Skip to main content

Confirm, undo or ignore a John Deere job

Confirm a John Deere job into the plan and inventory, undo it, bring an ignored job back, or fix permissions.

P
Written by Phase Team

Confirming a John Deere job in Reconcile records it as completed work on the paddock, against the crop plan and, if you choose, your stock. Here is how to confirm a job, undo one confirmed by mistake, ignore a job or bring it back, and fix a team member who can't confirm.

Before you start

  • Reconcile is at More → Daily work → Work reconcile → John Deere, on Phase Ultra or the free trial.

  • Confirming needs the Record completed work permission, the same as Mark done. Without it you can still review, match and ignore jobs.

  • Undoing needs permission to edit the farm, a higher bar than confirming.

  • Confirming needs a connection, an active subscription and a farm that isn't read-only. If one is missing, Phase says so before it starts.

  • The job needs a paddock. Until it has one, Phase says "Match this job to a Phase paddock first."

Confirm a job

  1. Open the job in Reconcile.

  2. Check the paddock, Area worked and Linked Phase plan. See Review John Deere work in Reconcile.

  3. Check the products under Match the machine products. See Match John Deere products and clear a backlog.

  4. Open More details to check the operator, weather, machine and spray details.

  5. Open Stock settings & more options and decide on Deduct from inventory (see below).

  6. Select the main button. While anything needs attention it reads Review 2 items (or however many) and takes you to the first one.

  7. When it reads Confirm job, select it. Confirm this job? lists the products and amounts to be saved and what happens to stock.

  8. Select Save confirmed job, or Back to review.

If a save fails, your choices are kept. To confirm with a product not matched, open Stock settings & more options and select Record unmatched products by name. That product posts unpriced, so its cost isn't counted, and it takes nothing off stock.

Choose whether stock comes off

Deduct from inventory, under Stock settings & more options, is off unless you turn it on. Off, the job posts as completed work with no stock movements. Make on the default turns it on for every job on this farm, on this device; a job's own tick still wins.

Old jobs leave stock alone. If a job was done more than 30 days before a product was first stocked in Phase (its first receipt or stock count), confirming takes nothing off that product's stock, even with Deduct from inventory on. The 30 days allow for stock dated by an invoice that arrived after the drums were in use. The job still records what was applied and what it cost, and says so, for example "Paddock Clear 450: dated before this product was first stocked (7 Sep 2026), so stock is left alone." It is decided product by product. A product with no stock recorded at all behaves as it always did.

A pass someone already marked done

If someone marked the planned pass done by hand (for example from a crop plan job on the notice board), the job says "This activity was marked done manually. Confirming replaces that record with the John Deere job." Confirming replaces their record with the John Deere one, even when the two are dated on different days, as long as their record covered the whole pass. A record over only part of the paddock is kept beside the John Deere one, which may be the rest of it.

Stock their record took off stays off. With Deduct from inventory on, it comes off at the John Deere amounts instead. With it off, nothing more comes off and nothing goes back.

Confirm ready jobs leaves these jobs unticked with "Its plan job was already marked done by hand", so you check them first.

Check the weather, machine and seeding details

Weather on a spray. If the machine reported conditions, those are used. Otherwise Phase takes your weather station nearest the paddock (never a rain gauge), using the reading closest to the job's start within half an hour either side, or leaves it blank. In More details you can change the station, edit the figures or untick Include. Weeks before a Weather Underground or DPIRD station was connected have only a daily summary, so those jobs are left blank; a Davis station keeps its half-hourly history.

Machine. More details → Machine shows the fleet machine, the time on the job, Running cost $/ha and Diesel L/ha. Diesel is what John Deere logged once Phase has read it; until then, and for the running cost, Phase uses the planned equipment line or the machine record, and says which. Change the machine or numbers, or untick Include cost on record to keep the machine with no cost or diesel line. For tillage, seeding and harvest, also check Machine speed and Working depth.

Seeding a different crop. If the seed on a seeding job is a different crop or variety from the plan, Phase asks whether to update the paddock's crop for the season. Update crop changes the crop, its rotation history and the pass to what was sown. Keep the plan, or closing the question, changes nothing. Only people who can edit crop plans are asked.

