To make it easier to search the HandsHQ content library, we've made a list of categories and what they contain. Scroll down to see the full index!
HandsHQ content structure
The HandsHQ library is split up into categories. Each category contains:
Risk assessments: hazards, controls and risks
Sequence of operations: step-by-step work instructions
Method statement: other information relevant to the work, e.g. training, permits and safety guidance
After you've selected your risks, sequences and method statement sections from the chosen categories will be available on your project.
To create your own RAMS using the HandsHQ content, sign up here.
Latest updates
Searching for risks and method statements available in HandsHQ
Click on a category below to see the full list of contents.
To search for a specific keyword, use the 'ctrl + F' or '⌘ + F' shortcut.
Index of HandsHQ categories
Lone working - NEW
Mental health - NEW
General demolition - NEW
Hot works - NEW
Pipe Freezing - Coming soon
Tree works - coming soon!
General
The General category differs from the rest of the HandsHQ library. The so called 'method statement' section in General contains all the information needed in a RAMS document that doesn't fit as a risk assessment or sequence of operations. This can be edited or removed as desired.
Back to top ⬆️
Risk assessments | Sequence of operations | Method statement |
General office work | Work steps [blank task to be filled in] | Description of activity |
Working outside |
| Training |
Visually impaired people at work |
| Legislation |
Delivery of materials |
| Method of access |
Contact with electricity from overhead power sources |
| General waste handling |
Working with or around mould spores |
| Use of skips |
Working adjacent to a railway line |
| Hazardous waste |
Working in dusty environments |
| Hazardous substances |
Working in noisy environments |
| Emergency procedures |
Working with or around combustible materials |
| First aid facilities |
Working in confined spaces |
| Welfare requirements |
Young people at work |
| Specific PPE requirements |
Preventing slips, trips and falls |
| Additional information |
Arrival & departure from site |
|
|
Working within risers |
|
|
Lone working |
|
|
Working on, near or over water |
|
|
Working out of hours |
|
|
Working in occupied areas |
|
|
Preventing exposure to asbestos fibres |
|
|
Working around live electrical equipment |
|
|
Working around needles, syringes or other sharp objects |
|
|
Exposure to sewage, rats and vermin |
|
|
COVID-19 (Coronavirus)
The Covid-19 category is constantly monitored and updated as regulations change. The sequence of operations also includes an image library of Covid-secure illustrations. You can read more about our Covid updated here.
Back to top ⬆️
Risk assessments | Sequence of operations | Method statement |
Covid-19 |
| Covid-19 Statement |
Plant and equipment
Back to top ⬆️
Risk assessments | Sequence of operations | Method statement |
Dovertailer machine | Using telehandlers to lift suspended loads | Tools and equipment |
Hand fed planing machines |
|
|
Tenoning machines |
|
|
Pillar drill |
|
|
Horizontal beam and vertical panel saws |
|
|
Spindle moulding machines |
|
|
Circular saw benches |
|
|
Planner and thicknesser |
|
|
Four-sided moulding machine |
|
|
Mortising machine |
|
|
Power operated cross-cut saws |
|
|
CNC machine |
|
|
Operating bandsaw |
|
|
Hand soldering |
|
|
Mobile generator |
|
|
Using mapress machine - 110v |
|
|
Using blow lamp or similar |
|
|
Using nail guns |
|
|
Using airless sprayer |
|
|
Using road roller |
|
|
Using fork lift trucks |
|
|
Plant lifting operations |
|
|
Using cartridge tools |
|
|
Using hand tools |
|
|
Using tipper lorries and lorry loaders |
|
|
Using site dumpers |
|
|
Using excavators |
|
|
Using vehicles onsite |
|
|
Using abrasive wheels |
|
|
Using disc cutters |
|
|
Using vibrating machinery |
|
|
Using portable power tools |
|
|
Using telehandlers |
|
|
Use of a passenger / goods hoist - NEW |
|
|
Working at height
Back to top ⬆️
Risk assessments | Sequence of operations | Method statement |
Working on stilts | n/a | Working from height |
Rescue plan |
| Ladder permits |
Pitched roof ladder access |
|
|
Using mobile man anchor |
|
|
Working by or over skylights |
|
|
Using ladders |
|
|
Working on podium steps |
|
|
Preventing falling debris or tools from height |
|
|
Using personal fall arrest / fall restraint equipment |
|
|
