How to Create a Time-Based Maintenance Schedule?

A
Written by Arianna Ratti

To create a time-based maintenance schedule, follow these steps:

  1. Go to Tickets > Calendar > Manage Service Plans (top-right) > Create Service Plan (top-right)

  2. Select Time

  3. Enter a Name for the plan

  4. Set the cadence by adding the number in the Repeats every field and selecting days, weeks, months, or years

  5. Set the Ticket lead time: how long before the service date the ticket should be created

  6. You can add labels and a checklist (optional)

  7. Choose whether to create the service plan for an entire hub (all vehicles at a specific location) or for specific vehicles, such as a particular model or vehicle group. You can select multiple vehicles or multiple hubs

  8. Click Next

  9. Choose how long you want the Service Plan to run:

    • Select a Starts date

    • Select an Ends date if needed. If you don’t set an end date, the Service Plan will run indefinitely

  10. Select from the drop-down menu the users who should be notified to assign the tickets (optional)

  11. Choose how many days before the service date those users should be notified

  12. You can also decide if you want to add an estimated ticket duration (optional)

  13. To complete the process, click Create

Once configured, the service plan repeats automatically. A new maintenance ticket is created based on the cadence and ticket lead time you selected.