John Deere product names don't have to match your Phase products exactly. In Reconcile you link each John Deere product to a Phase product, on one job or for every waiting job at once, then confirm a backlog in batches.
Before you start
Reconcile is at More → Daily work → Work reconcile → John Deere, on Phase Ultra or the free trial.
Anyone who can open Reconcile can pick a product on a job. Saving what a John Deere name means for every job needs permission to edit crop plans.
Confirming, one job or a batch, needs the Record completed work permission.
Match the products on one job
Open a job and look under Match the machine products. Each product John Deere reported keeps its own row beside the Phase product it is matched to, under Deere reported, Phase product · match status, Applied rate and Total applied. A count such as 3/4 matched shows how many are matched. On a phone the details stack on each row. A harvest job has a Harvest panel instead; see John Deere harvest jobs, diesel and job maps.
The match status reads Matched automatically, Matched by you, Your farm’s choice (a name someone on the farm saved), Not matched · unpriced or Name only · no stock · unpriced.
Matching on the APVMA number. When John Deere records a product's APVMA registration number on the job, Phase matches on that number first, before the name, so a product named "Glypho bulk (1)" in Operations Center still lands on the right product. If the job has no number, Phase looks for it in your organisation's own product list in Operations Center. A product matched this way shows its number, such as APVMA 61999, beside the suggestion instead of Library match. Phase skips the number if the actives saved for the product in Operations Center don't agree with the Phase product it points to. A product you picked yourself, and a name the farm saved with Match product names, still win over the number. If Operations Center has no numbers, products match by name as before.
Select the Phase product on the row, or Choose product if there isn't one.
In Match Deere product, pick the product. Phase checks John Deere's spelling against your products and the Phase product library to suggest one.
If other waiting jobs of the same kind, season and mix use that John Deere name, Phase asks on the line: select Use for all N (or Use on that job too when there is one other job), or Just this job.
Each job gets the pick as its own, so any one can still be changed. Another brand with the same actives, strength and formulation is offered as a suggestion to check, never swapped in for your stock automatically.
Under the applied rate, Plan shows the planned rate and a percentage shows how far the actual is from it. Phase converts compatible units, such as mL/ha and L/ha, before comparing.
Correct a rate, a total or a name
Select the rate or the total on the row. Edit applied amounts opens, showing what John Deere reported.
Correct the Applied rate, the Total applied (zero is allowed) or the Recorded product name.
Select Save.
Changing the name doesn't change the stock match. A total you type overrides rate × area; Use Deere total or Use calculated total puts it back, and Reset rate to Deere undoes a rate edit. The original John Deere reading stays visible. The caption under each total says Deere measured, From rate × area or Total edited.
Concentration rates. If John Deere gave a rate per 100 L or as a percentage, Phase needs the actual spray volume to work out the rate per hectare. The row asks you to Review spray rate, Review rate or total or Review concentration. Enter the actual spray rate, or the product's actual rate or total.
Leave a product out, or add one
Don't use leaves a product out of the recorded job and stock use. The row stays with Restore product until you confirm, and doesn't count against the plan when Phase checks the match.
Products on the plan that John Deere didn't report show with their planned rate, for example "On the plan · 2 L/ha · not in the Deere job". Add brings one in with an empty actual rate, so a planned amount can't become a completed amount without you entering it. Add all N from plan adds every one.
Add product adds any other product.
Match product names across the whole queue
Tell Phase once what each John Deere name means, and every waiting job follows.
Select Match N product names under the search box. Match product names lists every product name on the jobs waiting this season, with how many jobs use each.
Work down Not linked yet. Check the product Phase suggests, or select Choose product.
Tick each name you're sure of.
Select Save N names.
Every waiting job using a saved name links to that product straight away, and so does the next import. Confirmed jobs are not changed.
Different ways of writing a name (capitals, a hyphen, "Herbicide" on the end) are one row, with the others under Also written.
A name that already links by itself shows Links by its name already.
A slipped letter or missing space arrives ticked as Same name, spelt differently.
Anything less certain, such as a similar name or a product sharing only the active ingredient, is offered unticked after Suggested:, with the reason.
Where several of your products could fit a general name, such as "glyphosate 450" when you hold two brands, Phase shows them all and picks none.
An unticked row saves nothing, and those jobs keep recording the product by name only.
Look up N names in the Phase library checks names nothing of yours resembles, up to 20 at a time, only when pressed. What it finds is never ticked for you; a product not in your list yet has Add it and use it.
To change or remove a saved answer, find it under Already linked and select Change product or Remove, then save.
Confirm ready jobs in batches
Confirm ready jobs (N) confirms waiting jobs that need nothing more: a paddock, and nothing stopping them.
To work in smaller lots, first use search and Filters to show one paddock, kind of work or date range.
Select Confirm ready jobs (N) under the search box.
Check each row: paddock, date, kind of work, plan pass (or "Recorded on its own"), products, and whether stock will move.
Tick or untick jobs, or use Tick all N and Untick all.
Select Confirm N jobs. Over 100 ticked, it reads, for example, Confirm the first 100 of 180.
Keep the sheet open until it finishes. Stop after this job halts it cleanly.
Select Back to the list to see the jobs as they are now and do the next 100, or Close.
Each job is confirmed exactly as pressing confirm on it would, with its own Deduct from inventory setting. Jobs with every product matched start ticked. A job starts unticked, with the reason, when a product would post by name only, something needs checking, Phase wasn't sure of the plan job (Check the plan match first), that plan job was already marked done by hand, or John Deere is still adding to it. You can tick these yourself.
A job that changed since you looked is left waiting. If a job fails, the run stops and says why. Each confirmed job can still be undone; see Confirm, undo or ignore a John Deere job.
Good to know
How products are listed. Each product in a tank mix shows once, at the rate and total the sprayer measured. The same product in two mixes on one job, such as a first and second defoliation pass, shows once per mix. John Deere's target or set rates aren't listed as extra products.
Empty copies. John Deere sometimes sends a tank mix two or three times when only one went out. Copies with every product at exactly 0 are left out, so those jobs now get their Total spray rate. A product really recorded at zero, with no other amount, still shows.
Unmatched products post by name, unpriced, so their cost isn't counted. They don't move stock or keep label details. The row and confirm footer say unpriced so it isn't mistaken for free. A total Phase can't work out stays unknown and never takes guessed stock.
Cost. Each matched product carries its cost into the confirmed job, from the measured or corrected total, at the plan's price when it matched a planned product, otherwise Inventory's price. If a price would cost more than $1,000/ha, the plan's cost is used instead. Costs show wherever finished work is totalled, such as Financial Performance.
Jobs confirmed before 30 September 2026 costed only the machine line, with products at $0. They are not repriced.
If something doesn't look right
The same product shows twice. John Deere's target and applied rates used to show as two products; that is fixed. For an older unconfirmed job, select its season and press Refresh. If a row with no total remains, select Don't use on it.
Two lines are matched to one product. Phase says "Same Phase product on two Deere lines. Review or don't use one."
No Match N product names or Confirm ready jobs button. Each shows only when there is something to do in this season.
I can't save names. Saving needs permission to edit crop plans. Ask the farm owner, or pick the product on each job.