Working from step ladders |
|
|
Working on fragile roof structures at height |
|
|
Using mobile elevating work platforms (MEWP) |
|
|
Working on flat roofs |
|
|
Working on sloping roofs |
|
|
Working within lofts |
|
|
Working on fixed scaffolds |
|
|
Working on mobile scaffold |
|
|
Manual handling
Back to top ⬆️
Risk assessments | Sequence of operations | Method statement |
Cable pulling | Pushing and pulling | Manual Handling |
Moving pipes, rolls or irregular shaped or sized materials | Dual / two person lift |
|
Moving of general materials of normal size and shape | Control for loading of vehicles |
|
Movement of boxed materials |
|
|
Lone working
Risk assessments | Sequence of operations | Method statement |
Lone working | n/a | General lone working arrangements |
Mental health
Risk assessments | Sequence of operations | Method statement |
General mental health | n/a | Mental health - general management recommendations |
Site set-up
Back to top ⬆️
Risk assessments | Sequence of operations | Method statement |
Working on a greenfield site | Installation of compound and storage areas | n/a |
Site surveying | Installation of office and welfare facilities |
|
Stake driving |
|
|
Installing heras fencing |
|
|
Tensioning of wire fencing |
|
|
Safe storage of fencing |
|
|
General carpentry works |
|
|
Avoiding buried services |
|
|
Excavation |
|
|
Fencing
Back to top ⬆️
Risk assessments | Sequence of operations | Method statement |
Site surveying | Sign in and induction | Fencing: Codes of practice |
Installing heras fencing | Removal of fencing | Fencing: Other |
Safe storage of fencing | Preparing for new fence work | Fencing: Special permits |
Tensioning of wire fencing | Installing close board fencing | Fencing: Tools and equipment |
Avoiding buried services | Install chain link fencing |
|
Stake driving | Install galvanised palisade fencing |
|
General carpentry works | Installing mesh panel fencing |
|
| Installing heras fencing |
|
Scaffolding
Back to top ⬆️
Risk assessments | Sequence of operations | Method statement |
Raising / lowering materials by Ginny wheel and rope | Sign in and induction | Scaffolding: Training |
Erecting / dismantling scaffolding systems | Delivery or removal of scaffolding from site | Scaffolding: Codes of practice |
Delivery and collection of scaffolding | Erecting multi lift independent tied scaffold | Scaffolding: Other |
| Dismantling multi lift independent tied scaffold | Scaffolding: Special permits |
| Erecting 'A' frame guardrail scaffold | Scaffolding: Tools and equipment |
| Dismantling 'A' frame guard rail system |
|
| Erecting single lift/multi lift Birdcage scaffold |
|
| Dismantling single lift/multi lift Birdcage scaffold |
|
| Erecting ladder beams/unit beams |
|
| Dismantling ladder beams/unit beams |
|
Excavation
Back to top ⬆️
Risk assessments | Sequence of operations | Method statement |
Site surveying | Sign in and induction | Excavation: Legislation |
Avoiding buried services | Initial works | Excavation: Codes of practice |
Excavation | Excavation works | Excavation: Other |
Safe storage of steel |
| Excavation: Special permits |
General carpentry works |
| Excavation: Tools and equipment |
Demolition of brickwork |
| Excavation: Permit to dig |
Ground works
Back to top ⬆️
Risk assessments | Sequence of operations | Method statement |
Site surveying | n/a | Ground Works |
Excavation |
|
|
Plant lifting operations |
|
|
Using air hammers |
|
|
Vibratory hammers |
|
|
Piling works |
|
|
Avoiding buried services |
|
|
General demolition
Back to top ⬆️
Risk assessments | Sequence of operations | Method statement |
General demolition | n/a | General demolition: Training |
|
| General demolition: Ground works |
|
| General demolition: Demolition management |
Concrete works
Back to top ⬆️
Risk assessments | Sequence of operations | Method statement |
Cement rendering | Sign in and induction | Concrete works: Codes of practice |
Using concrete blocks | Preliminary foundation works | Concrete works: Other |
Pouring concrete | Installing formwork & reinforcement | Concrete works: Special permits |
General carpentry works | Pouring concrete | Concrete works: Tools and equipment |
Welding | Concrete surface repairs |
|
| Slab cutting |
|
| Cement rendering |
|
Steelworks
Back to top ⬆️
Risk assessments | Sequence of operations | Method statement |
Installation of Metsec SFS | Arrival onsite | Steelworks: Legislation |