Combine passes that belong in one job

  1. Open the job and select Related Deere jobs. It lists other waiting jobs of the same kind on this paddock within 21 days.

  2. Tick the passes that belong to this job.

  3. Select Combine N into this job.

Phase adds up the areas and lists each product once, keeping each pass's spray volume for concentrations.

Confirm identical jobs together

After you confirm a job whose product match you corrected, Phase may find other planned John Deere jobs still open this season that match it, and ask Apply to identical jobs?

  1. Check every job listed, and untick any that don't belong.

  2. If you added a product to the job you confirmed, tick the option to add the Phase-added product to the selected jobs as well.

  3. Select Confirm N selected, or Not now.

Those jobs keep their own paddock and plan activity, and share the Deduct from inventory setting of the job you confirmed, so every selected paddock draws stock if that one did. Jobs set to Actual only (no plan activity) stay out. If one can't be confirmed, Phase opens it with the reason. Until 6 September 2026 only the first paddock took the stock setting; undo and confirm again any that posted wrongly.

Undo a confirmed job

  1. Open the job under the Confirmed heading.

  2. Select Undo confirm, where the confirm button was.

  3. Read Undo this confirmed job? and select Undo. Phase says "Undone. The job is back in the queue to match again."

Undo deletes the Phase record confirming created, its product lines, any stock use and any harvest yield it wrote. The paddock's planned job goes back to outstanding, and the John Deere job returns to the queue to fix and confirm again, for example with Deduct from inventory on. Product name matches Phase has learned are kept. It works straight away; if it can't, the message says why. The job keeps the John Deere date.

Only people who can edit the farm see Undo confirm. If it isn't there, ask the farm owner.

To clear a whole season's records instead, use More → Settings → Organisation → Data & backups → Delete data → Choose what to delete… under Delete work records. See Export everything and back up your farm.

Ignore a job, or bring one back

Ignore takes a job out of the queue without recording anything.

  1. Open the job and select Stock settings & more options.

  2. Select Ignore. The job moves under Ignored.

To bring it back:

  1. Open the job under Ignored. Its main button reads Restore job.

  2. Select Restore job. The job goes back into the queue, still open, ready to check and Confirm job, or ignore again later.

Restoring doesn't re-read the job from John Deere. If it looks out of date, select its season and press Refresh.

If a team member can pull work but can't confirm it

Without Record completed work, Confirm job stays off with "Confirming records this job as completed work, which needs permission to record completed work. Ask the farm owner." Owners, co-owners, admins and staff always have it, and it can't be switched off for staff. Advisers can't confirm John Deere jobs. To check someone's role:

  1. Open More → Settings → Organisation → Team.

  2. Find the person and check their role. An advisor who needs to confirm work would need to be made Staff with ••• → Change role or details.

If they have it and confirming still fails, contact Phase support with their name, the farm, the job, the exact error and a screenshot. Don't disconnect John Deere or change its organisation unless support says the connection is the cause.

Good to know

  • Confirmed work shows in Crop Plan Studio and on the paddock sheet with the John Deere mix name.

  • Stock movements written by a confirmed job can't be deleted in Inventory. Undo the job, or use Edit what was applied; see Fix what was applied, or reopen a finished job.

If something doesn't look right

  • "This reconcile job is already being confirmed on another device". Check whether someone else is confirming it. If an earlier attempt on this device stopped part-way (the connection dropped or the phone slept), the job unlocks itself within 30 minutes, and nothing was changed.

  • I confirmed jobs without taking stock off. Select Undo confirm on each, tick Deduct from inventory, and confirm again.

  • I want the stock use removed from a confirmed job. Undo it and confirm again with Deduct from inventory off, or use Edit what was applied and untick Take it off stock for each product.

  • Undo said it couldn't undo because nothing had changed. That fault was fixed on 6 September 2026. Reload Phase and try again.

  • "An earlier confirmation created a Phase actual but did not finish". Check the completed record on the paddock before retrying.

Related

Did this answer your question?