Add the detail a job in a paddock's crop plan needs: costs such as fertiliser cartage, stubble cruncher hire or a leased paddock, the machine you run, and notes and photos about what happened. Cartage, contractors, hire, fees and leases go in with Add cost, not as a machine. A cost needs no machine and no product.
Before you start
Adding machines and costs needs permission to edit crop plans.
Writing notes needs permission to mark jobs done or edit crop plans. View-only logins can read notes.
A cost sits on an activity. If there isn't one for it yet, choose Add on the paddock's Plan tab, then Cost for a cost on its own (it is added as an Operation named after the cost).
Add a cost such as cartage, hire or a lease
Open Map and tap the paddock.
Open its Plan tab, and open the pass. For fertiliser cartage, use the spreading or seeding pass that carries the fertiliser.
Select Add cost, under the pass's products. The Add to activity window opens with Cost picked.
Under Cost, pick one under Used on this farm, one of the Common costs, or + Add a new cost… and type a Name. A cost used before fills in its kind and the amount it was last planned at.
Choose the Kind of cost. The line under it says where it adds up in Finances.
Choose how it is Charged.
Type the Amount. Leave it blank if you don't know the price yet.
Select Add cost.
Cost is also on the What goes on it step of Add on the Plan tab. Common costs include Fertiliser cartage, Grain freight, Grain receival fee, Contract spreading, Stubble cruncher hire, Land lease and Crop insurance.
Kind of cost | For example | Adds up in Finances under |
Cartage & freight | Fertiliser cartage, grain freight | Freight |
Contract work | Contract spreading, aerial spraying | Labour & contract |
Hire | Stubble cruncher, roller | Hire |
Fees & levies | Grain receival fees, levies | Fees & levies |
Lease & rent | A leased paddock | Lease & rent |
Insurance | Crop insurance | Insurance |
Other | Anything else the paddock pays for | Other |
Machine running costs add up under Machine work.
Contract work is for a contractor working on your own paddocks. Work you do on other farms for pay goes in Contracting (More → Daily work → Contracting), and never reaches your paddocks' costs.
Choose how a cost is charged
Per hectare: the amount is $/ha.
Lump sum for this paddock: Phase divides it by the paddock's area. $1,800 over 150 ha is $12.00/ha. In Crop Plan Studio, a lump sum on several paddocks is spread over all of them.
Per tonne of product on this pass: for cartage at $/t. Under On, choose Every product by weight or one product, such as MAP. The form shows the sum, for example "90 kg/ha × $45.00/t = $4.05/ha, $623.70 for 154 ha". Products measured in litres are not counted, and the form says so.
Per tonne of grain harvested: for grain freight or a receival fee, worked out on the plan's budget yield.
Fertiliser cartage starts per tonne of product; Grain freight and Grain receival fee start per tonne of grain. A per-tonne cost keeps itself up to date: change the MAP rate or the budget yield, on the Plan tab, in Crop Plan Studio or through Phase Agent, and the cartage follows.
Add a cost in Crop Plan Studio or a template
Crop Plan Studio (the Plan page): open the pass and select Add cost. Your costs are listed with the amount each had last time; tap one to add it, or add one that isn't in the list. To change the amount later, type it on the card, then select Save under the line.
Templates (More → Imports & templates → Templates): set a line's Type to Cost.
Rename or merge costs
Once the farm has costs of its own, Manage costs shows beside the Cost label. It lists your costs and how many plan lines use each.
Select Manage costs.
Select Edit on a cost.
Change its Name or Kind of cost, or pick a cost under Or merge into (for example, "Cartage" into "Contract cartage").
Select Save, or Merge if you picked a cost to merge into.
Every plan line and finished job with that name changes together. A merge asks first, and merged costs can't be told apart again.
Move a "machine" that was really a cost
If "Contract Cartage" or "Roller" was set up as a machine only to get a cost onto a paddock:
Open More → Daily work → Machinery → Machines.
Open the machine.
Select More → Not a machine? Move to costs.
Pick the Kind of cost and select Move to costs.
Its plan lines become cost lines. Jobs already recorded with it take that kind and keep their amounts. The machine is retired, and Return to service in its More menu brings it back. This needs permission to edit both the farm and crop plans. Until you move it, it stays a machine.
Add a machine and its running cost
Equipment is a machine you run, with its running cost and diesel. You pick it from Machinery → Machines (the same fleet as Inventory → Machinery).