Safe storage of steel | Demolition of existing structures | Steelworks: Codes of practice |
Structural steel demolition | Unloading of deliveries | Steelworks: Other |
Welding | Setting out for new steel structural works | Steelworks: Special permits |
| Installation of steel columns | Steelworks: Tools and equipment |
| Installation of beams |
|
| Installation of joists |
|
| Safety netting installation |
|
| Installation of handrails |
|
| Installation of decking |
|
| Installation of Metsec SFS from scaffolding |
|
| Installation of Metsec SFS from MEWPS |
|
| Staircase installation |
|
Hot works
Risk assessments | Sequence of operations | Method statement |
General welding | Using a flame torch (thermal cutting) - fume control | Hot works permit |
Hand soldering | Training and instruction for Oxy/fuel equipment use |
|
Arc welding | Hot works - pre start inspection |
|
Hot riveting | Using a bitumen boiler - general safety precautions |
|
Brazing | Using a bitumen boiler - heating the bitumen |
|
Bitumen boilers | Use of bitumen and hot-melt systems |
|
Flame cutting |
|
|
Using blow lamp or similar |
|
|
Using abrasive wheels |
|
|
Using disc-cutters |
|
|
Pre-cast concrete works
Back to top ⬆️
Risk assessments | Sequence of operations | Method statement |
Hollowcore flooring installation | Pre-start works | Precast concrete works: Training |
Beam and block flooring | Installation of block and beam floor | Crane Type / Position |
Precast stairs installation |
| Maximum component weights and crane working radius |
|
| Stability and bearings |
Bricklaying
Back to top ⬆️
Risk assessments | Sequence of operations | Method statement |
Using concrete blocks | Delivery of materials | Bricklaying: Codes of practice |
General carpentry works | Mixing of compounds | Bricklaying: Other |
Demolition of brickwork | Demolition of brickwork | Bricklaying: Special permits |
General masonry works | Form masonry walls | Bricklaying: Tools and equipment |
Working with lead | Prepare area for re-pointing work |
|
| Re-point wall |
|
Stone Masonry
Back to top ⬆️
Risk assessments | Sequence of operations | Method statement |
Using concrete blocks | Sign in and induction | Stone masonry: Codes of practice |
General masonry works | Delivery of materials | Stone masonry: Other |
Repair of general stone masonry | Mixing of compounds | Stone masonry: Special permits |
Working with lead | Form masonry walls | Stone masonry: Tools and equipment |
Roof works
Back to top ⬆️
Risk assessments | Sequence of operations | Method statement |
General carpentry works | Sign-in and induction | Roof works: Training |
Installation of roof trusses | Inspection and access onto roof | Roof works: Legislation |
Working with lead | Maintenance or cleaning of roof | Roof works: Codes of practice |
Copper sheet and strip | Removal of roof cladding and structure | Roof works: Special permits |
Installing concrete roof tiles | New roof trusses | Roof works: Tools and equipment |
Using concrete blocks | New roofing structure or cladding | Roof works: Other |
Asphalt heating and transportation | Installing vapour control layer |
|
Working with roof tiles | Installing insulation |
|
Installing timber joists | Installing membrane |
|
Fitting Roof and Low-level Roof Trusses | Detailing |
|
Working on fragile roofs | Roof finishes |
|
| Working on fragile roofs |
|
Joinery and carpentry
Back to top ⬆️
Risk assessments | Sequence of operations | Method statement |
Using floor sander | Removal of existing joinery | Joinery and carpentry: Codes of practice |
General carpentry works | Delivery of materials | Joinery and carpentry: Other |
Installing timber joists | Joinery 1st Fix | Joinery and carpentry: Special permits |
Installation of roof trusses | Joinery 2nd Fix | Joinery and carpentry: Tools and equipment |
HVAC
Back to top ⬆️
Risk assessments | Sequence of operations | Method statement |
Air handling unit works | Service and maintenance | HVAC: Legislation |
Drilling into Artex textured surface | Removal of existing HVAC services | HVAC: Codes of practice |
Fan coil unit works | Containment tray installed | HVAC: Other |
General plumbing works | Pipework installation | HVAC: Special permits |
Ductwork installation | Condenser unit(s) install | HVAC: Tools and equipment |
Copper pipework installation | Low voltage electrical works |
|
Repairs to manholes and live drains | Fan coil / AC unit installation |
|
Charging or decanting ammonia refrigerant | Ductwork installation |
