the job is marked done, so check them first. For a service that comes round every 250 hours or once a year, use a service reminder instead. See Set service reminders.
Add photos or an invoice before you save
On New work, find Photos and invoices under Notes and select Attach.
Choose images or PDFs, up to 10 MB each and 20 at a time. Each has an × to take it off.
Save the job. The files are attached as it saves.
If a file doesn't go up (no signal, say), the job still saves and a message names the file; open the job and use Attach. The same form opens when you make a job from a mob, a Note on the map, or the soil and yield screens.
Start a job or a check from Overview
The Notice board widget on Phase's Overview (the home screen) lists what needs doing soonest, the latest note and what is still to get. An overdue job says so in red. Tap anything to open it on the board.
Post opens the board ready to post a job, a note or something to get.
On a phone, the green + on the card posts a job, list item or note right there, in a box that sits above the keyboard, or opens Speak or the camera for a Photo note.
Tap the circle beside a job to mark it done.
Pre-start check starts a pre-start check once the farm has a machine. With one checklist it opens straight away; with several you land on Checks → Templates in Machinery to choose Begin on one.
Open board opens the whole board.
If you switched the old Jobs & Maintenance widget back on, its Job opens the board ready to post a job, Check starts a pre-start check, and Open opens the board.
Save checklist progress on a half-done job
Open the job.
Tick the items you've done under Task checklist.
Select Save progress, beside Mark complete.
The job stays in To do. Each ticked item shows who ticked it and when ("Done · Jack Wilson · 2 Oct, 3:40 pm"). The job's card on the notice board (and on Tasks, for a machinery job), the Overview widget, the machine's Work tab and its Phase tag say how far through it is, such as "3 of 7 done", and the job's activity gets a line such as "Checklist: 3 of 7 done".
Unsaved ticks show "Not saved yet. Tap Save progress.", and closing the job asks Save your checklist progress? first. Mark complete still needs every item ticked. Staff who can record work but not edit the farm can save progress too.
Make a job repeat
While planning the job, open Location & recurrence. For a Machinery service or Machinery repair this box is Location & service schedule and has no Recurrence: use a service reminder instead (see Set service reminders).
Under Recurrence, choose Daily, Weekly, Fortnightly, Monthly or Custom interval (then type the days in Every N days).
Save the job.
Its card then says, for example, Repeats every week or Repeats every 10 days. Phase makes the next one when this one is marked done, not all in advance. If it was finished late, the next due date moves on by whole intervals until it is after the day it was done. The next one goes to the same people (or stays Everyone), and each gets the usual "assigned to you" notice.
Skip one. Open the job and choose More → Skip this one. The next one is planned straight away for the same people, and this one goes under Deleted in the board's Done view, marked Skipped. Restore brings it back. Anyone who can delete a job can skip one. Delete on a repeating job ends the series.
Finish, delete or restore a job
Finish: open the job and select Mark complete. Choosing Done under Status while editing opens the same completion details. For work already done, use New work → Record work already done (see Log a service or repair, or upload a service invoice).
Change it: tap the job on the notice board and select Edit at the top of its sheet. In the whole job (Full details), Edit is under More, beside the title.
Delete an open job: Delete job at the bottom of its sheet, or More → Delete in the whole job. To bring it back, open Done on the notice board, find it under Deleted and select Restore. A machinery job is also in Machinery → Tasks → Past → Filter → Status → Deleted.
Delete a finished job for good: More → Delete (or Delete permanently for a job already in Deleted), then Delete for good. This can't be undone. Parts it took off stock go back into stock; the machine's hours, a reminder's next due and any follow-on job stay as they are. People who can edit the farm can do this, and so can whoever added the job.
Fix a finished job: select Reopen. For the day or hours of a finished service, use Correct date or hours.
Find jobs
On the notice board, For me shows the jobs you're on and Everyone the whole farm's. A job you make for someone else is under Everyone (and their For me), not yours, and the Calendar always shows everyone's. Search finds a job by its words, and Filter narrows the board by Person (one or more people, or No one yet) or Kind of work, such as Fencing, Water, Livestock or Machinery. Who has what shows how many open jobs each person has; tap someone to see theirs. Calendar lays the jobs out by day, opening on Month.
Machinery jobs are also on Tasks in Machinery. Tasks has a Planned / Past switch, a search box and Filter: under Status, pick Today, Overdue, Upcoming or Assigned to me (Past adds Deleted); under Assignee, pick one or more people, or Unassigned. The Group switch sorts the list by Due date, Person or Machine, and each group has Add job. A bookmark of the page keeps your view.
Good to know
A tagged-out machine shows "(TAGGED OUT)" in the machine list.
Parts on a job come off stock once, even if it is reopened and finished again.
Numbers with commas, such as 12,000 hrs, are read correctly. A blank meter reading isn't saved as 0.
If something doesn't look right
"… was saved, but not assigned". The job saved; only the assignment failed. Open the job and assign it again rather than making it twice.
I can only pick one person, or there's no Recurrence. Both need permission to edit the farm. A machinery service or repair never has Recurrence: it repeats through a service reminder.
Delete didn't work. Try once more, then contact support: it is a fault, not a setting.