Skip to main content

Mark work as done

Record a spray, spread, seeding or harvest as done, with the date, area, amounts and stock used.

P
Written by Phase Team

Mark a planned spray, spread, seeding, harvest or other pass done to record the date, area, operator, amounts used and conditions. This is how you make a record of completed work (an "actual") in Phase, and it takes the products used off your stock.

The quick answer. Open Map, tap the paddock, tap Plan, and select Mark done on the pass marked Next. Or do the same in Crop Plan Studio. Mark done opens a card on the pass that asks one question at a time, each already filled from the plan, so Next is often all it takes. Any other pass is marked done from its ••• menu (Mark done…). There is no button that marks a whole plan done at once: you record one job, then Phase offers the same job on every other paddock where it is planned.

Before you start

  • You need the Record completed work permission. Owners, co-owners, admins and staff always have it. Adviser logins don't.

  • The pass needs to be on the plan. For unplanned work, add it first with Add on the Plan tab or in the Studio, then mark it done.

  • John Deere work is recorded through Reconcile: see Review John Deere work in Reconcile. To bring in a past season's records from your previous farm software, see Import a season's actuals.

Mark a pass done

Each step's Next says where it goes (Area, Products, Conditions, Who did it, Check), and the arrow at the top left goes back.

  1. Select Mark done on the next pass, or Mark done… in another pass's ••• menu. The arrow beside Mark done opens the card at one question: Done on another date…, Done on part of the paddock… or Record what was actually applied….

  2. When it was done: tap or slide the strip of days up to today, or Pick from a calendar.

  3. Area done: if the pass covers several paddocks, pick Which paddock first; the others are offered as the same job afterwards. Leave Whole paddock, or choose Part of it and type the hectares or a % of paddock.

  4. What went on: check each product's amount for the area done, with − and +, and which silo or shed it came out of. Check the machines and costs, the bale count on a baling pass, and the water rate when a mix needs one. Leave Take what was used off stock ticked to take the amounts off stock, or untick it.

  5. Conditions: Phase fills them in from the nearest weather station. Change them, or leave them off.

  6. Who did it: under Operator, tap someone on the farm's team or type any other name. Record it as is only for a pass planned as the wrong kind of work, such as a spread planned as a spray. Add a Note (optional), such as "missed a strip by the dam".

  7. Check: read the ticket, then select Mark done.

The card says, for example, "Knockdown done", the pass settles with Reopen, and a message offers Undo with a ring that runs out over six seconds (⌘Z or Ctrl+Z works too). Marking two passes done in a row says "2 passes marked done", and one Undo takes both back. The record, product lines and stock use are saved together or not at all.

Amounts and cost. The amounts start at the plan's rate over the area done, and the finished job costs what you record, so check them before you confirm. Machines and costs such as cartage are recorded at their planned $/ha for the area worked. A per-bale cost names its kind of cost and says how the bale count makes the cost.

Jobs and the notice board. A crop plan job's Mark done in Jobs, and on the notice board (the job's sheet, or a row's Mark done), opens the same card.

Choose the right date

The day you pick on When it was done is the date the job shows as done everywhere: "Done 7 May 2026" on the Plan tab, in Completed · N passes in the Studio, in History, in the withholding and plant-back checks and on reports. It is not the day you pressed the button.

  • It can't be a day still to come.

  • On the plan sheet's Mark done, swipe the strip of days, or tap Pick from a calendar for any earlier day, however long ago. The strip then moves to that day so you can nudge it a day either way. The plan sheet's Add calendar reaches any earlier day too.

  • For a job in the current season, or one still to start, it starts at today.

  • For a job in a finished season, it starts on the planned date (or the season's last day if there is none), with a line asking you to change it to the day the work was done.

To change it later, reopen the job and mark it done again with the right day. The date's pencil on the pass only moves the planned date. See Fix what was applied, or reopen a finished job.