|
Thermal & acoustic insulation to pipework | Pressure testing pipework |
|
Testing pressure systems | Adding of refrigerant |
|
Installation of cable trunking and trays | Test & Commissioning |
|
Condenser installation |
|
|
Charging or decanting synthetic refrigerant |
|
|
Electrical
Back to top ⬆️
Risk assessments | Sequence of operations | Method statement |
Drilling into Artex textured surface | Electrical isolations | Shared: Training |
Installation of cabling | Removal of existing electrical services | Shared: Legislation |
Avoiding buried services | Working in live electrical risers | Shared: Codes of practice |
Electrical isolations | Metal containment tray and conduit installed | Electrical: Other |
Installing new lighting | Install new distribution board | Electrical: Special permits |
Installing new distribution board | Install lighting | Shared: Tools and equipment |
PAT testing of appliances or tools | Underfloor small power |
|
Electrical work up to 400 volts | Installing small power above floor |
|
Removal of existing electrical services | Testing and commissioning |
|
Electrical testing and commissioning | Maintenance - PAT testing |
|
Installation of cable trunking and trays | Maintenance - Emergency lighting test |
|
Plumbing
Back to top ⬆️
Risk assessments | Sequence of operations | Method statement |
Chemical disinfection | Sign in and induction | Plumbing: Training |
Thermal disinfection | Removal of existing plumbing services | Plumbing: Legislation |
Pipe threading / grooving machines | Containment tray installation | Shared: Codes of practice |
Avoiding buried services | Internal pipework installation | Plumbing: Other |
General plumbing works | Underground pipework water supply installation | Plumbing: Special permits |
Copper pipework installation | Underground sewerage & storm water pipework install | Plumbing: Tools and equipment |
Repairs to manholes and live drains | Install fixtures and fittings |
|
Thermal & acoustic insulation to pipework | Test and commission |
|
Testing pressure systems |
|
|
Installation of cable trunking and trays |
|
|
Gas and heating works
Back to top ⬆️
Risk assessments | Sequence of operations | Method statement |
Pipe threading / grooving machines | Purging of gas | Gas & heating works: Legislation |
Avoiding buried services | Removal of existing gas fixtures and fittings | Gas & heating works: Codes of practice |
Oil central heating works | Containment tray installation | Gas & heating works: Other |
General plumbing works | Internal pipework installation | Gas & heating works: Special permits |
Ductwork installation | Form a base or enclosure for plant | Gas & heating works: Tools and equipment |
Copper pipework installation | Install fixtures and fittings |
|
Purging of industrial or commercial gas pipes | Changeover / Upgrade of domestic gas fired boiler and system |
|
Gas fittings and fixtures works | Test and commission |
|
Repairs to manholes and live drains |
|
|
Thermal & acoustic insulation to pipework |
|
|
Testing pressure systems |
|
|
Installation of cable trunking and trays |
|
|
Solar panel works
Back to top ⬆️
Risk assessments | Sequence of operations | Method statement |
Electrical work up to 400 volts | Sign in and induction | Shared: Training |
Installation of cabling | Site establishment | Shared: Legislation |
Installation of cable trunking and trays | Decommission of solar photovoltaic system | Shared: Codes of practice |
Removal of existing electrical services | Installation of solar photovoltaic system | Shared: Tools and equipment |
Electrical testing and commissioning |
|
|
Electrical isolations |
|
|
Installation of solar photovoltaic system |
|
|
Fire alarm systems
Back to top ⬆️
Risk assessments | Sequence of operations | Method statement |
Testing and commissioning fire alarm system in occupied space | Isolate fire alarm loops | Fire alarm systems: Codes of practice |
Installation of cable trunking and trays | Add to existing fire alarm | Fire alarm systems: Other |
| New fire alarm works | Fire alarm systems: Special permits |
| Commissioning fire alarm system | Fire alarm systems: Tools and equipment |
Fire stopping systems
Back to top ⬆️
Risk assessments | Sequence of operations | Method statement |
Drilling into Artex textured surface | Sign in and induction | Fire stopping systems: Codes of practice |
Installation of fire stopping or penetration seals | Installing mineral fibre slabs and strips to openings and around service penetrations | Fire stopping systems: Other |