Open the pass and select Add machine, under its products. In Crop Plan Studio this lists your fleet with the running cost and diesel each machine had last time: tap one to add it. On the Plan tab it opens the Add to activity window on Equipment.
Under Machine, choose one. For a machine that isn't in the fleet yet, choose + Add a new machine… and type its name in New machine name.
Check Running cost $/ha and Diesel L/ha.
Select Add equipment (in Crop Plan Studio, Add machine).
A new machine is added to your fleet when you save. If the name you type is already in the fleet, Phase offers Use it rather than making a duplicate.
Each machine remembers the cost and diesel you last entered and fills them in next time. When you add an activity on the Plan tab and select Add equipment in that form, Phase also suggests the machine this farm last used for that type of work, such as the sprayer for a spray. Check the machine and figures every time; what you type on the activity wins.
An older plan line that holds only a typed name opens as a new machine with that name. Saving links it to the fleet machine of that name, or adds it to the fleet.
Add a note or photo to a job
Notes record what happened: "wind swung north-east after the second tank", "blocked nozzle on the left wing". You can add them to jobs still to do and jobs already done.
Open Map and tap the paddock.
Open its Plan tab, and open the pass.
Select Add note, under Notes on the pass.
Type the note.
To attach photos, select Add photo.
Select Save note.
Each note shows who wrote it and the date. Tap a photo to see it full size. You can also type a Note (optional) on the Who did it step when you Mark done.
Map Notes linked to the job are listed under From paddock notes. Tap one to open it.
No signal. On a phone with no connection, a note added with Add note is kept on the phone, marked "Saved on this phone · sends when you are back in service", and added to the job once Phase is back online. Photos need signal. A note that can't be added (say the activity was deleted) stays with the reason and Discard. Changing or deleting a note needs a connection.
Change or delete a note
You can change or delete your own notes while you have permission to mark jobs done. Anyone who can edit crop plans can change or delete anyone's.
To change a note, select Edit, make the change, then select Save changes.
To delete a note, select Delete. Phase asks "Delete this note?" first.
Where notes show
On the paddock's Plan tab, under Notes on the pass, with the spray Target and the note for the operator.
In Crop Plan Studio, on the open pass, under Notes from the paddocks, with who wrote each and which paddock.
On a job given out from the crop plan, with the target and the plan's note.
In the paddock's History, with the job's record (for example, "2 notes"). A note on a job not done yet is its own Job note entry.
In the Spray Records report: More → Money & records → Reports → All reports, then Spray Records.
See what a finished job cost
A finished job costs what was actually used. On the job's card, with Actual picked, the cost shows as $/ha actual.
Change an amount under Actual quantities used when you Mark done and the cost follows: the amount used at the product's price, over the area worked. Leave Phase's amounts and it costs what the plan said.
The price is the plan price typed on that product, else Inventory's price (your stock's price, or the list price), else the price the plan was costed at.
The record shows the rate that went on: 25 kg/ha used on a 30 kg/ha plan records 25 kg/ha.
If a price would make a product cost over $1,000/ha (usually a per-kilogram price that should be per tonne), Phase keeps the plan's cost for it.
Machines and costs (on the What went on step of Mark done) are recorded at their planned $/ha for the area worked.
The exception is a per-tonne cost marked done in Phase. It charges what was actually applied, or for grain the harvest's yield, else the paddock's yield record for the season, else the budget yield.
A pass reconciled from John Deere records its planned costs, per-tonne ones included, at their planned $/ha for the area worked.
This applies to jobs finished from 30 September 2026; earlier jobs keep the cost they were saved with. Correcting a product, rate or unit with Edit what was applied works the cost out again. The cost shows wherever finished work is totalled, such as actual cost and gross margin in Financial Performance.
Good to know
A cost counts in the activity's $/ha, the plan's budget and the gross margin. Nothing is added to the machine list.
If your grain price is already net of freight and receival fees, don't also add those fees as costs, or they are counted twice.
A template keeps each machine line's $/ha and diesel. An older template without them fills each line from what you last entered for that machine.
A note holds up to 4,000 characters and 12 photos.
Reopening a job keeps its notes. Deleting the job, its plan or its paddock deletes them.
If something doesn't look right
A cost added after the job was done isn't counted. The finished record keeps the machines and costs it had when marked done. Reopen the job, add the cost and mark it done again, checking the amounts. See Fix what was applied, or reopen a finished job.
A per-tonne cost shows $0/ha. No product on the pass is measured by weight yet, or the plan has no budget yield.
"The job is recorded, but its note did not save". Add it again with Add note under Notes on the pass. The message repeats your words.