Say which silo the seed came out of

If a product is kept in more than one silo, shed or stack in Grain & Hay Storage, the What went on step asks which one it came out of, under its amount. It lists each silo holding that product and how much is in it, marking any with "(less than this)".

  1. Choose the silo. It goes down by the amount when you select Mark done.

  2. If that silo holds less than was sown, a second choice appears: The other … t came out of. Pick where the rest came from. A line says what comes from where, for example "7.95 t from Silo 9 and 4.37 t from Silo 8." The first silo is emptied.

Leave the second choice on Nowhere else and it all comes off the first silo, which reads empty until it is counted. Leave Came out of on Choose later and the seed comes off the product's total and waits in Grain & Hay Storage under Not taken out of a silo yet until you choose.

The question only appears when neither the plan line's shed nor the product's default shed says which silo, and not while Take what was used off stock is off. Products in one silo, and chemicals and fertiliser in Inventory's own sheds, aren't asked about.

Mark the same job done on other paddocks

After Mark done, if the same open job is planned on other paddocks this season, Phase opens Mark same job on other fields?. It lists every matching paddock on the farm, not only those selected in the Studio. Each starts ticked, with its area in a box.

  1. Untick any paddock that wasn't done or used different amounts, and mark those on their own.

  2. Change a paddock's area if only part of it was done.

  3. If the job you finished has product lines the others' plans don't, choose whether to leave Add the extra product lines to selected jobs ticked.

  4. Select Mark N other fields done, or Not now.

Each paddock is recorded at its own plan's rates over the area in its box. The date, operator, conditions, Record it as and the stock choice follow the first job. The silo doesn't: the other paddocks' seed waits in Not taken out of a silo yet, because they may have been sown from a different silo.

When you mark a crop plan job done from the notice board, only that job's paddocks start ticked. Other matching paddocks on the farm are listed, unticked.

When the seed sown differs from the plan

If a seeding pass is marked done (or a John Deere seeding job confirmed) with seed of a different crop or variety from the plan, Phase asks, for example, Update the paddock's crop for 2026?, naming what was planned and what was sown. Update crop changes the paddock's crop for the season, its rotation and the pass, and shows in Change history. Keep the plan, or closing the question, changes nothing. Only people who can edit crop plans are asked.

Mark done with no signal

On the Phase iPhone and Android apps you can mark a pass done on the Plan tab or in Crop Plan Studio with no connection, or while the farm is still loading. The pass shows Done, waiting to sync, and a line at the top of the screen counts the jobs waiting. Back online, Phase records each one exactly as entered (date, area, amounts, operator, note and silo) and takes the stock off then. The same-job and crop questions aren't asked for these jobs.

If the pass was changed, deleted, moved or marked done by someone else in the meantime, it isn't saved. The line at the top says so, with Review: each job says why, with Try again or Discard, and you can mark the pass done again.

  • The phone must have loaded the farm once while online before it can keep jobs.

  • The web app always needs a connection.

  • A phone that shows a connection but has no data shows an error, because the job may have saved. Check the pass before marking it done again.

What a finished job looks like

A finished job shows Done 3 Sep 2026, with the year, because finished work stays on the paddock across seasons, and its Mark done button reads Reopen. Choosing Date completed under Sort by puts finished work first, most recent at the top, with work still to do below in planned order. John Deere work also shows its Deere mix name.

If something doesn't look right

  • I can't find the Complete activity form. It is gone: Mark done opens a card on the pass that asks one question at a time, with the same questions.

  • I can't see Mark done. Only the pass marked Next has the button; mark any other pass done from its ••• menu (Mark done…). You also need the Record completed work permission. Staff always have it; adviser and view-only logins don't. If it reads Reopen, the pass is already done.

  • "Could not complete activity". Check whether the pass shows as done before trying again.

  • "The job is recorded, but its note did not save". Add the note again with Add note under Notes on the pass.

  • The wrong date, amount or product went on the record. See Fix what was applied, or reopen a finished job.

Related

Did this answer your question?