| Installing foam to openings and around service penetrations | Fire stopping systems: Special permits |
| Installing bags/pillows to openings and around service penetrations | Fire stopping systems: Tools and equipment |
| Installing plugs/blocks to openings and around service penetrations |
|
| Installing pipe closures to plastic pipework |
|
| Installing fire proof mastic / sealant |
|
| Installing fire curtain wall systems |
|
| Installting fire boarding to opening or around structural member |
|
| Air sealing areas |
|
| Testing and Commissioning |
|
| Fire stopping checks |
|
Sprinkler systems
Back to top ⬆️
Risk assessments | Sequence of operations | Method statement |
Pipe threading / grooving machines | Sign in and induction | Sprinkler systems: Codes of practice |
Working & awareness of legionella on fire & hose reel systems | Precautions taken against legionnaires disease | Sprinkler systems: Other |
| Drain down works | Sprinkler systems: Special permits |
| Maintenance service to sprinkler systems | Sprinkler systems: Tools and equipment |
| Fabrication & installation of threaded pipe |
|
| Installation of Feed mains |
|
| Testing and commissioning |
|
Structured cabling systems
Back to top ⬆️
Risk assessments | Sequence of operations | Method statement |
Installation of cabling | Sign in and induction | Structured cabling systems: Codes of practice |
Installation of cable trunking and trays | Removal of existing cabling | Structured cabling systems: Other |
| Metal containment tray and containment installation | Structured cabling systems: Special permits |
| Delivery of materials | Structured cabling systems: Tools and equipment |
| Install cabling |
|
| Equipment install |
|
| Cable termination and labelling |
|
Security installation
Back to top ⬆️
Risk assessments | Sequence of operations | Method statement |
Installing intruder alarms | Sign in and induction | Security installation: Codes of practice |
Installation of cable trunking and trays | Removal of existing cabling | Security installation: Other |
Installation of cabling | Delivery of materials | Security installation: Special permits |
| Metal containment tray and containment installation | Security installation: Tools and equipment |
| Install cabling |
|
| Equipment 1st fix |
|
| Equipment 2nd fix |
|
| Cable termination and labelling |
|
Security gate installation
Back to top ⬆️
Risk assessments | Sequence of operations | Method statement |
Avoiding buried services | Pre-site works | n/a |
Stake driving | New gate installation |
|
General carpentry works |
|
|
Site security
Back to top ⬆️
Risk assessments | Sequence of operations | Method statement |
Loss on site (theft/ property damage) | n/a | n/a |
Unauthorised access |
|
|
Violent event in the workplace |
|
|
Use of drones |
|
|
Emergency arrangements and unrest |
|
|
Lone working |
|
|
CCTV
Back to top ⬆️
Risk assessments | Sequence of operations | Method statement |
Drilling into Artex textured surface | Sign in and induction | n/a |
Installation of cable trunking and trays | Removal of existing cabling |
|
Installation of cabling | Delivery of materials |
|
| Metal containment tray and containment installation |
|
| Install cabling |
|
| Equipment 1st fix |
|
| Equipment 2nd fix |
|
| Cable termination and labelling |
|
Audio visual
Back to top ⬆️
Risk assessments | Sequence of operations | Method statement |
Working on raised unguarded staging | Sign in and induction | Audio visual: Codes of practice |
Working on a greenfield site | Removal of existing cabling | Audio visual: Other |
Working in a public area | Delivery of materials | Audio visual: Special permits |
Manoeuvring of equipment onsite | Metal containment tray and containment installation | Audio visual: Tools and equipment |
Installation and de-rig of LED video wall title | Install cabling | Audio visual: Venue requests |
Floor covering stage/stand | Equipment 1st fix |
|
Building of stage | Equipment 2nd fix |
|
Dancefloor | Cable termination and labelling |
|
Setting up LED screen | Installing a mobile bar |
|
Power to stage | Installing staging |
|
Access to and from stage | Installing a dancefloor |
|
Drilling into Artex textured surface | Installing DJ/ LED booth |
|
Hanging or installing heavy audio visual equipment | Install LED panels |
|
Installation of cabling |
|
|
Installation of cable trunking and trays |
