Skip to main content

John Deere Operations Center

Connect John Deere Operations Center to bring in fields, completed work, diesel, job maps and yields.

P
Written by Phase Team

Connect John Deere Operations Center to bring your John Deere fields, completed work, diesel, job maps and yields into Phase. You connect once, on the John Deere Operations Center page, and each kind of data then comes in on the screen it belongs to.

Where to find it

The More menu is the same on a computer (top navigation) and a phone (bottom bar).

  • Connection: More → Integrations → John Deere Operations Center.

  • Fields and boundaries: More → Paddocks & crops → Farms & Fields → Actions → Import from John Deere.

  • Completed work (Reconcile): More → Daily work → Work reconcile → John Deere, or the Work queue tile on Overview, or Work reconcile on the connection page.

  • Yields: More → Paddocks & crops → Yield Centre → Import, then Harvest yields or Yield maps under From John Deere.

Reconcile used to be a tab in Inventory. It moved to Data Feeds in October 2026 and works the same inside; old links forward there with the note "Reconcile has moved here from Inventory."

What you can do here

Connect John Deere

  1. Open More → Integrations → John Deere Operations Center.

  2. Select Connect John Deere.

  3. Sign in to John Deere, choose your Operations Center organisation and approve access for Phase.

  4. Back in Phase, check the header reads Connected with your organisation's name. The main button now reads Open Deere permissions.

  5. Under Active organisation, check your organisation shows Using. To use another, select it.

An organisation marked Needs approval in Deere hasn't approved Phase yet. Select it, approve Phase in John Deere, then come back and choose Actions → Refresh.

The page also lists the Connection (account, selected organisation, permission manager, last sync), John Deere access (what Phase may read, each with a state such as Set in Deere or Ultra) and Shortcuts to Import fields, Work reconcile, Yield Centre and Maintenance (machine hours).

Change organisation, reconnect or disconnect

  • Another organisation. Select it under Active organisation. Phase uses one John Deere organisation per Phase farm. Reconcile also has Change JD org in the ••• menu beside Refresh.

  • Change what Phase can see. Select Open Deere permissions, change access in John Deere, then come back and choose Actions → Reconnect Deere.

  • Reconnect. When the header says Reconnect needed, choose Actions → Reconnect Deere.

  • Disconnect. Choose Actions → Disconnect John Deere and confirm. Phase stops pulling fields, work and machine data, and removes itself from your organisation's connections in John Deere Operations Center too, so there's nothing to remove on the John Deere side. If the same John Deere organisation is linked to another of your Phase farms, that farm's link is left alone. Paddocks, jobs, yield maps and machines already in Phase stay, and you can reconnect any time with Connect John Deere.

What Phase can bring in

Depending on your John Deere permissions and your Phase plan:

  • Farms, fields and boundaries, and your John Deere machine list (Phase Pro and Ultra).

  • Completed field work, checked every night, to review in Reconcile (Phase Ultra and the free trial).

  • Each job's diesel, and maps of what was applied, the target rate, yield, diesel use and ground speed (Phase Ultra).

  • The ground height the machines logged, as the paddock's elevation in Phase Spatial (Phase Ultra).

  • Machine hour meters for service reminders, and harvest yields and yield maps (Phase Ultra).

Phase doesn't build a crop plan from John Deere data. Make the plan in Crop Plan Studio or import one; completed John Deere work is then matched to it in Reconcile.

How John Deere fields find your paddocks

Import fields from Farms & Fields, not Reconcile, which is only for completed work. When you import fields or update a boundary from John Deere, Phase looks for each field's paddock in this order:

  1. The same John Deere field ID (a paddock that came from that field before).

  2. The same name on the farm you are importing into.

  3. The same place: a boundary and area in the same spot.

It never takes a paddock already linked to a different John Deere field. Each match says Same Deere field ID, Same field name or Same boundary and area, and you choose Update existing, Import as new or Skip. Nothing changes until you import. Areas come in as hectares; a paddock kept in acres has its arable area converted too. A paddock in several pieces keeps every piece. To repair a boundary that came in wrong, import again with Update existing.

Phase reads the boundaries for the whole organisation together, so an operation with hundreds of paddocks loads in one go rather than paddock by paddock.

A paddock with a dam or scrub cut out. When a John Deere boundary has ground cut out of it, John Deere also gives the paddock's workable hectares. The import keeps the whole paddock, fence to fence, as its Total area, and puts John Deere's workable hectares in Arable area. The review row says so, for example "101.2 ha · 93.6 ha arable". Sowing, spraying, budgets and costs use the arable area. An arable area already on the paddock is never replaced, whoever entered it: John Deere's only fills a blank one. A paddock with no cut-outs comes in with no arable area, as before.

If John Deere data is missing

  • The connection page reads Connected with the right organisation. If not, use Actions → Reconnect Deere or pick the organisation.

  • The fields or jobs exist in Operations Center, and your John Deere account may see them.

  • Your farm is on Phase Ultra or the free trial for work, diesel, maps and yields. Once a trial ends or a subscription stops, Phase stops pulling work.

  • The season selector is on the season the work was done in, and the date range covers it. Today's work arrives overnight, or press Refresh in Reconcile.

  • A missing yield map: open Yield Centre → Actions → John Deere yield maps. A paddock showing Did not finish under On the way from John Deere has the reason beside it.

  • No diesel or maps yet: a job older than a fortnight fills in overnight, or press Get the diesel John Deere logged on it. Maps need the paddock to have a boundary.

  • John Deere terms to accept on the connection page, or a Reconcile message with a link to John Deere's terms: John Deere has paused your organisation until someone in it accepts John Deere's updated terms. Accept them with Open John Deere's terms (or the link in the message), then try again. Reconnecting won't change it.

"Load failed" or "Could not reach the Phase John Deere sync API". Your device couldn't reach Phase. Check reception or Wi-Fi, close and reopen Phase, check the connection page says Connected, then try again.

Work held by a contractor. Phase reads the organisation under Active organisation, and only what the signed-in John Deere account may see there. Sharing only your farm from a contractor's organisation depends on their Operations Center permissions, so contact support before setting it up.

If data is still missing, email support@phase.ag with the John Deere organisation, date range, field names, any error wording and a screenshot.

Who can use it

  • Phase Pro connects John Deere and imports fields, boundaries and the machine list. Everything else needs Phase Ultra, which the free trial includes.

  • Farms & Fields, and so the field import, is only for people who can edit the farm.

  • Confirming a job needs the Record completed work permission; undoing one needs permission to edit the farm.

Did this answer your question?