π― Overview
When workers clock in using the mobile Kiosk (CICO), all of their time is assigned to the project they clocked into. Rhumbix treats that time as a project bucket, and all % allocations must stay inside that bucket.
If you add cost codes from another project, you can still assign time to them β but not using % allocation. You will need to type the hours manually for those.
π¨ How Percentage Allocation Works on Mobile
Action | What Happens |
Worker clocks in on Project A | β All time goes into Project A's bucket |
Foreman adds cost codes from Project A | β Can use % OR manually type hours |
Foreman adds cost codes from Project B | β % will NOT apply because there is no CICO time in Project B |
Foreman wants time on Project B | β Must enter hours manually β % does not move time to another project |
π Looking for step-by-step instructions?
See Allocating Time by Percentage on Mobile (CICO)
π§ Key Rule to Communicate to Crews
If you clock in on Project A, you only have time in Project Aβs bucket.
So all % splits must stay on Project A β
thereβs no time in Project B to apply a percentage to.
To give time to Project B, type the hours in manually.
You do not have to use percentage on the CICO project β entering hours is always allowed.
π· Mobile Example
Your worker clocked in on the Kiosk and Rhumbix recorded 8 hours on Project A.
You open the Rhumbix app to create the timecard and add:
β Cost Code 1 (Project A)
β Cost Code 2 (Project A)
β Cost Code 3 (Project B)
What You Want To Do | What Works |
Split time on Project A | β % or manual entry both work |
Give some time to Project B | β Manual hours only β % wonβt apply |
Try % allocation on Project B | π« Nothing happens β no time exists in that project bucket |
π‘ Best Practice Recommendation
Scenario | Best Action |
All work was on one project with one CICO | β Use % OR manual β both are fine |
Work was split between two projects | π§ Consider separate CICO clock-ins OR use manual hour entry for the second project |
Crew wants quick split between codes on one CICO project | π % is a fast option |
Crew needs precise control | β Manual entry gives full control β even on the CICO project |
β Common Misunderstanding to Avoid
βI put 50% on Project B, but it didnβt move any time.β
β Thatβs expected β you didnβt clock in on Project B, so Rhumbix has no time there to split.
π Solution: Enter the time manually or clock in on that project separately.
π§ Quick Reminder for Foremen to Share with Crews
% = Split time where you clocked in
βManual hours = Move time anywhere you need
β Summary
Method | Works on CICO Project | Works on Other Projects |
% Allocation | β Yes | π« No |
Manual Hour Entry | β Yes | β Yes |
π Looking for step-by-step instructions?
See Allocating Time by Percentage on Mobile (CICO)