|
|
Access control
Back to top ⬆️
Risk assessments | Sequence of operations | Method statement |
Installation of cable trunking and trays | Sign in and induction | Access control: Codes of practice |
Installation of cabling | Removal of existing cabling | Access control: Other |
| Delivery of materials | Access control: Special permits |
| Metal containment tray and containment installation | Access control: Tools and equipment |
| Install cabling |
|
| Equipment 1st fix |
|
| Equipment 2nd fix |
|
| Cable termination and labelling |
|
Electronic call systems
Back to top ⬆️
Risk assessments | Sequence of operations | Method statement |
Installation of cable trunking and trays | Sign in and induction | Electronic call systems: Codes of practice |
Installation of cabling | Removal of existing cabling | Electronic call systems: Other |
| Delivery of materials | Electronic call systems: Special permits |
| Metal containment tray and containment installation | Electronic call systems: Tools and equipment |
| Install cabling |
|
| Equipment 1st fix |
|
| Equipment 2nd fix |
|
| Cable termination and labelling |
|
Dry lining, plastering or tape jointing
Back to top ⬆️
Risk assessments | Sequence of operations | Method statement |
Anthrax and historic plaster | Removal of existing dry lining | Drylining, plastering or tape jointing: Codes of practice |
Drilling into Artex textured surface | Delivery of dry lining materials to site | Drylining, plastering or tape jointing: Other |
Preparing surfaces for decorations | Form MF ceiling | Drylining, plastering or tape jointing: Special permits |
General carpentry works | Form plasterboard partitions | Drylining, plastering or tape jointing: Tools and equipment |
General plastering / tape & jointing works | Fibrous plaster mouldings 1st fix |
|
| Mixing compounds |
|
| Apply plaster/jointing compounds to surface |
|
| Fibrous plaster mouldings 2nd fix |
|
Suspended ceiling works
Back to top ⬆️
Risk assessments | Sequence of operations | Method statement |
Drilling into Artex textured surface | Sign in and induction | Suspended ceiling works: Codes of practice |
Suspended ceiling works | Preliminary works | Suspended ceiling works: Other |
| Removal of suspended ceiling | Suspended ceiling works: Special permits |
| Suspended ceiling install | Suspended ceiling works: Tools and equipment |
Floor and wall tiling
Back to top ⬆️
Risk assessments | Sequence of operations | Method statement |
Disposal of waste materials | Sign in and induction | Floor and wall tiling: Codes of practice |
Installation of new flooring systems | Removal of existing tiles | Floor and wall tiling: Other |
Transporting materials and tools | Surface preparation | Floor and wall tiling: Special permits |
Using mechanical tile cutter | Ceramic or stone floor tile installation | Floor and wall tiling: Tools and equipment |
Mixing and applying floor preparation products | Ceramic or stone wall tile installation |
|
| Sign off |
|
Painting and Decorating
Back to top ⬆️
Risk assessments | Sequence of operations | Method statement |
Preparing surfaces for decorations | Sign in and induction | Painting and decorating: Codes of practice |
General painting works | Interior decorations | Painting and decorating: Other |
| Interior decorations - paint spraying | Painting and decorating: Special permits |
| Painting to floor | Painting and decorating: Tools and equipment |
| Exterior decorations |
|
Catering equipment installation
Back to top ⬆️
Risk assessments | Sequence of operations | Method statement |
General plumbing works | Electrical Isolations | Catering equipment installation: Codes of practice |
Ductwork installation | Removal of existing services | Catering equipment installation: Other |
Copper pipework installation | Metal containment tray and conduit installed | Catering equipment installation: Special permits |
Gas fittings and fixtures works | Pipework installation | Catering equipment installation: Tools and equipment |
Electrical isolations | Install low voltage lighting or similar |
|
Electrical work up to 400 volts | Install small power |
|
Removal of existing electrical services | Install fixtures and fittings |
|
Electrical testing and commissioning | Test and commission |
|
Thermal & acoustic insulation to pipework |
|
|
Testing pressure systems |
|
|
Installation of cable trunking and trays |
|
|
Locksmith
Back to top ⬆️
Risk assessments | Sequence of operations | Method statement |
