Glossary: Trunk Tools & Construction Terms
A quick reference for the terms you'll come across in Trunk Tools and across this help center, both our product names and the construction terms they work with.
Trunk Tools Terms
Cortex — the construction intelligence layer behind Trunk Tools, the "brain of your project." It reads your project documents, connects them, and powers the agents.
Agents — purpose-built assistants that run on Cortex and handle specific workflows. Trunk Tools builds, maintains, and runs them for you.
TrunkText — the project Q&A agent. Ask a question by text, web, or Teams and get answers cited from your project documents.
TrunkSubmittal — reviews submittals against their specifications and flags compliance issues automatically.
TrunkRegister — reads the spec book and builds your submittal register, categorizing each requirement, then pushes it back to your project management system.
TrunkReview — reviews drawing, bulletin, and revision sets, producing a written narrative of changes and a visual overlay, including changes the architect didn't cloud.
TrunkRFI — checks whether an RFI is actually needed and drafts the ones that are, writing them back to Procore or Autodesk Forma.
TrunkBid — compares subcontractor bids side by side to surface inclusions, exclusions, and scope gaps before buyout.
TrunkBrowse — click any object on a sheet to open its full context: the schedule row, spec section, RFIs, submittals, and other sheets it appears on.
TrunkChange (available for early adopters) — detects a change event the moment a bulletin or RFI response lands, traces every affected trade, reports the cost, schedule, and scope impact, and drafts the change order.
Knowledge graph — the map of relationships between all of your project's documents that lets each agent reason with the full picture, not one file in isolation.
Artifact — an output an agent generates for you (for example, a compliance analysis or a draft email) that you can review, edit, share, or download.
Construction Terms
GC (general contractor) — runs the build and coordinates the subcontractors.
Sub / subcontractor — a trade contractor responsible for a specific scope, such as mechanical or drywall.
Owner / developer — the party paying for and commissioning the project.
RFI (Request for Information) — a formal question to the design team to clarify drawings or specs.
Submittal — a subcontractor's proposed product, material, or shop drawing, sent for review against the spec before installation.
Spec (specification) — the written requirements a submittal has to satisfy.
Spec section — a numbered portion of the specification that a submittal or RFI is tied to.
Drawing / sheet — the graphic record of what gets built, communicated through geometry, symbols, callouts, and cross-sheet references.
Bulletin / revision — an issued set of drawing changes during a project.
Revision cloud (clouded vs. unclouded) — a cloud the architect draws to mark a change. An unclouded change is one they didn't mark, the kind that slips past and becomes rework.
ASI — Architect's Supplemental Instruction; a minor design clarification or change.
Change order (CO) — a documented change to scope, cost, or schedule.
Buyout — awarding subcontracts after bidding.
Long-lead procurement — ordering items with long lead times, which can be delayed when submittals are stuck.
Schedule of values — the breakdown of contract value used for billing.
OAC meeting — Owner–Architect–Contractor coordination meeting.
Daily log — the field record of what happened on site each day.
Punch list — the remaining items to complete or fix before closeout.
MEP — mechanical, electrical, and plumbing scopes.
AHU — air handling unit; rooftop HVAC equipment.
PMS (project management system) — the system of record for your project, such as Procore or Autodesk.
