Steps
Open a spec
Go to the Pricing tab
Enter the price
Select the unit (each, yard, sq ft, etc.)
Click Save
Syncing with Budget Tab
Prices entered in the Pricing tab automatically appear in the Budget tab:
Quantity: From spec details
Unit Cost: From pricing tab
Extended Cost: Calculated automatically
Two-Way Sync
Changes work both directions:
Update price in Pricing tab → Updates in Budget tab
Update price in Budget tab → Updates in Pricing tab
Quantity Notes
If quantity is NOT assigned by area, you can edit it in the Budget tab
If quantity IS assigned by area (locked), edit it in the spec Details tab
Tips
Always include a unit for accurate calculations
Use the Budget tab for bulk price updates
Prices flow into reports automatically
Related Features
Add Item Level Cost to Budget
Adding Markups to Budget
Generate an Internal Budget