General locksmith works | Repair / replacement / new lock | n/a |
|
|
|
Floor laying
Back to top ⬆️
Risk assessments | Sequence of operations | Method statement |
Disposal of waste materials | Sign in and induction | Floor laying: Codes of practice |
Installation of new flooring systems | Off load materials/manual handling/storage | Floor laying: Other |
Transporting materials and tools | Removal of existing vinyl | Floor laying: Special permits |
Using floor sander | Removal of existing carpet | Floor laying: Tools and equipment |
Using welding gun | Apply sealer / damp proof membrane |
|
Mixing and applying floor preparation products | Apply primer |
|
| Floor preparation and screeding |
|
| Fit cove former |
|
| Fit capping strip |
|
| Fit vinyl sheet |
|
| Fit vinyl tiles |
|
| Fit carpet/matting tiles |
|
| Fit broadloom carpet |
|
| Fit stair carpet |
|
| Fit engineered wood strip |
|
| Fit laminate wood strip |
|
| Fit aluminium nosings |
|
| Fit needlepuch textured carpet |
|
| Sanding floor |
|
| Handover |
|
Carpet laying
Back to top ⬆️
Risk assessments | Sequence of operations | Method statement |
Installation of new flooring systems | Sign in and induction | Carpet laying: Codes of practice |
Disposal of waste materials | Removal of existing carpet | Carpet laying: Other |
Transporting materials and tools | Floor preparation | Carpet laying: Special permits |
Mixing and applying floor preparation products | Laying carpet | Carpet laying: Tools and equipment |
Glazing
Back to top ⬆️
Risk assessments | Sequence of operations | Method statement |
Handling and installing glass | General | Glazing: Legislation |
General carpentry works | Delivery of materials to site | Glazing: Codes of practice |
| Removal of glazing or glazing systems | Glazing: Other |
| Removal of timber framed windows and doors | Glazing: Special permits |
| Removal of Box-sash windows | Glazing: Tools and equipment |
| Removal of metal framed windows |
|
| Removal of PVC-U framed windows and doors |
|
| Removal of roof windows |
|
| Removal of sub-sills |
|
| Bay Poles |
|
| Install glazing partition system |
|
| Installation of timber windows and doors |
|
| Install door glazing |
|
| Install window glazing |
|
| Installation packers |
|
| Window and door fixing |
|
| Open cavities |
|
| Glazing |
|
| Finishing off and making good |
|
| Sealing |
|
| Finishing off installed hardware & fittings |
|
| Cleaning PVC-U Frames |
|
| Cleaning glass |
|
| Final Inspection |
|
Paving and ground surface works
Back to top ⬆️
Risk assessments | Sequence of operations | Method statement |
Asphalt heating and transportation | Sign in and induction | Paving and ground surface works: Codes of practice |
Using concrete blocks | Initial surface works | Paving and ground surface works: Other |
Laying tarmacadam | Kerb and edging works | Paving and ground surface works: Special permits |
Laying of brick or block paving | Laying blockwork paving | Paving and ground surface works: Tools and equipment |
Avoiding buried services | Laying of tarmacadam |
|
General carpentry works | Completion and making good |
|
Pouring concrete |
|
|
Landscaping
Back to top ⬆️
Risk assessments | Sequence of operations | Method statement |
Working around plants, fungi and seeds | Sign in and induction | Landscaping: Codes of practice |
Felling trees | Delivery of materials | Landscaping: Other |
Excavation | Earth moving | Landscaping: Special permits |
General carpentry works | Planting | Landscaping: Tools and equipment |
Avoiding buried services | Tree felling |
|
Cleaning
Back to top ⬆️
Risk assessments | Sequence of operations | Method statement |
Using a steam cleaner | Sign in and induction | Cleaning: Codes of practice |
Using a "Reach and Wash" window cleaning system | Inspection and access onto roof | Cleaning: Other |
Operating pressure washing plant | Cleaning of roof | Cleaning: Special permits |
General cleaning works | Cleaning of windows | Cleaning: Tools and equipment |
| Cleaning of internal space | Cleaning: Training |
| Using a "Reach and Wash" window cleaning system |
|
Blind installation
Back to top ⬆️
Risk assessments | Sequence of operations | Method statement |
Electrical work up to 400 volts | Delivery of materials to site | Blind installation: Tools and equipment |
| Installation of blinds | Blind installation: Codes of practice |
|
| Blind installation: Other |
|
| Blind installation: Special permits |