Skip to main content

Building and Publishing a Menu

Written by Souha Alameddine

Build a menu by adding recipes from the recipe book and copying them across days, weeks and schools. Then publish it to your schools.

In this guide:

Navigation

  1. To create, edit or publish a menu, click Menu plans in the left sidebar. The menu plan page opens, where you work on new or existing menu plans. Use the menu plan icon at the top left to switch between menu plans.

  2. Click the icon in the lower right corner to open the recipe book. It shows all the recipes stored in your pantry, so you can select and manage them.

Go Back to This Week

When you're looking at any week other than this one, the date at the top of the menu turns teal with a calendar icon. Click the date and choose Go to this week to jump back.

Search the Recipe Book

  1. Use the Recipe book to search by menu name, public name, and other tags and attributes.

  2. You can also sort by the five NSLP food groups. For example, select Grain and Meat to narrow the list down to Entree recipes.

Add a Recipe to a Specific Meal and Day

  1. Select the recipe you want and drag it to the right date.

  2. To add items to the menu, click + Add item, or hover over a category name (for example, Milk) and click the + button. This keeps you on the chosen category and date, so you can add several items in a row from the recipe book.

Undo a Change

Click Undo last change at the top of the menu, or press Ctrl+Z (Command+Z on a Mac), to reverse your latest change. Click again to go back one more, newest first.

Undo covers adding a recipe (and any fixings it brought along), Remove from menu, dragging an item, changing a combo's word, and breaking a combo apart. It doesn't work while you're typing in a field or have a window open.

The history starts fresh when you publish, discard a draft, reset or skip a week, use Copy to, or switch week, plan or school, so Undo never changes a week you're not looking at. School managers don't see the button.

Copy Recipes to Other Days, Weeks and Menus

  1. Gaia lets you copy one or more recipes across multiple days and weeks. Click an item to select it. To select more than one, hold the Ctrl key and click each item. Then right-click and choose Copy to from the menu. You can also open Tools and choose Copy to. For example, add milk options to the first day and copy them to all the other days.

  2. Click + Add menu and select the menu or menus to copy to.

  3. Click + Add school to assign the selected items to a specific school. Choose General to apply the changes to all schools, or select individual schools to copy the items to specific locations.

  4. Click + Add day to choose specific days to copy the items to. This option is only available if the selected recipes are from the same day. If you're copying recipes across multiple days or the entire menu, only + Add week is available. It applies the selection to the same days in the new week (for example, Monday's recipes stay on Monday).

  5. Use the date picker to select the days or weeks you want.

  6. Click Copy to menus to apply the changes to the selected menus and dates.

The New Copy To

Coming soon. This arrives in Gaia the week of November 23, 2026, and replaces the steps above.

  1. Select the items to copy: click one, then hold Ctrl and click more. Or select a whole day. Then right-click and choose Copy to.

  2. In each row, pick the menu plan and the week or day to copy into. Weeks a plan doesn't cover are greyed out.

  3. If the destination is a different menu plan, the Categories section lists each category you're copying, with how many items it holds. Choose where each one goes in that plan, by template. You can pick more than one, or Don't copy. Gaia never guesses by name.

  4. If the two plans have different week lengths, Gaia asks which days to copy (or, for a shorter week into a longer one, which day to start on). The days that have items are already picked.

  5. With Service view on, a Lines section lets you choose where each line goes. Copying never changes an item's category.

  6. Click Copy to menus, or Copy and publish. Both stay greyed out until every category has an answer.

Combos keep their word, and items keep their lines and categories. Copying into a week outside the destination plan's dates is refused, with a message naming the plan.

Create a Combo

You can bundle 2 or more recipes that are already on the same day and category into a single combo, for example an entree with its side. See Create a Combo on a Menu for how to create one, how combo nutrition and meal-pattern credit work, and how to undo it.

Publish the Menu

  1. When you're ready to publish, click the status button at the top right. It reads Draft, followed by Click to publish, while you have unpublished changes. A menu opens with the version of the menu and, for a draft, the time it was last autosaved.

  2. In that menu, click Discard to dismiss your changes, or Publish to apply them to all relevant school menus and production records.

  3. On cycle menus, you can apply changes to a specific week or publish them to all future cycle weeks. Publishing sends notifications to all impacted schools. It also updates production records and public-facing menus like websites and digital boards.

The Status Button

The button at the top of the menu shows where the week stands: Draft, Published, or Revision for a draft of a week that's already published.

  1. Click the button to open the week's versions. The draft shows when it was last autosaved.

  2. Click Publish week to apply your changes to every school menu and production record the week covers.

  3. Click Discard to throw the draft away. It always asks first.

  4. Under Earlier versions, you can open a week's past published versions.

What Republishing Does to Production Records

When you publish a change to a week that is already published, Gaia updates that week's production records for every school on the menu plan. This can take up to 5 to 10 minutes. What changes depends on each record's status:

  • Draft records are updated to match the menu. New items are added, and items you took off the menu are removed. Recipes that are still on the menu keep the amounts already entered, and items a school added to the record by hand stay.

  • Confirmed records get new menu items added, but nothing is removed from them.

  • Submitted and Completed records are not changed.

If you added schools to the menu plan after the week was published, those schools get production records the next time the week is published.

Why a Week Won't Publish

  • The week has no recipes yet. The status button reads Draft with Add at least one recipe. Add a recipe first.

  • Nothing has changed since the last publish. Publish only appears next to a draft. To publish a week again, for example after adding schools to the menu plan, make a change to the week so the status button reads Revision, then click Re-publish.

  • A comment is needed. If clicking Publish or Re-publish does nothing and the Add a comment box is outlined in red, type a short note about what changed.

  • A recipe on the week has sample ingredients. Gaia says the week has sample ingredients and cannot be published. Replace the sample ingredients in that recipe, then publish again.

  • The week is outside a cycle menu's dates. The menu shows Menu plan doesn't cover this week. Change the cycle end date in the menu plan's settings to include the week.

  • You are signed in as a school manager. School managers don't see the status button. Your nutrition director publishes menus.

If none of these fit, contact us with the menu plan, the week, and what you see on screen.

Disabling Service for a Day

There are a few ways to control service availability on a given day.

District-Wide Off Days

District-level days off (days when no schools are serving) are configured in Settings by the Gaia team. You can't currently access them yourself. To add or remove a district-wide off day, contact Gaia support.

Disabling Service on the General Menu (All Schools)

You can also disable service for all schools on a specific day. Go to that day on the general menu and select Disable Service.

Important: this takes the week off-cycle

Disabling service on the general menu takes the entire week off-cycle. You need to republish before the change is visible on school menus and production records. See Cycle Menus: Managing Changes After Publishing for more on what off-cycle weeks mean.

Disabling Service for Specific Schools Only

If only some schools are closed on a given day, you can disable service at the school level instead.

  1. Go to the school-specific menu for the relevant week.

  2. Find the day you want to disable and select Disable Service.

  3. Publish the changes for that school's menu.

  4. Repeat for each additional school that should have service disabled that day.

Schools you don't modify keep showing their regular menu for that day.

Turn Service Back On for a Day

A day with service turned off shows No service on the menu, with the holiday name if it is a district off day. To serve on that day:

  1. Open the week on the menu: the general menu, or the school's menu if service was turned off for one school.

  2. On the No service day, click Enable Menu Card.

  3. Publish the week. School menus and production records only change once the week is published.

This works for a day turned off with Disable Service, and for a district off day you want to serve on for that week only. The Enable Menu Card button only shows once the week has a menu. To remove a district-wide off day for good, contact Gaia support.