Setting up Hub & Spoke sites

Configuring hub & spoke settings for the sites within your company

Summary

Hub and spoke lets one kitchen produce for several shops: spokes plan their daily quantities, the hub makes the combined total, and the finished items are transferred back to each spoke. A site can be linked to one hub only, and a site can never be both a hub and a spoke.

Every change to a link or to where a production is made applies from a date you choose, today or later. Days before that date stay exactly as they were.


Setting up a Hub or Spoke

To setup a site as either a Hub or Spoke you should go to Settings > Production > Hub & Spoke.

The Linked sites section is where assign whether a site is a Spoke or a Hub.

  1. Under Spoke site, choose the site that will request production.

  2. Under Hub site, choose the site that will make it.

  3. Under From, choose the date the link starts. Leave it blank to link from today.

  4. Select Link sites.

The new relationship appears in the list below as "Spoke Site -> Hub Site". Use Filter by site to see a particular sites setup. A link that starts on a later date shows From [date] on its row until then.

From the start date, anything the spoke has already planned for those days becomes a request to the hub. Days before the start date are unchanged.

⚠️ A site can be linked to one hub, and can never be both a hub and a spoke. If a site is already a hub, it can't also be set up as a spoke, and vice versa.

Changing a spoke's hub

To move a spoke to a different hub, select the arrow icon on its row. The Change hub panel opens.

  1. Choose the New hub site.

  2. Under From, choose the date the move happens.

  3. Select Change hub.

From that date, plans move to the new hub and follow its cutoff schedule. Days before it stay with the current hub and complete as normal. The row shows Hub changes to [hub] on [date] until then.

You can't change the hub while an unlink is waiting to happen. Cancel the unlink first.

Unlinking a spoke

To remove a link, select the bin icon on the row.

  1. Under From, choose the date the spoke goes back to standalone production.

  2. Select Unlink.

From that date, anything the spoke requested from the hub moves back to the spoke's own plan as self-made. The row shows Ends [date] until then.

Cancelling a change that hasn't started

A link, hub change or unlink that starts on a later date shows on its row with Cancel beside it. Select Cancel. For a hub change or unlink, confirm with Cancel hub change or Cancel unlink, or select Keep it to leave it in place.

Cancelling puts planned production back where it was before the change.


Setting the cutoff schedule

The cutoff is the time a spoke's plan locks for a given production date. Before the cutoff a spoke can edit and re-save freely; after it, any change needs the hub's approval. Select Cutoff schedule on a linked row to open the Cutoff schedule panel for that hub.

Two sets of cutoffs are configured separately:

Fixed production

You can set a Default cutoff time which will apply as the default cutoff time for everyday unless an alternative cutoff time is set. This default cutoff time will apply to every Spoke linked to the Hub unless alternative cutoffs are set.
​
To set alternative cutoff times use the toggle to enable a cutoff for that day. Use the dropdown to select the time of the cutoff and the lead-day (e.g. day before, 1 day before, 2 days before etc).

Variable production

Variable production is intraday, so its cutoff is same-day and time-only - there are no lead days. Each row has a toggle and a time only.

How the rows combine:

Setting

Explainer

Default

Applies to every day that doesn't have its own row enabled.

A specific day (e.g. Sunday)

Overrides the default for that day only, when its toggle is on.

No default and no specific days set

Spoke plans never lock - there is no cutoff.

Cutoff times are shown in the hub's local timezone. Select Save schedule when you're done, or Cancel to close without changing anything. A Cutoff schedule saved confirmation appears.


Choosing what productions the hub makes

When you link a site as a spoke, every one of its productions is set to be made by the hub. You can leave it that way, or switch individual productions back to be made at the site - so a spoke can request most of its productions from the hub while still making some itself.

This is set in the site's own production settings, not on the Hub & spoke tab.

Go to Settings > Sites, select the site, and choose Production settings. If the site has been setup as a Spoke you will see a "Spoke of [hub]" pill.

Within the Enabled productions section each production run has a made at dropdown. To set it so a site makes its own production just change this to This site rather than the Hub.

  1. Change the made at dropdown.

  2. Under From, choose the date the change starts.

  3. Select Make here (or Make at hub if you're switching to the hub).

From that date, anything already planned for that production moves to match: to the hub as requests, or back to the site's own plan. The run shows Changes to [site] from [date] until then. Select Cancel beside it to keep the current setting.

💡 The Made at dropdown is only available on productions the Hub is enabled to do. For example, if a Hub only does Production 1 and 2 while you can still enabled Production 3 for the site, you cannot assign it to the Hub and there will be no Made at dropdown.
​


Setting a Hub or Spokes Range & Tiers

A product appears in a spoke's Production Planner only if it's in both the spoke's range and the hub's range. Each range is set independently, so both have to include the item for the spoke to plan it.

If a spoke needs an item that isn't showing on its planner, check it is in both the Hub & Spokes assigned range/tier for the day.

Find out more about Tiers & Ranges here.

⚠️ A product only reaches a spoke's planner when it's in both the spoke's range and the hub's range. If an expected item is missing, one of the two ranges is the usual cause.


If it doesn't work

The change was refused because it would move planned production

The message says why:

  • The hub has already locked its plan for a date. Choose a later From date.

  • A late plan is awaiting the hub's decision. The hub needs to accept or reject it first.

  • Not enabled at the hub, or the hub can't make the components of a recipe. Enable those recipes at the hub, or keep that production at the spoke.

Nothing changes when a change is refused.
​

I can't select the arrow icon to change a spoke's hub

An unlink is waiting to happen on that row. Select Cancel beside it, then change the hub.
​

I can't delete a site

A site can't be deleted while it's a hub or spoke from today onwards, or while it has production planned for today or later. Unlink it here first, or wait until a day when it has no production planned.

Did this answer your question?