Why This Matters
A smooth sales process means more closed deals and happier customers. This walkthrough guides you through every step so you can present financing options with confidence and close deals faster.
What You'll Need
Admin access to SubcontractorHub
A web browser (Chrome or Edge recommended)
Step-by-Step Instructions
Step 1
Sign in to your SubcontractorHub account with your username and password.
Step 2
Click on the "New Customer" button at the top of your screen to create a new lead.
Step 3
Input the customer’s address and basic information. The address can be added manually by clicking on the “Manual Address” checkbox. Select the job type and assign it to a user by clicking “Assign To”. Fill out setter and lead source details, as well as other information. Then click “Create customer” in the top-right corner of the page.
Step 4
You have now created a proposal card. Click "View Detail" to begin generating a design and pricing. You can title a proposal by clicking “Add Title”.
Step 5
Click the “Utility” drop-down box in the Consumption profile section and select the correct utility provider.
Step 6
Scroll down to enter the client's kWh usage. You can opt to either enter the monthly or annual usage by switching the toggle. The predictive AI will also generate an assumed consumption amount based on the address entered. Likewise, if you only have a few months of data available, the software will attempt to auto-fill the other months' data.
Step 7
Click “Start Design”.
Step 8
Most homes will be able to utilize the AI-Assisted design tool. Identify the correct home, align it with the tool’s crosshair and click "Run AI Design". If you are working in a market where the AI-Assisted tool does not function seamlessly, you can toggle to " manual design" mode. Reference the "Switch from AI-Assisted Design to Manual" guide for detailed instructions.Note:If the"Enable BrightStar" toggle is activated in the design tool, only BrightStar finance products will be visible, and finance options from other partners will be hidden.
Step 9
Click on the modules that you want to include in the design. You will notice the system size, offset, and production all change in real time. You can also adjust the system offset with the slide bar. If you wish to further adjust the design, switch to AI-Assisted edit mode. Updateelectric billpricing andannual usageto suit your customers' needs. You can also select the type of panel that goes into the system alongside the design.
Step 10
Click“Save”.
Step 11
Your AI-Assisted Design is ready with system size details. You can add an inverter and edit escalation, PPW, mounting type, and roof type in this section.
Step 12
Scroll down and turn on the battery toggle to add batteries to your proposal.
Step 13
Choose if you would like to quote a backup battery OR a grid-tied battery here.
Step 14
Add as many rooms or appliances as your customer needs to back up. Select the room or appliance to increase or decrease the quantity. The battery recommendation algorithm will calculate how many batteries the customer needs to back up the added rooms or appliances and increase or decrease the number accordingly.
Step 15
Select your battery from this section. Selecting Storz Power backup is a mandatory requirement in certain territories when choosing BrightStar's Lease products.
Step 16
If you require additional adders to your quote, scroll down to the “Add-on” section. This section is optional. Click on “Choose Adders”.
Step 17
Select the adders you need and click “Done”.
Step 18
You can add the down payment amount before selecting your finance options.
Step 19
Scroll down to the financing section of the proposal and selectFinancing (Fully Integrated).
Step 20
Select “BrightStar” to use BrightStar’s leasing products.
Step 21
Open the dropdown to select the Leasing Option that suits your customer’s needs and budget.
Step 22
Open the dropdown to select the pricing for the lease.
Step 23
Click “Create Quote”.
Step 24
The BrightStar finance card will be generated with details of the Lease. Click “Finalize”.
Step 25
Now the proposal is finalized and your customer is ready to qualify for BrightStar’s leasing products. Click “Apply” to qualify your customer.
Step 26
Enter the customer’s details, check the acknowledgment boxes, and click “Submit”.
Step 27
If your customer qualifies, you will receive a congratulatory pop-up window to confirm the pre-qualification. Click on the “Ok” button.
Step 28
When a homeowner qualifies, the“Qualify” icon will transition to blue and read"Qualified".Click“Sign Initial Document” to sign the contractOnce the"Sign Initial Document" button is clicked, a URL will be generated.
Step 29
Click“Open URL”
Step 30
Follow the signing process and complete the initial document signing process.
Step 31
After completing the initial document signing, head back to SubcontractorHub and click the“Sync Doc Status” button on your finance card. Note:The“Signed Initial Document” will be available in the Attachment section of your proposal
Step 32
Click on the“Upload Documents” button on the finance card.
Step 33
A list of stipulation documents will appear in the pop-up window. Click on each document name tab to upload the corresponding files.
Step 34
Click on“Upload a file”
Step 35
Click“Save” after uploading the document.
Step 36
Each successful upload will be marked with a green checkmark next to the document name.
Real-World Example
💡 A new sales rep follows this walkthrough during their first customer meeting. With each step laid out clearly, they present financing options confidently and close the deal on the first visit.
Pro Tips
Start small: Test this feature on one project before rolling it out company-wide.
Need help? Contact SubcontractorHub support — they're always happy to walk you through it.
Bookmark this guide: Come back anytime you need a quick refresher.
Troubleshooting
Problem | Solution |
Setting doesn't appear | Make sure you have admin access and the correct permissions enabled. |
Changes not saving | Refresh your browser and try again. Check your internet connection. |
Feature not working as expected | Clear your browser cache or try a different browser. Contact support if the issue persists. |
Change Log
Date | Change |
May 2026 | Rewritten for clarity; simplified language for non-technical contractors; added images and troubleshooting. |





